Loading...
Fairways-CS 931202COPPELL PUBLIC WORK~ MEMORANDUM DA .T]~: TO: FROM: RE: Decembcr 2, 1993 Lan;y Davis, Construction Inspector Howard L. Pafford, Utilities Sul~intendent Follow-up Walk-Through for Fairways at Rive] Utilities personnel have ].~rforlll~d a follow up to the initial walk-through and found all ],revioualy mtntioned items have been addressed. There is one last item that should bc addressed as it relaters to water and sanitary s~wer. The screening walls and gate support feature,s should be plac,~! wh~re they do not conflict with the water or sewer lines. When constructing a wall parallel to a water line there should be 7.5 feet of separation and at the end of a screening wall there should be at least $ feet of separation. Tht gatt supports art bring built in direct conflict with the water and sewer lines. Please address thest issues before accepting this project. you have any questions regarding this matter, pleas~ advise. .HLP/dm WALKTHRU/FAIRWYS.HLP