Loading...
Fairways-CS 931130 (2)COPPELL PUBLIC WORKS MEMORANDUM DATE: TO: FROM: RE: November 30, 1993 Larry Davis, Construction Inspector~ Rey GonZales, Streets Superintendent~/ Walk Through - Fairways @ Riverchase The following items were found to be deficient in our recent walk through: 1. Construction joint in alley not sealed (not sealed because of water running through it from clubhouse side of wall - potential drainage problem) (entry pavers have a slight appearance of being uneven and wavy. Some gaps between pavers may be excessive to create a good "lock up"). 2. Grinding performed in these areas addressed in appearance later by patching compound. 3. Edges look loose. 4. Cracks in sidewalk sections. 5&6. Random cracking near saw joint. Please make sure the contractor(s) receives a copy of this list in order to ensure that these issues are addressed. Thank you and should you need further information please let me know. PB/dm cc: Central File WALKTHRU/HLP.FAIRWAY.RG