Enclaves-CS 950925 (3) Coppell, ~19
/~ ;~Oe. BCo~tY477ith A Beautiful Future 214-462-00~2'2'-
Coppell, Texas 75019
September 25, 1995
Mr. Don Giles
Giles Construction Company
1721 W. Plano Pkwy, Suite 100
Plano, Texas 75075
RE: Enclaves on the Parkway
Dear Joe,
Inspection service was provided by the City of Coppell Engineering Department at the
referenced location on Saturday, September 23, 1995. The overtime rate including salary and
benefits is $30.00 per hour. Two hours were charged to your company on that date.
Please send a check for $60.00 payable to the City of Coppell to the following address:
City of Coppell
Finance Department
P.O. Box 478
Coppell, TX 75019
Attention: Alan Johnson, Finance Director
If you should have any questions, please contact me at (214) 304-3685.
Since~2y'
· Gar~~. C~
Construction Inspector
cc: Doug Stevens, Engineering Technician
Finance Department
file/ovt, ltr