Loading...
DCT Fellowship- CS150902Y H i T Y o F COPPLLL A a %A EARLY GRADING / EXCAVATION PERMIT IN RIGHT-OF-WAY / EASEMENT / PRIVATE PROPERTY City Contractor p Date.. ❑ ❑ Grading plans provided and approved. (Erosion Control must be installed prior to beginning work.) ❑ ❑ Tree Removal Permit from Parks & Recreation Dept. required. ❑ ❑ Hold Harmless Letter from the Property Owner/Engineer/Developer is attached. Project Name/Location: General Contractor. IMA14C LLQ Permit issued to Company/Representative. _ . Address: Telephone #: Emergency Telephone #: :ienerai uescripuon or worK kproviae copy or approvea pians: ➢Is removal of existing street, alleys, or sidewalks necessary? (}Yes No if YES, Attach Bore/Street Cut/Saw Cut Permit As Floodplain Permit required? QYes to if YES, Permit # - or date of City Council variance - Early Grading / Excavation Permit Page 2 Representative(s) of the Contractor must adhere to all construction standards approved by the City of Coppell, which includes but is not limited to: Erosion Control Ordinance, compaction requirements (density tests will be required at the applicant's expense), Tree Ordinance and barricading according to the Texas Manual on Uniform Traffic Control Devices. Area(s) affected must be restored to as good condition as before the commencement of work (grading, drainage, vegetation, and erosion control). );,Any work requiring closing of a lane of traffic, street, or alley must be approved by the Engineering Dept. with notification to the following prior to closing: Police Department @ 972-304-3600 Fire Department @ 972-304-3512 Street Department @ 972-462-5150 Engineering Department @ 972-304-3679 ➢Attach barricade plan / trench safety plan of a lane or street closure is required. Note: Street closures are allowed from 9:00 a.m. until 3:30 p.m. ONLY unless otherwise approved by City Engineer. ➢A 2% inspection fee for grading is required prior to beginning work. (Attach copy of excavation contract for verification) Amount Paid $ ' 4� �' L Date Paid ❖City inspector must be notified 24 hours prior to beginning work related to this permit. Printing your nam indicates your acceptance of the terms and conditions of this form: Signature of Appl' nt/Contractor Rep. Date Engineer City Inspector for this project Date Contact Number(s) Applicant shall indemnify and forever hold harmless against the City of Coppell each and every claim, demand or cause of action that may be made or come against it by reason of or if any way arising out of the closure, blocking, excavating, cutting, tunneling, or other work by the applicant under permit from the City, if such permit is granted. Submit by E mail INSPECTION FEE CALCULATION SHEET Project Name Date As per the City of Coppell Subdivision Regulations, the Developer shall pay 4% of the cost of the items to be permitted and inspected by the Engineering Department and dedicated to the City. The Developer shall pay 2% of the items to be inspected by the Engineering Department, but not dedicated to the City such as parking lots, private utilities, private drainage systems and so forth. Inspection fees are due on or before the date of the Pre -construction Meeting. In order to verify the inspection fee due, please provide a copy of the development contract(s) and this spreadsheet with completed calculations to the Engineering Dept. The contract(s) should indicate the cost to construct the following improvements: Grand Total (total both colored fields)) PUBLIC IMPROVEMENTS CONTRACT AMOUNT X4%- PRIVATE IMPROVEMENTS CONTRACT AMOUNT X2%= Paving Water Sanitary Sewer Storm Sewer Alleys Sidewalks tether U� tal Grand Total (total both colored fields))