DCT Fellowship- CS151118PROJECT: Lot] Blk 1 DCT Fellowship west
DATE: 10/27/2015
Water Impact Fee:
Domestic Meter(s): 1 - 2 inch = 5.33
ESU's
Irrigation Meter(s): 1 - 2 inch = 5.33
ESU's
0 = 0
ESU's
Fireline Meter(s): 2 - 8 inch = 2.5
ESU's
Total #: 13.16 ESU's @ $900.00 ea.
$11,844.00
(Due prior to issuance of building permit)
Water Tap Inspection Fee:
Total #: 4 Connections @ $50.00 ea.
$200.00
(Single family due prior to issuance of building permit)
(All other developments due prior to issuance of meter)
Domestic Water Meter Fee:
Total #: 1 Domestic Meter(s) @ $882.00
$882.00
(Single family due prior to issuance of building permit)
(All other developments due prior to issuance of meter)
(This fee may change at the time of pick up)
Irrigation/Fireline Water Meter Fee:
Total #: 1 Irrigation Meter(s) @ $882.00
$882.00
Total #: 0 Additional Irrigation Meter(s) @ $0.00
$0.00
Total #: 2 Fireline Meter(s) @ n/a
meter provided by developer
(100% due prior to issuance of water meters)
Domestic Water Meter Deposit Fee:
Total #: 1 Meter(s) @ $30.00 ea.
$30.00
(100% due prior to issuance of water meters)
Irrigation/Fire Meter Deposit Fee:
Total #: 3 Meter(s) @ $30.00 ea.
$90.00
(100% due prior to issuance of water meters)
Wastewater Impact Fee:
Total Domestic Meters ESU's: 5.33 @ $900.00 ea.
$4,797.00
(Due prior to issuance of building permit)
Wastewater Tap Inspection Fee:
Total #: 1 Connections @ $50.00 ea.
$50.00
(100% due prior to issuance of building permit)
Utility Final Inspection Fee (All developments):
Total #: 1 Lots @ $50.00 ea.
$50.00
(100% due prior to issuance of building permit)
Page 1
Park Fee (For Residential Developments Only):
x Preliminary plat approved: After October 26, 1993
Single-family @ $0.00 per lot
Multi -family @ $0.00 per unit
(100% paid prior to Council approval of final plat)
Roadway Impact Fee:
(See attached fee calculations)
Street Lighting Fees:
Assessed for lighting in the City's right-of-way.
This fee cannot be assessed until after Oncor submits
the lighting plan for the proposed development.
Once the plans are submitted, $352.44 per light will be assessed.
(100% due prior to final acceptance of development)
Street Sign Fees:
Assessed for signage in the City's right-of-way.
(See attached fee calculations if applicable)
Construction Inspection Fees:
A copy of the development contract must be submitted for assessment.
The contracts should indicate the cost to construct the improvements
that are inspected by the Engineering Department.
(2% of development cost required for private improvements)
(4% of development cost required for public improvements)
Page 2
$0.00
$0.00
$51,430.08
Information not Available
Information not Available
Information not Available