Loading...
DCT Fellowship- CS151118PROJECT: Lot] Blk 1 DCT Fellowship west DATE: 10/27/2015 Water Impact Fee: Domestic Meter(s): 1 - 2 inch = 5.33 ESU's Irrigation Meter(s): 1 - 2 inch = 5.33 ESU's 0 = 0 ESU's Fireline Meter(s): 2 - 8 inch = 2.5 ESU's Total #: 13.16 ESU's @ $900.00 ea. $11,844.00 (Due prior to issuance of building permit) Water Tap Inspection Fee: Total #: 4 Connections @ $50.00 ea. $200.00 (Single family due prior to issuance of building permit) (All other developments due prior to issuance of meter) Domestic Water Meter Fee: Total #: 1 Domestic Meter(s) @ $882.00 $882.00 (Single family due prior to issuance of building permit) (All other developments due prior to issuance of meter) (This fee may change at the time of pick up) Irrigation/Fireline Water Meter Fee: Total #: 1 Irrigation Meter(s) @ $882.00 $882.00 Total #: 0 Additional Irrigation Meter(s) @ $0.00 $0.00 Total #: 2 Fireline Meter(s) @ n/a meter provided by developer (100% due prior to issuance of water meters) Domestic Water Meter Deposit Fee: Total #: 1 Meter(s) @ $30.00 ea. $30.00 (100% due prior to issuance of water meters) Irrigation/Fire Meter Deposit Fee: Total #: 3 Meter(s) @ $30.00 ea. $90.00 (100% due prior to issuance of water meters) Wastewater Impact Fee: Total Domestic Meters ESU's: 5.33 @ $900.00 ea. $4,797.00 (Due prior to issuance of building permit) Wastewater Tap Inspection Fee: Total #: 1 Connections @ $50.00 ea. $50.00 (100% due prior to issuance of building permit) Utility Final Inspection Fee (All developments): Total #: 1 Lots @ $50.00 ea. $50.00 (100% due prior to issuance of building permit) Page 1 Park Fee (For Residential Developments Only): x Preliminary plat approved: After October 26, 1993 Single-family @ $0.00 per lot Multi -family @ $0.00 per unit (100% paid prior to Council approval of final plat) Roadway Impact Fee: (See attached fee calculations) Street Lighting Fees: Assessed for lighting in the City's right-of-way. This fee cannot be assessed until after Oncor submits the lighting plan for the proposed development. Once the plans are submitted, $352.44 per light will be assessed. (100% due prior to final acceptance of development) Street Sign Fees: Assessed for signage in the City's right-of-way. (See attached fee calculations if applicable) Construction Inspection Fees: A copy of the development contract must be submitted for assessment. The contracts should indicate the cost to construct the improvements that are inspected by the Engineering Department. (2% of development cost required for private improvements) (4% of development cost required for public improvements) Page 2 $0.00 $0.00 $51,430.08 Information not Available Information not Available Information not Available