Loading...
WA8801-CS 890511LOCAT'ON COP.¢~C% T)LP.O.,ECT NO. cONT.AC'roR ///f.- / EX, V" ,~:::~..Z/'~':./4.t-. REPORT OF FIELD CHANGE SPECIAL REPORT NO. ~' PAGE _LOF_L_,'AGEs DATE E',---IJ_O~' CROSS REFERENCE TO DAILY REPORT NO. INSTRUCTIONS Whenever any corrective change is made in field construction which ;s at variance with me specifications and drawings as originally issued, a complete detailed report shall be filed, listing the following items. so that IOecifications or drawings storage data can be corrKted. 1. Identify the problem: Indicate why originally specified construction vv~s not used. 2. The Solution: Describe, in detail, the recommended change or change" that were made. as applicable. 3. Indicate whether this is e, isolated case or a general condition which could be improved by changing future specifications or drawings. 4. Submit Iketche. as nece"xar¥. REFERENCE DATA SPECIFICATION S CTION No. ff//~ PAGE N . i PARAGRAPH No. oRA,...,NG No,°.~.~../r'~''' E,,T,TLED ~4/k'''- ~D ',,,-Mo/,eG-~, ~/ r/~r~z, ~/.~ SKETCH NO, DATED ~//'~ ENTITLED ~Z~/~F/~" DESCRIPTION ,. bETA,LED ,D.:.T,P,CAT,O. OF T.E P.OBLE,,.,//pO/Y D/~/d4 ~P~//F 4 ~'~ pM ~.c~' .~p //~fl~s /~ / N(=~-T ~e~ P/,~V Z~da~o,~( ou 7 YNt~ IS THE PROBLEM AN ISOLATED CASE OR GENERAL./ /,5'0 &y tAttach extra sheets as necessarY) TITLE,