Loading...
2014_1008 C�IBCK ONE: � IRRIGATION ✓ DOMESTIC FIRELINE BACKFLOW PREVENTION ASSEN�LY TEST AND MAINTENANCE REPOR? NAME OF PWS: l�"1 �P�'�l �- � �U �p m�I� PWS I.D.# LOCATION OF SERVICE: ��� �CJJ �''I The bacl�Iow preveation assembly detailed below has been tested and maintained as required by TNRCC re�ons aad is certi5ed to be operating withia acccptable parameters. TYPE OF ASSEMBLY ❑ Reduced Pressure Principle ❑ Pressure Vacu�Breaktr t� Double Check Valve ❑ Atmosphere Vacuum Breaktr ��/ Maaufacttaer ��' C-+C� Size Modei Number o � � Located At �r'Dt'1�' �� � � � s«��rr��a � D� 3?� REDUCED PRESSURE PRINCIPLE ASSEMBLY PRESSURE VACUUM BREAI�R Doubte Check Valve Assembly lst Check ��Z 2nd Checl:�.� Relief Valve 4ir Inlet Check V�lve Initial Test DC-Closed Closed Tight `�t Opeaed at Opened at �sid Ti�t 1$ Lcal:ed � osid _osid �a��7 RP-ipsid L,e a l;e d o D i d not O pea o L e a l:e d ❑ �P� and Materials Used Test After DGClosed Closed Tight o Opened at Opcaed at _nsid Repair Tie,,ht � _�sid osid RP sid The above is caertifiod to be true. Firm Name � E'�I �'�� Cerafi�Teste �a V t� � t l'�-1 \ Firm AddrGss ��� �� � '� Cert.Taster No. ����Date �� � �7 Ga� � Z�Sao llate last accuracy tested g �� White- Customer's Copy Yellow - City Copy Pink-Tester's Copy