Loading...
Enclaves-CS 961021WPC - PARKWAY DEVELL .'MENT CORPORATION 10-2~-96 AlO:14 IN October 21, 1996 Mr. Michael A. Martin, EIT Assistant City Engineer City of Coppell P O. Box 4'7,.'I Coppell, Texas 75019 Re: Failing Retaining Walls/Enclaves on the Parkway Your Letter of October 10, 1996 Dear Mr. Martin, Thank you for your letter dated October 10, 1996. Continuing in the spirit in which the Development and Maintenance Agreement was made, we intend to resolve the retaining wall failure as quickly as possible. However, there are a couple of questions which need to be answered and comments which need to be made: 1) It appears from my inspection that water has been allowed to get behind the wall in a couple of locations. I think this relates to maintenance of the slope more than to installation. 2) There is no clear date that I can find specifying the date of final acceptance by the city. It should logically follow that date on which Certificates of Occupancy were released t0r Huntington Homes which dates back to approximately February/March 1996. I would suggest March 1, 1996 as the date of final acceptance by the city. 3) We are currently arranging repair to take place by the original contractor, Giles Masonry. We will be asking him to post an eighteen month bond upon completion of the repairs in an amount equal to 50% of the', original contract amount and in accordance with the City of Coppell requirements for maintenance bonds for public !improvements. 9330 LBJ FREEWAY · SUITE 745 · LOCKBOX 68 · DALLAS, TEXAS 75243 TELEPHONE (972) 479-0697 · FACSIMILE (972) 479-0397 Mr. Michael A. Martin, EIT October 21, 1996 Page 2. I will be contacting you to coordinate a meeting on site with Giles Masonry. I would like either you or a representative of' the city to be presem at that meeting to make sure .~hat we do this one time and t~;~at it :,$ don~ correctly. Thanks for your patience and assistance. Kind Regards, David R. Blom President DRB/sc cc: Keith Jackson Espey, Huston & Associates