Loading...
WA8801-CS 890512CONSTRUC 0~ May 12, 1989 Mr. Gabe Favre Ginn, Inc. 17103 Preston Road, Suite 100 Dallas, Texas 75248 Re: City of Coppell 24" CrosstownWater Line Dear Mr. Favre: With regards to the utility lines in Moore Road being at different location then anticipated we submit to you a request for the following changes on Line 'D'. Delete: -75' 27" steel Casing Pipe @ 95.00/lf $7,125.00 ($7,125.00) '145' 6" DR-14 PVC Pipe @20.O0/lf -10 Conc. PCVP Remove & Replace @65.00/sy -30' Bore for 6" Pipe @800.00/LS -16" Gate Valve w/Box @325.00/ea -1 Mobilization for Bore Sub-Contractor original 27" Bore @6.00/LS -1 Labor to Bore Pilot-Hole on 27" Bore @400.00/LS '1 Labor for (4) Bore Pits & Remove Sprinkler System @800.O0/LS '1 Labor for backfilling, clean-up and landscaping @400.00/LS $2,900.00 650.00 800.00 325.00 600.00 400.00 800.00 400.00 6,875.00 ($ 250.00) This change would reduce'the contract price by $250.00 and basically entail going South down Moore Road for the tie-in, in lieu of crossing Moore Road to the East, thus avoiding a conflict with the existing storms drains, gas line and sewer line. Sinderely, McLean Construction, Inc. JW:sh Jim Watts P.O. Box tlYlSq · Killeen, Texas ~1~5q7- · 812/634-5204 l'm T I i