Loading...
2015_0310 (4) �!, C�IECK I�NE: I'i IRRIGATION �( _ llOMESTIC FIRELINE III BACKF'LOW PREVENTION ASSEMBLY TEST AND MAINTENANCE REPORT I�, NAME OF PWS: L��?`l �' � L�c,(-�p r 11 ��I PWS I.D.# I.J cJ � � I!� LOCATION OF SERVICE: ''��J W Z�f�Cs�?� a Tl�c backflc�w �revention asseinbly detaile�i below has been tested and maintained as required by TCEQ j regulacic�►1s and is eertified to b� aperating within acceptable parameTers. I, TYPE OF ASSEMBLY '� ❑ Reducrd Pressvre Principle ❑ Prossure Vacu�mm Breaker II � Double Chxk Valve o Atmosphere Vacuum Breaker �I Manufacturer LN'�T"c� S ize � �, Modei Number U�"7�► 1 Located At r"��.� STr=-�3' � M�'r�• �! Strial N�bcr r� c� �v j?HO I�� REDUCED PRESSURE PRINCTPLE ASSEMBLY PRESSURE VACUITM BREAKER I�!, Double Check Valve Assembly Ilst Checl: Znd ChecR Reiief Valve Air Inlet Checic Valve �', Inival Test DGClosed Closed 7i�ht ❑ 4pene�at Opened at nsid ' Ti�t ❑ Leakcd ❑ osid _nsid �! ���``i RP-s„psid I Lcal;od o Did not Opm 0 Leaked 0 II �� /I�Cd �CeT� TG 'IYY�e c'7�r � � i � ��efleti ; and I MaLeriaLs G't-,.� y��'i Tt�� c r ' � S "?►�� �, Usai I Test ARer DGClosed Closed Tight o ppeaed at Opeaod at osid ' Rtpair Tie,ht D nsid osid i, R.P sid �', The above is catifiod to be�ve. �'-� s I�I, Fum Name ,4.r�/c v� �•'� Ccrtified Ttster l--�fr�eT+�= W c��•2- I'�, FirmAddress t'� �c+X� 7�77 �1v��ne��-•- CatTestallo. 4"�t�b9Ll�� Date ��� I/S I��I, Gauge # C�3e��3� i� III, llate last accuracy tested 5�/5 II! White - Customer's Copy Yellow - City Copy Pink -Tester's Copy