Fairways-CS 930105NATHAN D. MAIER
CONSULTING ENGINEERS, INC.
Janua~ 5, 1993
Mr. Ken Griffin, P.E.
City of Coppell
255 Parkway Boulevard
Coppell, Texas 75019
RE: The Fairway~
NDM Job N~
Dear Ken,
Attached are two sets of reef
following comments are inte~
5.
6.
7.
8.
Paving mai
Oonzalas).
The ac..cef~
'at Pa'l,~has~
sed plans for the above referenced project along with the City's mark-ups. The
ded to address some of the concerns from the mark-ups:
tenance has been addressed in the owners agreement (See Rey
~sue will be addressed at the January 12 Coundl hearing.
Landscape md irrigation plans are now being revised and will be submitted when
complete.
The require d drainage easement required from the golf course has been executed.
We are wot king on a letter of permission from the Flood Control District.
Our internal drainage system is designed for a 100-year storm.
There is n~ offsite water coming onto the site.
We will prpvide standard details with our last review.
Please let me know if you h~ve any questions.
Mike Daniel
MD/crab
Attachments
Three NorthPark/8800 N Central Expwy./Suite 300/Dallas. Texas 7S231/(214) 73974741