Loading...
Fairways-CS 921106CITY OF COPPELL DEVELOPMENT FEES Date: Project: November 6, 1992 Fairways at Riverchase Park Fee (50% due prior to Council Approval) (50% due at Issurance of Building Permit) Water Impact Fee (100% due prior to Council Approval) Water Tap Inspection Fee (100% due at Issuance of Building'Permit) Wastewater Impact Fee (100% due prior to Council Approval) Sewer Tap Inspection Fee (100% due at Issuance of Building Permit) Utility Final Inspection Fee (100% due at Issuance of Building Permit) Street Sign Fee (100% due prior to Council Approval) Street Light Fee (100 % due prior to Council Approval) TOTAL ASSESSMENT $ 14,700.00 'AMOUNT DUE PRIOR TO COUNCIL APPROVAL $ 7,350.00 $ 63,700.00* $ 63,700.00* $ 9,800.00 $ 44,100.00 $ 44,100.00 $ 9,800.00 $ 4,900.00 $ 1,407.12 $ 1,407.12 $ ** $ ** Construction Inspection Fee (2% of Project Cost: 100% due prior to Council approval) Total $14 $,407.12 TOTAL AMOUNT DUE PRIOR TO COUNCIL APPROVAL $116,557.12 $116,557.1234 +2%inspecfionfee * The water impact fees do not include the fees for the irrigation meters. ** This fee cannot be assesed until after TU Electric submits the lighting plan for the proposed project. Once the plan is submitted, $292.60 per light will be assessed. 'Tl~ddO0 .gO All~ £'ttH]ldO :~z[~ ' ' " ff.,,- . . . ,:, ~ .- .~ '; ~. ': r,. '.' i5:,' ,' · 2~" ,;}'%' November 6, 1992 P.O. Box 478 Coppell, Texas 75019 214-462-O022 Mr. Mike Daniel, P.E. Nathan D. Maier Consulting Engineers Three Northpark/8800 N. Central Expressway, Ste. 300 Dallas, TX 75231 Re: Fairways at Riverchase Development Fee Assessment Dear Mr. Daniel: Enclosed is a copy of the City of Coppell Development Fee Assessment list, along with a copy of the development fee calculations for the Fairways at Riverchase. Please provide a check made payable to the City of Coppell in the amount of $116,557.12 plus 2% of the construction cost and forward it to Mr. Alan Iohnson, Assistant Finance Director, Finance Department, along with a copy of the fee assessment list. This should be provided prior to City Council approval of the final plat. Also, please provide our office a copy of the Engineer's Estimate or contract for this project so the construction inspection fee can be verified. Please provide a copy of your paid receipt to our offices. Copies of your receipts will help us verify payment of the required fees and assure a successful beginning of this project. We look forward to working with you on this project. If you have any questions, please do not hesitate to contact me. Sincerely, Kenneth M. Griffin, P.E. City Engineer cc: Steve Goram, Director of Public Works Alan Johnson, Assistant Finance Director Greg Jones, Acting Building Official fairways Date: Project: CITY OF COPPELL DEVELOPMENT FEES November 6, 1992 Fairways at Riverchase Park Fee (50% due prior to Council Approval) (50% due at Issurance of Building Permit) TOTAL $ 14,700.00 Water Impact Fee (100% due prior to Council Approval) $ 63,700.00* Water Tap Inspection Fee (100% due at Issuance of Building Permit) S 9,800.00 Wastewater Impact Fee (100% due prior to Council Approval) $ 44,100.00 Sewer Tap Inspection Fee (100% due at Issuance of Building Permit) $ 9,800.00 Utility Final Inspection Fee (100% due at Issuance of Building Permit) $ 4,900.00 Street Si~n Fee (100% due prior to Council Approval) $ 1,407.12 Street Light Fee (100 % due prior to Council Approval) $ ** Construction Inspection Fee (2% of Project Co~t:100% due prior to Council approval) Total $148,407.12 TOTAL AMOUNT DUE PRIOR TO COUNCIL APPROVAL AMOUNT DUE PRIOR TO COUNCIL APPROVAL $ 7,350.00 $ 63,700.00* $ 44,100.00 $ -0- $ 1,407.12 $ ** $116,557.12 $116,557.1234 +2%inapecfonfee * The water impact fees do not include ~he fees for the irrigation me~ers. ** This fee cannot be assesed until after TU Electric submits the lighting plan for the proposed project. Once tho plan is submitted, $292.60 per light will be assessed. COPPg~.~. Poz~L~C WORKS DATE: RE: The following project. November 2, 1992 Ken Griffin, City Engineer Public Works Staff Development Fees for The Fairways at Riverchase fees should be assessed on the above referenced Water Imp~act Fee: 9~ - 5/~"x~/4 ~ * -- Domestic Meter/s Irrigation Meter/s Fireline Meter/s = 98 ESU's = ESU'B = ESU'S Total 98 ESU'S ~ $650.00 ea ~ $63,700.00 100% due prior to Council approval of final plat. * This assessment does not include irrigation meter ~mpact due to that information not being available at this time. Wastewater I~act Fee= 98 - 5/8"x3/4" Domestic Meter/s = 98 ESU's ~ 450.00 = $44,100.00 100% due prior to Council approval of final plat. Water Tap Inspection Peo 98 Connections ~ $100.00 each = $9,800.00 100% due prior to issuance of building permit. Sewer Tap Inspection Fee 98 Connections ~ $100.00 each = $9,800.00 100% due prior to issuance of building permit. Utility Final Inspection Fee ~8 Residential Homes ~ $50.00 each = $4,900.00 100% due prior to issuance of building permit. Street Lighting Fee Shall be assessed and paid prior to final acceptance of project. Note= This fee cannot be assessed until after TU Electric submits the lighting plan for the proposed project. Once plan is submitted $292.60 per light will be assessed. Street Signs Fee See attached Street sign assessment sheet. 100% due prior to final acceptance of project. Park Fee 98 Residential Lots at $150.00 each - $I4,700 Units (Multi f~mily) at $75.00 each = 50% of the amount specified above shall be paid bythe Developer/ prior to Council approval of final plat. 50% remaining shall be paid by the Builder at such time as a building pe~it is issued. Please advise the Developer of these fees and due dates. If you have any questions regarding these assessments please advise. ~LP I dm cc= Steven G. Goram, Director of Public Works STREET SIGN ASSESSMENT for The Fairways ~ Riverch~e The following assessment is being made in accordance with the City of Coppell Subdivision Ordinance Appendix A chapter VIII A. The following cost of those sign materials required are based on current pricing which is reviewed on a regular basis. SIGN UNIT PRICE QUANTITY EXTENDED PRICE No Parking $ 53.10 Speed Limit $ 63.54 13 S 826.02 Yield $ 58.56 Stop $ 65.12 Street Name $ 11.60 Stop & Street Combo $ 96.85 6 $ 585.10 OTHER TOTAL Sl.407,12 * Cost breakdowns may be obtained from Public Works by written request. fairwy.