Loading...
2014-0612 (2) ChIECK ONE: IRRIGATION DOMESTIC FIRELINE BACKFLOW PREVENTION ASSEMBLY TEST AND MAINTENANCE REPORT NANIE OF PWS: . PWS I.D. # � �n � LOCATION OF SERVICE: �OO• N • � v� e� The backflow prevention assembly detailed below has been tested and maintained as required by T�EQ regulations and is certif7ed to be operating within acceptable parameters. ' TYPE OF ASSEMBLY o/ Reducrd Pressure Principle ❑ Pressur�Vacu�Breaker d Double Check Valve ��P� ❑ Amoosphere Vacuum Breal:er Maaufact�er A. Size �� Model Number �� Located At N,h, t�'�'�'�v�CJc � c�� Scrial Nimmbcr � r� ' `��`f REDUCED PRESSURE PRINCTPLE ASSEMBLY PRESSURE VACUUM BREAI�R Double Check V alve Assembly lst Checl: 2nd Checl: elief�alve Air Inlet Check Valve Ininal Test DGClosed Closed Ti�t Opeaed at Opened at �sid Ti�t Leal:ed � psid nsid �b� R.P- +� psid ) � L,cai;ed ❑ i Y Did noc Open � Leal.ed 0 �P� and Materials Used Tcst Aftu DC-Closed Closed Tight o Opcncd at Opcnod at nsid Rtpair Tight o osid osid RP sid The above is carifi�d to be tnu. f Fum Name � �5� Catifi�d Testa �� Fum Address�! �� ' � Cert. Tcstc No. b����1� Date �-. 1►a� ��c�y�. (�auge # 0�Qt710� llate last accuracy tested (,( White - Customer's Copy Yellow - City Copy Pink - Tester's Copy