Loading...
Enclaves-CS 950206 Cook-Jackson, Inc. A TECHNICAL SERVICES COMPANY February 6, 1995 Mr. Mike Martin Engineering City of Coppell 255 Parkway Blvd. P.O. Box 478 Coppell, Texas 75019 Subject: The Enclaves On the Parkway -- Early Excavation Release Dear Mike, I spoke with Ken Griffin January 27, 1995, regarding the possibility of importing dirt onto the above referenced site prior to the final approval of our engineering plans and final plat. Ken indicated that this would not be a problem but that we had to actually place the material and not stockpile it and that we would need to submit our erosion control plan. Our intent is to actually place the material as required by our grading plan prepared by Dowdy, Anderson & Associates, Inc. Attached is a copy of the erosion control plan, also prepared by Dowdy Anderson. Our contractor, Site Concrete, would like to start prep work on the site late this week and begin importing fill material next week. Please let me know if this will be a problem. Thank you for your assistance and cooperation. Sincerelw, . ~. enclosures cc: Mr. David Blom P.O. BOX 2728 · DALLAS, TEXAS 75221-2728 · (214) 565-1105