Loading...
Copperstone-LR 960531"Excettence by Experience,, PO Box 92548 * Southtake, Te~.~_s ?%092 , (817) 3~9-0281 CONCRETE CYLINDER TEST RESULTS PROJECT: Copperstone LOCATION: Coppell JOB #: 95-1522 DATE OF BREAK: 05-31-96 DAY: Friday CLIENT: Copperstone Ltd CONTRACTOR: Clack Construction c/o Briscoe Clark Comp CYL. SLUMP DATE OF DAYS I.D. LOCATION (IN.) SAMPLE AGED POUNDS PSI Approach Slab: 57A @ east end* 57B @ east end* 05-24-96 7 85,500 3024 05-24-96 7 84,500 297]. * made by contractor SPECIFICATIONS: SUPPLIER: 3000 psi @ 28 days Chris Quentin Technician