Loading...
2015-0908 CFIECK UNE: IRRIGATI�N DOMESTIC FIRELINE � BACKFLOW PREVENTION ASSEMBLY TEST AND MAIIVTENANCE REPORT NAMEOFPWS: �1�7� C� � Lc,(}P�1� PWS I.D. TM LOCATION OF SER.VICE; Q� �r.e¢r�or-l- Pk y Thc backllo��� preventioi� ass�:mbly detailed belo�� ha�heen tcsted and maintained as required by TCEQ t-c��ulations and is certiticd to be operating �<<ithin acceptabl�parameters. TYPE OF ASSEMBLY ❑ Rcduc�Pressure Principle ^ Pressure Vacu�Breakcr ,� Double Chccl:Valve � Atmosph�rc Vacuum Breaker Manufacn.u�e: �-{�CI�5�1.f Size 8�� Model N�bcr ,�,QA Locatcd At IUW �Y-e�U'/�' scrial N�ba q�OCo 0.33 REDUCED PRESSURE PRINCIPLE ASSE:I�LY I PRESSURE VACiJCJM BREAKER Double Checic Valve Assembly lst Checi: Znd Chect: Relie{Valv� Air Inlet Check Vaive Inival Tat DGClosad Clos«i Ti�ht � Opcned at Opencd at nsid Ti�t 2•�'j �, Lcal:cd � nsid �sid RP-�,j7sid 3�G Leai;ed c Did noc Open o L,eal:ed 0 �� and Mataials Used Tcst ARer DC-Closed Closed Tight o ppened at Opeaed at nsid Repair Tight o nsid nsid R.P sid The above is certi6e�to be t�ve. Firm Name �(''�101�1 ��r.2 1'�DS Cutified Testa IX.tSa�n i-tLSTcn Ferm Addrass ��� 7�� Cert.Testa No.�Oc�l bC��l Dnte � c S U�aXa h a C��2 �X (�auge # O Cv(�C�C7l7� llate last accuracy tested ,j White - Customer's Copy Yellow - City Copy Pink-Tester's Copy