Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Copperstone-LR 960530
'TBCHI~QUB~ "Excell. ence by Experience" PO Box 92548 Enviro~nta[ Assess~flts Soils & Fo~ations Construction Materials Testing C~rcia[ & [~ustria[ lns~ction Southtake0 Texas 76092 * (817) 329-0281 CEMENT 8UBGRADE GRADATION REPORT PROJECT: Copperstone JOB #: 95-1522 DATE: 05-30-96 CLIENT: Copperstone Ltd. c/o Briscoe Clark Company LOCATION: Coppell DAY: Thursday TIME: 4:00pm CONTRACTOR: Glenn Thurman, Inc LOCATION % PASSING 1" SIEVE % PASSING 1/2" SIEVE PASSING #4 SIEVE Eastside Bridge Approach: 1. east lanes 2. west lanes 100.0% 100.0% 75.3% 76.4% 47.2% 48.1% SPECIFICATIONS: 100.0% Passing 1" Sieve 70.0% Passing 1/2" Sieve 45.0% Passing #4 Sieve REMARKS: Minimum of 4 tests per trip. Chris Quentin Technician