Loading...
ST0502B-LR150914GRLLIFlIICE G GEOTECtifIICRL GROUP Consulting Engineering * Geotechnical Engineering * Construction Materials 3228 Halifax Street, Suite A, Dallas, Texas 75247 Phone: (972) 444-8889 Fax: (972) 444-8893 Acct ID: 1770 File No: C15-0812 Report Date: 09/14/2015 Project: Freeport Parkway North Location: Retaining Wall/Footing _Client: REPORT City of Coppell Date Sampled: 09/11/2015 Sampled By: Roger Torres By Order Of: Walter Order Number: 1770 Reinforcing Steel Inspection LAB NO: 193153 TEST RESULTS Report No: 193153 Page 1 of 1 We visually inspected the reinforcing steel for the items below. Our inspection included verifying the proper size of the reinforcing steel including diameter, length, bends and anchorage, and the grade and the location of the bars including spacing and cover. We also verified proper splicing, checked stability of tying, and checked the reinforcing steel for excessive rust deposits. • Wall: Retaining Wall "A" • Footings: From sta 4+19.58 to sta 3+94.03 Drawing Date: Jan 2015 Addendum No: CPL12161 Date: Jan 23, 2015 Details Referenced: Sheets 31 and 37 Remarks: Rebar placement complies with drawings and project specifications. Orig: City of Coppell (Coppell, TX) Attn: Mr. Rick O'Dell (1 -cc copy) Respectfully Submitted, Alliance Geotechnical Group Perry C. Kakara, SET, CME Department Manager THIS REPORT APPLIES ONLY TO THE STANDARDS OR PROCEDURES INDICATED AND TO THE SAMPLE(S) TESTED AND/OR OBSERVED AND ARE NOT NECESSARILY INDICATIVE OF THE QUALITIES OF APPARENTLY IDENTICAL OR SIMILAR PRODUCTS OR PROCEDURES, NOR DO THEY REPRESENT AN ONGOING QUALITY ASSURANCE PROGRAM UNLESS SO NOTED THESE REPORTS ARE FOR THE EXCLUSIVE USE OF THE ADDRESSED CLIENT AND ARE NOT TO BE REPRODUCED WITHOUT WRITTEN PERMISSION.