ST0502B- LR151116nuiAncE
cEOTecrryicRL
-c,Rou
Consulting Engineering * Geotechnical Engineering * Construction Materials
3228 Halifax Street, Suite A, Dallas, Texas 75247
Phone: (972) 444-8889 Fax: (972) 444-8893
Acct ID: 1770 File No: C15-0812
Report Date: 11/16/2015
Project: Freeport Parkway North
Location: Box Culvert
Client: City of Coppell _
REPORT: Reinforcing Steel Inspection
Date Sampled: 11/12/2015
Sampled By: Joseph Douglas
By Order Of: Walter
Order Number: 1770
LAB NO: 197476-1
TEST RESULTS Report No: 197476-1
Page 7 of 1
We visually inspected the reinforcing steel on box culverts. Our inspection included verifying the proper size of the
reinforcing steel including diameter, length, bends and anchorage, and the grade and the location of the bars including
spacing and cover. We also verified proper splicing, checked stability of tying, and checked the reinforcing steel for
excessive rust deposits.
Other: Multiple box culvert top crossing Freeport Parkway at paving station 16+50
• Drawing Date: 1/21/15
• Details Referenced: Pages 61-63 of 128 TxDOT Details
Double mat
Bottom mat #5's @ 5" O.C. and #4's @ 8" O.C.
Top mat #5's @ 5" O.C. and #4's @ 18" O.C.
Orig: City of Coppell (Coppell, TX) Attn: Mr. Rick O'Dell (1 -cc copy)
Respectfully Submitted,
Alliance Geotechnical Group
�rX�`
Perry C. Kakara, SET, CME Department Manager
THIS REPORT APPLIES ONLY TO THE STANDARDS OR PROCEDURES INDICATED AND TO THE SAMPLE(S) TESTED AND/OR OBSERVED AND ARE NOT NECESSARILY INDICATIVE OF
THE QUALITIES OF APPARENTLY IDENTICAL OR SIMILAR PRODUCTS OR PROCEDURES, NOR DO THEY REPRESENT AN ONGOING QUALITY ASSURANCE PROGRAM UNLESS SO
NOTED. THESE REPORTS ARE FOR THE EXCLUSIVE USE OF THE ADDRESSED CLIENT AND ARE NOT TO BE REPRODUCED WITHOUT WRITTEN PERMISSION.