Loading...
St0502B- LR151125ALLiAnce �GG GEOTKHf11G9L GROUP Consulting Engineering * Geotechnical Engineering * Construction Materials 3228 Halifax Street, Suite A, Dallas, Texas 75247 Phone: (972) 444-8889 Fax: (972) 444-8893 Acct ID: 1770 File No: C15-0812 Report Date: 11/25/2015 Project: Freeport Parkway North Location: Head wall Client: City of Coppell REPORT: Daily Field Activity Date Sampled: 11/24/2015 Sampled By: Nance, Charles By Order Of: Walter Order Number: 1770 LAB NO: 198223 TEST RESULTS Report No: 198223 Page 1 of 1 We visually inspected the reinforcing steel for the items below. Our inspection included verifying the proper size of the reinforcing steel including diameter, length, bends and anchorage, and the grade and the location of the bars including spacing and cover. We also verified proper splicing, checked stability of tying, and checked the reinforcing steel for excessive rust deposits. • Wall: Sta 13+14 to Sta 14+20 Drawing Date: 5-14-15 Details Referenced: #5 bar on 6" centers #6 bar on 6" centers Orig: City of Coppell (Coppell, TX) Attn: Mr. Rick O'Dell (1 -cc copy) Respectfully Submitted, Alliance Geotechnical Group Perry C. Kakara, SET, CME Department Manager THIS REPORT APPLIES ONLY TO THE STANDARDS OR PROCEDURES INDICATED AND TO THE SAMPLE(S) TESTED AND/OR OBSERVED AND ARE NOT NECESSARILY INDICATIVE OF THE QUALITIES OF APPARENTLY IDENTICAL OR SIMILAR PRODUCTS OR PROCEDURES, NOR DO THEY REPRESENT AN ONGOING QUALITY ASSURANCE PROGRAM UNLESS SO NOTED. THESE REPORTS ARE FOR THE EXCLUSIVE USE OF THE ADDRESSED CLIENT AND ARE NOT TO BE REPRODUCED WITHOUT WRITTEN PERMISSION.