ST0502B- LR151201MLLWINCE
GEOTE-�CfiiM"L
GROUP
Consulting Engineering * Geotechnical Engineering * Construction Materials
3228 Halifax Street, Suite A, Dallas, Texas 75247
Phone: (972) 444-8889 Fax: (972) 444-8893
Acct ID: 1770 File No: C15-0812
Report Date: 12/01/2015
Project: Freeport Parkway North
Location: Rebar Inspection -Concrete -Retaining Wall
Client: City of Coppell
REPORT. Daily Field Activity
Date Sampled: 11/20/2015
Sampled By: Eric Branch
By Order Of: Walter
Order Number: 1770
LAB NO: 197797
TEST RESULTS Report No: 197797
Page 7 of 1
As requested, a representative of Alliance Geotechnical Group, went to the project site to perform a reinforcing steel
inspection and sample freshly mixed concrete.
Upon arrival, technician was informed that observations requested were canceled and rescheduled for a later date.
Orig: City of Coppell (Coppell, TX) Attn: Mr. Rick O'Dell (1 -cc copy)
Respectfully Submitted,
Alliance Geotechnical Group
Perry C. Kakara, SET, CME Department Manager
THIS REPORT APPLIES ONLY TO THE STANDARDS OR PROCEDURES INDICATED AND TO THE SAMPLE(S) TESTED AND/OR OBSERVED AND ARE NOT NECESSARILY INDICATIVE OF
THE QUALITIES OF APPARENTLY IDENTICAL OR SIMILAR PRODUCTS OR PROCEDURES, NOR DO THEY REPRESENT AN ONGOING QUALITY ASSURANCE PROGRAM UNLESS SO
NOTED. THESE REPORTS ARE FOR THE EXCLUSIVE USE OF THE ADDRESSED CLIENT AND ARE NOT TO BE REPRODUCED WITHOUT WRITTEN PERMISSION.