ST0301 C- LR151113-INICAL ENGINEERING VIRONMENTAL CONSULTING * CONSTRUCTION MATERIALS TESTING GEE Consultants, Inc. 10046 Monroe Drive 0 Dallas, Texas 75229 • (214) 352-5433 Fax (214) 352-6972 Report Date: Client: Project: Contractor: Concrete Supplier and Plant: Location of Placement: November 13, 2015 Date Concrete Placed: City of Coppell Bethel & Coppell Road Iowa Bridge & Culvert Le. LMC 956 E. Side Box Culvert, Bottom Slab October 16, 2015 Standard 6"x12" Cylinders Cylinder Cross-sectional Area: 28.27 Square Inches Concrete Report No.: 30 Project No.: 215-140 MATERIALS Source / SSD Batch Wts. OBSERVATION DATA Description (Lbs/CuYd) Mix Number: 1701 Time Sample Batched: 3:09 PM Cement: Time Sampled: 3:45 PM Remarks Sample Location: Middle Section of Slab Fly Ash: Truck / Ticket No: 1417/63096194 Coarse Aggregate: Temperature: BCR 137 Intermediate Aggregate: Ambient Range: 80 OF 144,620 Concrete Range: 85 OF Fine Aggregate: Slump Range (inches): 4.0 Admixtures: Weather Conditions: Clear I 'rime Started: 8:45 AM 28 Time Completed: 4:30 PM 2 Sample Air Content 3.5 Added Water: 0 Gallons Total Cubic Yards Placed: 47.5 I Reouired Strenath (Lbs./sci.in.): 3,600 Specimen Number Measured Slump (in.) Age (Days) Date Tested Total Load (Lbs.) Compressive Strength (Lbs./Sq.1n.) Remarks BCR 136 3 10/19/15 142,940 5,060 BCR 137 7 10/23/15 144,620 5,120 BCR 138 4.0 28 11/13/15 169,780 6,010 BCR 139 28 11/13/15 177,600 6,280 BCR 140 1 H J H I I I Test Methods Utilized I Fracture Regular Cylinders Made By: BT ASTM C-31, C-39, C-143 I (Unless Noted Otherwise) Remarks and/or Distribution: cc: Mr. Rick Odell - City of Coppell via E-mail: Rodellacoppelltx-gov Mr. Michelle Matunas - City of Coppell via Email: mmatunasOlcoppelltx-go Mr. George Marshall - City of Coppell via Email: gmarshallAcoppeI�Itxov Mr. Robert Caudill - Tiseo Paving via Email: rcaudill@.tiseot)aving Inc TBPE 12 All letters and reports are for the exclusive use of the client to whom they are addressed and shall not be reproduced without the full approval of GEE Consultants, Inc. The use of our name must receive our prior written approval. Out letters and reports apply only to the sample tested and/or observed and are not necessarily indicative of the quantities of apparently identical or similar products. G1 • GEOTECHNICAL ENGINEERING E • ENVIRONMENTAL CONSULTING GEE Consultants, Inc. E • CONSTRUCTION MATERIALS TESTING 10046 Monroe Drive + Dallas, Texas 75229 • (214) 352-5433 • Fax (214) 352-6972 Report Date: November 13, 2015 Date Concrete Placed: Client: City of Coppell Project: Bethel & Coppell Road (Revised) Contractor: Iowa Bridge & Culvert Lc. Concrete Supplier and Plant: LMC 956 Location of Placement: E. Side Box Culvert Walls October 20, 2015 Standard 6"x12" Cylinders Cylinder Cross-sectional Area: 28.27 Square Inches Concrete Report No.: 31 Project No.: 215-140 MATERIALS Source / SSD Batch Wts. OBSERVATION DATA Description (Lbs/CuYd) Mix Number: 1701 Time Sample Batched: 2:54 PM Cement: Time Sampled: 3:30 PM Remarks Sample Location: Southern Most Wall Fly Ash: Truck / Ticket No: 7060/63096263 Coarse Aggregate: Temperature: BCR 142 Intermediate Aggregate: Ambient Range: 75 OF 162,080 Concrete Range: 90 OF Fine Aggregate: Slump Range (inches): 3.0 Admixtures: Weather Conditions: Clear I Time Started: 11:30 AM 28 Time Completed: 4:45 PM 2 Sample Air Content (%): N/A Added Water: 0 Gallons Total Cubic Yards Placed: 19.0 Require Strength Lbs./s .in.: 3,600 Specimen Number Measured Slump (in.) Age (Days) Date Tested Total Load (Lbs.) Compressive Strength (Lbs./Sq.In.) Remarks BCR 141 3 10/23/15 147,760 5,230 BCR 142 7 10/27/15 162,080 5,730 BCR 143 3.0 28 11/17/15 BCR 144 28 11/17/15 BCR 145 H H Test Methods Utilized Fracture Regular Cylinders Made By: BT ASTM C-31, C-39, C-143 (Unless Noted Otherwise) Remarks and/or Distribution: cc: Mr. Rick Odell - City of Coppell via E-mail: Rodell a,coyyelltx.gov Mr. Michelle Matunas - City of Coppell via Email: mmatunas(&,,coplpelltx.eov Mr. George Marshall - City of Coppell via Email: gmarshall(ckoppelltx.gov Mr. Robert Caudill - Tiseo Paving via Email: rcaudilK( tiseonavina.com GEE Consuftants2 Inc. TI3PE Firm: F-3212 Reviewed by: All letters and reports are for the exclusive use of the client to whom they are addressed and shall not be reproduced without the full approval of GEE Consultants, Inc. The use of our name must receive our prior written approval. Our letters and reports apply only to the sample tested and/or observed and are not necessarily indicative of the quantities of apparently identical or similar products. iNICAL ENGINEERING VIRONMENTAL CONSULTING • CONSTRUCTION MATERIALS TESTING GEE ConsulA. tants, Inc. 10046 Monroe Drive • Dallas, Texas 75229 • (214) 352-5433 • Fax (214) 352-6972 Report mate: November 13, 2015 Date Concrete Placed: October 21, 2015 Standard 6"x12" Cylinders Client: City of Coppell Cylinder Cross-sectional Area: 28.27 Square Inches Project: Bethel & Coppell Road (Revised) Concrete Report No.: 32 Contractor: Iowa Bridge & Culvert Lc. Project No.: 215-140 Concrete Supplier and Plant: LMC 956 Location of Placement: Coppell Rd. E. Side Box Culvert Walls MATERIALS Source / SSD Batch Wts. OBSERVATION DATA Description (Lbs/CuYd) Mix Number: 1701 Cement: Fly Ash: Coarse Aggregate: Intermediate Aggregate: Fine Aggregate: Admixtures: 1 2 Added Water: 0 Gallons Time Sample Batched: Time Sampled: Sample Location: Truck / Ticket No: Temperature: Ambient Range: Concrete Range: Slump Range (inches): Weather Conditions: Time Started: Time Completed: Sample Air Content (%): Total Cubic Yards Placed: RPrmired Strength (Lbs./sa.in. 2:45 PM 3:15 PM 2 nd Wall From N. End of Culvert 3035/63096313 72 OF 91 OF 4.5 Clear 1:00 PM 4:30 PM N/A 6.5 3,600 Specimen Number Measured Slump (in.) Age (Days) Date Tested Total Load (Lbs.) Compressive Strength (Lbs./Sq.In.) Remarks BCR 146qC-143 10/26/15 136,340 4,820 BCR 147 10/28/15 144,860 5,120 BCR 148 11/18/15 BCR 149 11/18/15 BCR 150 H Regular Noted Otherwise) Cylinders Made By: BT Test Methodsure ASTM C-31,ss Remarks and/or Distribution: cc: Mr. Rick Odell - City of Coppell via E-mail: Rodell(a7coppelltx.aov Mr. Michelle Matunas - City of Coppell via Email: turn ias(a)coppelltx. ov Mr. George Marshall - City of Coppell via Email: gmarshall@copUe11-11 ~ov Mr. Robert Caudill - Tiseo Paving via Email: rcaudill@tiseopavin�.com GEE Consultants, Inc. TBPE Firm: F-3212 Kevieweo uv; r All letters and reports are for the exclusive use of the client to whom they are addressed and shall not be reproduced without the full approval of GEE Consultants, Inc. The use of our name must receive our prior written approval. our letters and reports apply only to the sample tested and/or observed and are not necessarily indicative of the quantities of apparently identical or similar products. G1 • GEOTECHNICAL ENGINEERING E I* ENVIRONMENTAL CONSULTING G I • CONSTRUCTION MATERIALS TESTING GEE Consultants, Inc. 10046 Monroe Drive + Dallas, Texas 75229 0 (214) 352-5433 • Fax (214) 352-6972 Report Date: November 13, 2015 Date Concrete Placed: October 27, 2015 Standard 6"x12" Cylinders Client: City of Coppell Cylinder Cross-sectional Area: 28.27 Square Inches Project: Bethel & Coppell Road (Revised) Concrete Report No.: 33 Contractor: Iowa Bridge & Culvert Le. Project No.: 215-140 Concrete Supplier and Plant: LMC 956 Location of Placement: Coppell Rd. E. Side Box Culvert Walls MATERIALS Source / SSD Batch Wts. OBSERVATION DATA Description (Lbs/CuYd) Mix Number: 1701 Time Sample Batched: 2:16 PM Cement: Time Sampled: 3:26 PM Remarks Sample Location: Middle Wall FI Ash: Y Truck / Ticket No: 3011/63096368 Coarse Aggregate: Temperature: BCR 152 Intermediate Aggregate: Ambient Range: 79 OF 118,960 Concrete Range: 85 OF Fine Aggregate: Slump Range (inches): 3.5 Admixtures: Weather Conditions: Clear 1 Time Started: 12:00 PM 28 Time Completed: 4:15 PM 2 Sample Air Content (%): NIA Added Water: 0 Gallons Total Cubic Yards Placed: 19.0 Require Strength Lbs./s .in.: 3,600 Specimen Number Measured Slump (in.) Age (Days) Date Tested Total Load (Lbs.) Compressive Strength (Lbs./Sq.1n.) Remarks BCR 151 3 10/30/15 113,340 4,010 BCR 152 7 11/3/15 118,960 4,210 BCR 153 3.5 28 11/24/15 BCR 154 28 11/24/15 BCR 155 H H Test Methods Utilized Fracture Regular Cylinders Made By. BT ASTM C-31, C-39, C-143 (Unless Noted Otherwise) Remarks and/or Distribution: cc: Mr. Rick Odell - City of Coppell via E-mail: Rodell(cr-%coPPelltx.gov Mr, Michelle Matunas - City of Coppell via Email: mmatunas�a,coyyelltx.gov Mr. George Marshall - City of Coppell via Email: gmarshall(cr�conpelltx.gov Mr. Robert Caudill - Tiseo Paving via Email: rcaudillna tiseonaving.com Inc. 12 Reviewed All tetters and reports are for the exclusive use of the client to whom they are addressed and shall not be reproduced without the full approval of GEE Consultants, Inc. The use of our name must receive our prior written approval. Our letters and reports apply only to the sample tested and/or observed and are not necessarily indicative of the quantities of apparently identical or similar products. VIRONMENTAL CONSULTING • CONSTRUCTION MATERIALS TESTING GEE Consultants, Inc. 10046 Monroe Drive • Dallas, Texas 75229 • (214) 352-5433 • Fax (214) 352-6972 Report Date: Client: Project: Contractor: Concrete Supplier and Plant: Location of Placement: November 13, 2015 Date Concrete Placed: November 3, 2015 Standard 6"x12" Cylinders City of Coppell Cylinder Cross-sectional Area: 28.27 Square Inches Bethel & Coppell Road (Revised) Concrete Report No.: 34 Iowa Bridge & Culvert Lc. Project No.: 215-140 LMC 956 Coppell Rd. Box Culvert Top Slab at E. Side MATERIALS Source / SSD Batch Wts. OBSERVATION DATA Compressive Strength (Lbs./Sq.In.) Remarks Description (Lbs/CuYd) 3 Mix Number: 1701 Time Sample Batched: 10:00 AM Cement: 'Time Sampled: 10:53 AM 135,240 4,780 Sample Location: 10'N. from S. End of Slab Fly Ash: Y 28 Truck / Ticket No: 7003/63096474 Coarse Aggregate: Temperature: Intermediate Aggregate: 12/1/15 Ambient Range: 68 OF BCR 160 Concrete Range: 75 OF Fine Aggregate: Slump Range (inches): 3.25 Admixtures: Fracture Regular Weather Conditions: Cloudy 1 Time Started: 8:00 AM 'rime Completed: 1:30 PM 2 Sample Air Content (%): 3.75 Added Water: 10 Gallons Total Cubic Yards Placed: 19.0 Required Strength (Lbs./su.in.): 4,000 Specimen Number Measured Slump (in.) Age (Days) Date Tested Total Load (Lbs.) Compressive Strength (Lbs./Sq.In.) Remarks BCR 156 3 11/6/15 125,140 4,430 BCR 157 7 11/10/15 135,240 4,780 BCR 158 3.25 28 12/1/15 BCR 159 28 12/1/15 BCR 160 H H Test Methods Utilized Fracture Regular Cylinders Made By: RB ASTM C-31, C-39, C-143 (Unless Noted Otherwise) Remarks and/or Distribution: cc: Mr. Rick Odell - City of Coppell via E-mail: Rode11(a),coppelltx.Roy Mr. Michelle Matunas - City of Coppell via Email: mmatunas(a�,coppelltx.gov Mr. George Marshall - City of Coppell via Email: gm arshall(a)coppelltx.gov Mr. Robert Caudill - Tiseo Paving via Email: reaudill(attiseopaving.com All letters and reports are for the exclusive use of the client to whom they are addressed and shall not be reproduced without the full approval of GEE Consultants, mc. t ne use or our nano �n receive our prior written approval. our tetters and reports apply only to the sample tested and/or observed and are not necessarily indicative of the quantities of apparently identical or similar products. G1 * GEOTECHNICAL ENGINEERING E * ENVIRONMENTAL CONSULTING GEE E I* CONSTRUCTION MATERIALS TESTING Consultants, Inc. 10046 Monroe Drive • Dallas, Texas 75229 0 (214) 352-5433 0 Fax (214) 352-6972 REPORT OF CONCRETE MIX OBSERVATION Measured Slump (in.) Report Date: November 13, 2015 Date Concrete Placed: November 9, 2015 Standard 6"x12" Cylinders Client: City of Coppell Cylinder Cross-sectional Area: 28.27 Square Inches Project: Bethel & Coppell Road 11/12/15 Concrete Report No.: 35 Contractor: Iowa Bridge & Culvert Le. BCR 162 Project No.: 215-140 Concrete Supplier and Plant: LMC 952 Location of Placement: Rail Wall 4.75 28 MATERIALS Source / SSD Batch Wts. OBSERVATION DATA BCR 164 Description (Lbs/CuYd) 28 12/7/15 Mix Number: 1701 Time Sample Batched: 8:22 AM Cement: H Time Sampled: 9:25 AM Sample Location: Rail Wall at 10'N. of S. End Fly Ash: Test Methods Utilized Truck / Ticket No: 1417/62988894 Coarse Aggregate: (Unless Noted, Otherwise) Temperature: Intermediate Aggregate: Ambient Range: 57 OF Concrete Range: 73 OF Fine Aggregate: Slump Range (inches): 4.75 Admixtures: Weather Conditions: Cloudy Time Started: 7:15 AM Time Completed: 12:15 PM 2 Sample Air Content (1/o): 4.25 Added Water: 10 Gallons Total Cubic Yards Placed: 9.0 Required Strength (Lbs./sq.in.): 3,600 Specimen Number Measured Slump (in.) Age (Days) Date Tested Total Load (Lbs.) Compressive Strength (Lbs./Sq.1n.) Remarks BCR 161 3 11/12/15 126,280 4,470 BCR 162 7 11/16/15 BCR 163 4.75 28 12/7/15 BCR 164 28 12/7/15 BCR 165 H H Test Methods Utilized Fracture Regular Cylinders Made By: RB ASTM C-31, C-39, C-143 (Unless Noted, Otherwise) Remarks and/or Distribution: cc: Mr. Rick Odell - City of Coppell via E-mail: Rodell(a_),col)pelltx.gov Mr. Michelle Matunas - City of Coppell via Email: mmatunas(a )co2psi �txov Mr. George Marshall - City of Coppell via Email: gmar_shaIlQcovyeIltx. Mr. Robert Caudill - Tiseo Paving via Email: rcaudill(ittiseongyingsm GEE Consultants, Inc. TBPE Firm: F-3212 Reviewed b : - All letters and reports are for the exclusive use of the client to whom they are addressed and shall not be reproduced without the full approval of GEE Consultants, Inc. The use of our name must receive our prior written approval. Our letters and reports apply only to the sample tested and/or observed and are not necessarily indicative of the quantities of apparently identical or similar products.