Loading...
ST0301C- LR151118GEOTECHNICAL ENGINEERINC rl� ENVIRONMENTAL CONSULTI" [oil - CONSTRUCTION MATERIALS TESTINI GEE Consultants, Inc. 10046 Monroe Drive 10 Dallas, Texas 75229 0 (214) 352-5433 0 Fax (214) 352-6972 Report Date: November 18, 2015 Date Concrete Placed: October 20, 2015 Standard 6"x12" Cylinders Client: City of Coppell Cylinder Cross-sectional Area: 28,27 Square Inches Project: Bethel & Coppell Road (Revised) Concrete Report No,: 31 Contractor: Iowa Bridge & Culvert Lc. Project No.: 215-140 Concrete Supplier and Plant: LMC 956 Location of Placement: E. Side Box Culvert Walls MATERIALS Source / SSD Batch Wts. OBSERVATION DATA Description (Lbs/CuYd) Mix Number: 1701 Time Sample Batched: 2:54 PM Cement: Time Sampled: 3:30 PM Remarks Sample Location: Southern Most Wall Fly Ash: Truck / Ticket No: 7060/63096263 Coarse Aggregate: Temperature: BCR 142 Intermediate Aggregate: Ambient Range: 75 OF Fine Aggregate: Concrete Range: 90 OF BCR 143 Slump Range (inches): 10 Admixtures: Weather Conditions: Clear I Time Started: 11:30 AM 2 Time Completed: 4:45 PM 6,480+ Sample Air Content N/A Added Water: 0 Gallons Total Cubic Yards Placed: 19.0 Retruired Strength (Lhs_/qn_in_)- 3600 Specimen Number Measured Slump (in.) Age (Days) Date Tested Total Load (Lbs.) Compressive Strength (Lbs./Sq.ln.) Remarks BCR 141 3 10/23/15 147,760 5,230 BCR 142 7 10/27/15 162,080 5,730 BCR 143 3.0 28 11/17/15 181,320+ 6,410+ BCR 144 28 11/17/15 183,100+ 6,480+ BCR 145 fl FlI I Test Methods Utilized Fracture Regular Cylinders Made By: BT ASTM C-31, C-39, C-143 (Unless Noted Otherwise) Remarks and/or Distribution: cc: Mr. Rick Odell - City of Coppell via E-mail: Rodell((Tcoppelltx.gov Mr. Michelle Matunas - City of Coppell via Email; mmatunasnacol2pelltx.gov Mr. George Marshall - City of Coppell via Email: gmarshallnacoppelltx.pov Mr. Robert Caudill - Tiseo Paving via Email: rcaudilI(&,tiseonavin2.com, GEE Consultants. Inc. TBPE Firm: F-3212 All letters and reports are for the exclusive use of the client to whom they are addressed and shall not be reproduced without the full approval of GEE Consultants, Inc, The use of our name must receive our prior written approval. Our letters and reports apply only to the sample tested and/or observed and are not necessarily indicative of the quantities of apparently identical or similar products. iNICAL ENGINEERING GEE Consultan' Inc. k, Isf 10046 Monroe Drive Dallas, Texas 75229 0 (214) 352-5433 0 Fax (214) 352-6 , 972 Report Date: November 18, 2015 Date Concrete Placed: October 21, 2015 Standard 6"xI2" Cylinders Client: City of Coppell Cylinder Cross-sectional Area: 28,27 Square Inches Project: Bethel & Coppell Road (Revised) Concrete Report No.: 32 Contractor: Iowa Bridge & Culvert Lc. Project No.: 215-1,40 Concrete Supplier and Plant: LMC 956 Location of Placement: Coppell Rd. E. Side Box Culvert Walls MATERIALS Source / SSD Batch Wts. OBSERVATION DATA Description (Lbs/CuYd) Mix Number: 1701 Time Sample Batched: 2:45 PM Cement: Time Sampled; 3:15 PM BCR 146 Sample Location: 2 nd Wall From N. End of Culvert Fly Ash: Truck / Ticket No: 3035/63096313 Coarse Aggregate: Temperature: 7 10/28/15 Intermediate Aggregate: Ambient Range: 72 OF Fine Aggregate: Concrete Range: 91 OF 175020+ Slump Range (inches): L5 Admixtures: Weather Conditions: Clear I Time Started: 1:00 PM 2 Time Completed: 4:30 PM Sample Air Content N/A Added Water: 0 Gallons Total Cubic Yards Placed: 6.5 ASTM C-31, C-39, C-143 Required Strength (Lbs./sa.in.): 3,600 Specimen Number Measured Slump (in.) Age Date (Days) Tested Total Load (Lbs.) Compressive Strength (Lbs./Sq.1n.) Remarks BCR 146 5 10/26/15 136,340 4,820 BCR 147 7 10/28/15 144,860 5,120 BCR 148 4.5 28 11/18/15 175020+ 6,190+ BCR 149 28 11/18/15 157,840 5,580 BCR 150 fl H Test Methods Utilized Fracture Regular Cylinders Made By: BTI ASTM C-31, C-39, C-143 (Unless Noted Otherwise) Remarks and/or Distribution: cc: Mr. Rick Odell - City of Coppell via E-mail: Rodellnacoripelftx.gov Mr. Michelle Matumas - City of Coppell via Email: mmatunas(&,coppel'112i�.oy Mr, George Marshall - City of Coppell via Email: 2marshallacoop M1lN_.sZov Mr. Robert Caudill - Tiseo Paving via Email: reaudi I I (iWseovaving. corn GEE Consultants, Inc. 12 Reviewed All letters and reports are for the exclusive use of the client to whom they are addressed and shall not be reproduced without the full approval of GEE Consultants, Inc. The use of our name must lecewe our prior written approval. Our letters and reports apply only to the sample tested and/or observed and are not necessarily indicative of the quantities of apparently identical or similar products.