ST1501A- PT160106(L;Opy 0 Uw_' enIpLovoued pi erkui it must 030 on the ,fob site at all th"es.
CC: Applicant'__� Page 1 of 4
Public Works PE11-2 3 J�
Permit File Rev. 06/2012
l
Orig. to Project File
[Rd(U USE PERM H u AP " LUCATUDIM
Permit valid for 90 calendar days front date of approval
Submit permit application to the Engineering Dept., Town Center, 255 Parkway Blvd. or e-mail to engineer@coppelltx.gov (see button below)
Date of Submittal: 6 - �' Applicant's Job # / Work Order # G -516 `f
PERMIT FEE: $100.00
(No charge to Utility Coinpanies u4th approved Franchise/ROW Use Agreement)
Refer to the City of Coppell Ordinance No. 2001-944. Certificated Telecom Provider? Yes C'- No
❑ Plans provided and approved (Erosion Control/Safety fences must be installed prior to beginning work)
Project Name/Location or address F r eC k o r f P44 uw; Y bd ween "v""51" -7-d
:Contact# 11.69— 4 r}l '/ 9G t�
General Contractor A / p !h r %rs'�+y 1 � y � � l
E-mail address to return permit ok e- A l e d e r m (J g 1 P h i fe.s'h; g. C r'"J '
Representative:
Franchise ( Telephone #:
Company: 1
i E-mail address:
(for contact if needed/if e-mail of approvedpermitis desired/permit cannot be e-mailed unless complete)
Utility Company Represented:
C Oncor Electric Delivery C': Atmos Energy (7) Verizon C) SBC/ AT&T
C} Time Warner Cable C;-- CoSery Electric/Gas O Other
General Description of Work /in accordance i SOrrd. No. 2001-944): ,PLEASE ATTACH PLS OF PR�O- POSED WORK
PZ✓r� kl hk t�7'> PX 6 1+1 ObC /q h �� r� t p�fS per%r�t�
app f T
+e Cf ►2 P d✓Qli 11;e or r,Ax+N,•&i d- >1, o� .S' f�. (�qt.k��%/ •-uf j
Estimated Start Date I — i 2-- / b Estimated Completion Date* 1- I y — /.0
* Completion requires submittal of Completion Verification Notice (see page 4)
➢Was contact made with City and/or utility companies to locate existing utilities?
if NO, Reason: Yes C. No
➢Is removal of existing streets, alleys, or sidewalks necessary? WYes C') No
if YES, project must have City inspection prior to concrete replacement
Richt of Way Use Permit Anulication Paye 2 of 4
Representative(s) of the Contractor must adhere to all construction standards approved by the City of Coppell, ii,hich
includes but is not limited to: Erosion Control Ordinance, compaction requirements (density tests may be required at
applicant's expense) and barricading according to the Texas Manual on Uniform Traffic Control Devices.
Areas affected must be restored to as good condition as before the commencement of work (grading, drainage,
vegetation, and erosion control). To schedule Public Works final inspection (Page 4) call 972-462-5155.
➢Any excavation requiring closing of a street/alley must be reported prior to closing to the following:
Police Department @ 972-304-3600
Fire Department @ 972-304-3512
Street Department @ 972-462-5150
Engineering Department @ 972-304-3679
);-Attach barricade plan / trench safety plan if a lane or street closure is required.
NOTE: Street closures are allowed from 9.00 a m unti13:30 p.m. ONLYunless otherwise approved by City
Engineer.
➢Attach Work Order (franchise only) and/or 1 set'of prints showing proposed work.
Locates for existing franchise utilities must be done 48 hours prior to beginning work.
For City utility locates, call 972-462-5155 to schedule 48 hours prior to beginning work.
The application with signatures of Franchise and Contractor representatives must be submitted to Engineering
Dept. for approval prior to beginning work. Submittals by e-mail should go to engineer@coppelltx.gov.
Printing your name indicates your acceptance of the terms and conditions of this form:
(if you want the approved permit returned via e-mail, provide a valid e-mail address on Page 1.)
Signature of Utility Company Representative
('=Iv,4 .0_t 4J.-%_
Signature of Contractor Representative
Oa,,, d Sc hlcrlvr�
Al hN t�sf,ti
o Cit Representative
1.V11ll11Glll`
64-v 1 el
Date
Date
I IH 4
Date
➢NOTE: Notify _ CIO Inspector at 972-304-3679 prior to beginning work and prior to
backfill for concrete, trench, ditch and open pit inspections. Backfill inust meet
all construction standards approved by the City of Coppell.
Applicant shall indemnify and forever hold harmless against the City of Coppell each and every claim, denland
or cause of action that nzay be made or come against it by reason of or if any way arising out of the closure,
blocking, excavating, cutting, tunneling, or other work by the applicant under permit from the City, if such
permit is granted.
Page 3 of 4
COF
FE,--
-EY .
i
UTILITY RELOCATION CHECKLIST FOR WORK WITHIN
CITY OF COPPELL RIGHTS-OF-WAY OR EASEMENTS
Listed below are minimum requirements for utility relocation projects:
I.A copy of the valid approved City of Coppell permit is required on the project at all times.
2.Notify adjacent property owners (commercial & residential) of project timeline; provide them with contact
names and phone numbers.
3.Proper erosion control measures must be taken.
4.Follow Texas MUTCD standards for work in traffic zones.
5.Sod is to be replaced when necessary.
6.Irrigation repairs must be performed in a timely manner.
7.Follow OSHA recommended trench safety at all times.
8.Repair existing utilities that are damaged, including but not limited to clean -outs, water valves, and SS
manholes.
9.Densities may be required in trench lines (ASTM).
LO -.Care and repair of street signage is the responsibility of the contractor.
11.No work is to be done in collector roadways before 9:00 a.m. or after 3:00 p.m.
13.Prior notice of work activity on weekends and holidays must be in writing.
13.Line locates must be performed in advance by contacting -1 800 DIG TESS and/or the following:
CITY OF COPPELL UTILITIES DIVISION coppelltx Dov/utility-operations-division
972/462-5155
CITY OF COPPELL ENGINEERING DEPT.
972/ 304-3679
HOMEOWNER ASSOCIATIONS
972/ 304-3678 (Planning Department)
TIME WARNER CABLE
FEDERAL EMERGENCY MGMT. ADMIN.
214/ 320-5455 (Mike Rasmussen)
940/ 898-5138
AT&T LOCAL NETWORK
TEXAS COMM. on ENVIRONMENTAL QUALITY
214/ 215-3031 (Rich Millenman)
817/ 588-5800
COSERV Gas & Electric
DENTON CO. LEVEE DISTRICT
940/ 321-7800 x 7624 (Greg Ward)
214/ 352-5118 (Richard Hightower)
EXPLORER PIPELINE
Atmos Energy
918/ 493-5100 (Patrick Nwakoby)
972/360-4428 (Gary Dickinson)
ONCOR Electric Delivery
972/ 323-8917 (Larry Redick)
VERIZON COMMUNICATIONS
1 800 DIG TESS for litre locates
972/318-5277
(344-8377)
14. Contaminants must be removed from work area daily and disposed of properly outside the City.
15.Streets, sidewalks and alleys must be kept clean of construction material and debris.
16. "Clean-up" requires returning work area to pre -project condition or better.
17. Contractor is required to contact Public Works Division for Completion Verification Notice. (see pg. 4)
S` t£ _ A T y o A=
t• "-_"__ _ �. ^` _--:=mac'=' St
UTILITY RELOCATION IN RIGI3T-OF-WAY OR EASEMENT
COMPLETION VERIFICATION NOTICE
Page 4 of 4
Contact City of Coppell Public Works Division at 972-462-5155 to schedule an inspection
with Utility & Streets personnel to verify that your project has been completed to City of
Coppell specifications. Failure to schedule vefification inspection may delay future projects.
Franchise Utility Name
Project Location / Applicant's Work Order # Cf applicable)
Sub -contractor Company Name
24 hr.Contact Number
Date of Verification Appointment
Time of Verification Appointment
INFORMATION BELOW TO BE COMPLETED BY CITY OF COPPELL PUBLIC WORDS PERSONNEL
❖Inspected by
of Utilities Maintenance Division on.
and found to be acceptable / not acceptable because
Follow -tip needed? Oyes C', No
•3lizspected by
Follow-up scheduled for ,
of Streets Maintenance Division on
and found to be acceptable / not acceptable because
Follow-rcp needed? ()Yes
C, No Folloit,-tip scheduled for
A copy of this completed notice can be provided to the address below
or e-mailed by using the button below:
City of Coppell Engineering Dept.
255 Parkway Blvd., Coppell TX 75019
Office: 972-304-3679 Fax: 972-304-3570
Submit by E-mail Print Form
a kappamapgroup.com ® CONTINUED ON MAP 1
NZtl
N
YAR.
s
•97°02'00" •97'01'00•
tea,._. a'
M o "BROOKS �o
1
S k 7
RH g z 4
HEATF 4HuntenwndPark
i HEAHTHSME
BETHEL
5 u
z4
IrZSyS
j 141 q
a1
07o Seo
o
oa
COPPELL
14 µ a .ago
A
N
,!
3
O
BUB s U
1416:8
;�
e 15049
LVD
GAT EAY BLu
'
,.,.• _ _ _ ,_
\ti_ COTTON _ __ "ITZ
T L
1
AIBLI E
W
2S
o
WRAI IGLER
q
co!
c
M
'^
V
�a
1 STATESMAN
Q 09 -�a6
C a
y o
E TERSBLV_
2 49 a
R� Gp,V.
�zy
24
26�
114
Z
1�TH 28 �\ f
-71R ING9`�°"
S� Hj4 ROY
47q i
W
L4
44
CP
4 Q
a/�d�� ®� YYI a/B'h
---5
ntern ae ® nal�'�gtodkl �o
150
f
J
O
2,
45 a
EESE
44 90
op
o00n
—yam
rl
[In M ml\�
•97'02'001 9T'Ol'OD"
SCALE IN MILES U I CONTINUED ON MAP 21 SCALE IN PEEP
p 0 '/n /. '/o '/2 M Kappa Map Group, LLC 0 1000 2000 3000
�6�� BOOKPAGE1016
is
E
0
z
O
rz