Loading...
ST1501A- PT160106(L;Opy 0 Uw_' enIpLovoued pi erkui it must 030 on the ,fob site at all th"es. CC: Applicant'__� Page 1 of 4 Public Works PE11-2 3 J� Permit File Rev. 06/2012 l Orig. to Project File [Rd(U USE PERM H u AP " LUCATUDIM Permit valid for 90 calendar days front date of approval Submit permit application to the Engineering Dept., Town Center, 255 Parkway Blvd. or e-mail to engineer@coppelltx.gov (see button below) Date of Submittal: 6 - �' Applicant's Job # / Work Order # G -516 `f PERMIT FEE: $100.00 (No charge to Utility Coinpanies u4th approved Franchise/ROW Use Agreement) Refer to the City of Coppell Ordinance No. 2001-944. Certificated Telecom Provider? Yes C'- No ❑ Plans provided and approved (Erosion Control/Safety fences must be installed prior to beginning work) Project Name/Location or address F r eC k o r f P44 uw; Y bd ween "v""51" -7-d :Contact# 11.69— 4 r}l '/ 9G t� General Contractor A / p !h r %rs'�+y 1 � y � � l E-mail address to return permit ok e- A l e d e r m (J g 1 P h i fe.s'h; g. C r'"J ' Representative: Franchise ( Telephone #: Company: 1 i E-mail address: (for contact if needed/if e-mail of approvedpermitis desired/permit cannot be e-mailed unless complete) Utility Company Represented: C Oncor Electric Delivery C': Atmos Energy (7) Verizon C) SBC/ AT&T C} Time Warner Cable C;-- CoSery Electric/Gas O Other General Description of Work /in accordance i SOrrd. No. 2001-944): ,PLEASE ATTACH PLS OF PR�O- POSED WORK PZ✓r� kl hk t�7'> PX 6 1+1 ObC /q h �� r� t p�fS per%r�t� app f T +e Cf ►2 P d✓Qli 11;e or r,Ax+N,•&i d- >1, o� .S' f�. (�qt.k��%/ •-uf j Estimated Start Date I — i 2-- / b Estimated Completion Date* 1- I y — /.0 * Completion requires submittal of Completion Verification Notice (see page 4) ➢Was contact made with City and/or utility companies to locate existing utilities? if NO, Reason: Yes C. No ➢Is removal of existing streets, alleys, or sidewalks necessary? WYes C') No if YES, project must have City inspection prior to concrete replacement Richt of Way Use Permit Anulication Paye 2 of 4 Representative(s) of the Contractor must adhere to all construction standards approved by the City of Coppell, ii,hich includes but is not limited to: Erosion Control Ordinance, compaction requirements (density tests may be required at applicant's expense) and barricading according to the Texas Manual on Uniform Traffic Control Devices. Areas affected must be restored to as good condition as before the commencement of work (grading, drainage, vegetation, and erosion control). To schedule Public Works final inspection (Page 4) call 972-462-5155. ➢Any excavation requiring closing of a street/alley must be reported prior to closing to the following: Police Department @ 972-304-3600 Fire Department @ 972-304-3512 Street Department @ 972-462-5150 Engineering Department @ 972-304-3679 );-Attach barricade plan / trench safety plan if a lane or street closure is required. NOTE: Street closures are allowed from 9.00 a m unti13:30 p.m. ONLYunless otherwise approved by City Engineer. ➢Attach Work Order (franchise only) and/or 1 set'of prints showing proposed work. Locates for existing franchise utilities must be done 48 hours prior to beginning work. For City utility locates, call 972-462-5155 to schedule 48 hours prior to beginning work. The application with signatures of Franchise and Contractor representatives must be submitted to Engineering Dept. for approval prior to beginning work. Submittals by e-mail should go to engineer@coppelltx.gov. Printing your name indicates your acceptance of the terms and conditions of this form: (if you want the approved permit returned via e-mail, provide a valid e-mail address on Page 1.) Signature of Utility Company Representative ('=Iv,4 .0_t 4J.-%_ Signature of Contractor Representative Oa,,, d Sc hlcrlvr� Al hN t�sf,ti o Cit Representative 1.V11ll11Glll` 64-v 1 el Date Date I IH 4 Date ➢NOTE: Notify _ CIO Inspector at 972-304-3679 prior to beginning work and prior to backfill for concrete, trench, ditch and open pit inspections. Backfill inust meet all construction standards approved by the City of Coppell. Applicant shall indemnify and forever hold harmless against the City of Coppell each and every claim, denland or cause of action that nzay be made or come against it by reason of or if any way arising out of the closure, blocking, excavating, cutting, tunneling, or other work by the applicant under permit from the City, if such permit is granted. Page 3 of 4 COF FE,-- -EY . i UTILITY RELOCATION CHECKLIST FOR WORK WITHIN CITY OF COPPELL RIGHTS-OF-WAY OR EASEMENTS Listed below are minimum requirements for utility relocation projects: I.A copy of the valid approved City of Coppell permit is required on the project at all times. 2.Notify adjacent property owners (commercial & residential) of project timeline; provide them with contact names and phone numbers. 3.Proper erosion control measures must be taken. 4.Follow Texas MUTCD standards for work in traffic zones. 5.Sod is to be replaced when necessary. 6.Irrigation repairs must be performed in a timely manner. 7.Follow OSHA recommended trench safety at all times. 8.Repair existing utilities that are damaged, including but not limited to clean -outs, water valves, and SS manholes. 9.Densities may be required in trench lines (ASTM). LO -.Care and repair of street signage is the responsibility of the contractor. 11.No work is to be done in collector roadways before 9:00 a.m. or after 3:00 p.m. 13.Prior notice of work activity on weekends and holidays must be in writing. 13.Line locates must be performed in advance by contacting -1 800 DIG TESS and/or the following: CITY OF COPPELL UTILITIES DIVISION coppelltx Dov/utility-operations-division 972/462-5155 CITY OF COPPELL ENGINEERING DEPT. 972/ 304-3679 HOMEOWNER ASSOCIATIONS 972/ 304-3678 (Planning Department) TIME WARNER CABLE FEDERAL EMERGENCY MGMT. ADMIN. 214/ 320-5455 (Mike Rasmussen) 940/ 898-5138 AT&T LOCAL NETWORK TEXAS COMM. on ENVIRONMENTAL QUALITY 214/ 215-3031 (Rich Millenman) 817/ 588-5800 COSERV Gas & Electric DENTON CO. LEVEE DISTRICT 940/ 321-7800 x 7624 (Greg Ward) 214/ 352-5118 (Richard Hightower) EXPLORER PIPELINE Atmos Energy 918/ 493-5100 (Patrick Nwakoby) 972/360-4428 (Gary Dickinson) ONCOR Electric Delivery 972/ 323-8917 (Larry Redick) VERIZON COMMUNICATIONS 1 800 DIG TESS for litre locates 972/318-5277 (344-8377) 14. Contaminants must be removed from work area daily and disposed of properly outside the City. 15.Streets, sidewalks and alleys must be kept clean of construction material and debris. 16. "Clean-up" requires returning work area to pre -project condition or better. 17. Contractor is required to contact Public Works Division for Completion Verification Notice. (see pg. 4) S` t£ _ A T y o A= t• "-_"__ _ �. ^` _--:=mac'=' St UTILITY RELOCATION IN RIGI3T-OF-WAY OR EASEMENT COMPLETION VERIFICATION NOTICE Page 4 of 4 Contact City of Coppell Public Works Division at 972-462-5155 to schedule an inspection with Utility & Streets personnel to verify that your project has been completed to City of Coppell specifications. Failure to schedule vefification inspection may delay future projects. Franchise Utility Name Project Location / Applicant's Work Order # Cf applicable) Sub -contractor Company Name 24 hr.Contact Number Date of Verification Appointment Time of Verification Appointment INFORMATION BELOW TO BE COMPLETED BY CITY OF COPPELL PUBLIC WORDS PERSONNEL ❖Inspected by of Utilities Maintenance Division on. and found to be acceptable / not acceptable because Follow -tip needed? Oyes C', No •3lizspected by Follow-up scheduled for , of Streets Maintenance Division on and found to be acceptable / not acceptable because Follow-rcp needed? ()Yes C, No Folloit,-tip scheduled for A copy of this completed notice can be provided to the address below or e-mailed by using the button below: City of Coppell Engineering Dept. 255 Parkway Blvd., Coppell TX 75019 Office: 972-304-3679 Fax: 972-304-3570 Submit by E-mail Print Form a kappamapgroup.com ® CONTINUED ON MAP 1 NZtl N YAR. s •97°02'00" •97'01'00• tea,._. a' M o "BROOKS �o 1 S k 7 RH g z 4 HEATF 4HuntenwndPark i HEAHTHSME BETHEL 5 u z4 IrZSyS j 141 q a1 07o Seo o oa COPPELL 14 µ a .ago A N ,! 3 O BUB s U 1416:8 ;� e 15049 LVD GAT EAY BLu ' ,.,.• _ _ _ ,_ \ti_ COTTON _ __ "ITZ T L 1 AIBLI E W 2S o WRAI IGLER q co! c M '^ V �a 1 STATESMAN Q 09 -�a6 C a y o E TERSBLV_ 2 49 a R� Gp,V. �zy 24 26� 114 Z 1�TH 28 �\ f -71R ING9`�°" S� Hj4 ROY 47q i W L4 44 CP 4 Q a/�d�� ®� YYI a/B'h ---5 ntern ae ® nal�'�gtodkl �o 150 f J O 2, 45 a EESE 44 90 op o00n —yam rl [In M ml\� •97'02'001 9T'Ol'OD" SCALE IN MILES U I CONTINUED ON MAP 21 SCALE IN PEEP p 0 '/n /. '/o '/2 M Kappa Map Group, LLC 0 1000 2000 3000 �6�� BOOKPAGE1016 is E 0 z O rz