Loading...
CRDC 14-01 CS140822INTERSECTION IMPROVEMENTS (DENTON TAP ROAD AND SANDY LAKE ROAD) CITY OF COPPELL TNP PROJECT NO: CPL14141 MEETING AGENDA (August 22, 2014) • Introduction Independent School District stn ^ p teague nail & perktns www.tnpinccom 601 p�C'j • Existing conditions `� KC t,_ ��Ps • Lead time • Contact personnel • Design and construction requirements • Coordination during design and construction engineers surveyors landscape architects Verizon communications _ n e Sk C- G S Cia �wv • Existing conditions Mt pro 5 � Co CVL__,, VG 4S E • Lead time l� 11 • Contact personnel • Design and construction requirements • Coordination during design and construction Time Warner Cable r.. t • h:.eFu ,�r o. e� (cds" c.� o,.,, r (LO4__� 2 • Existing conditions � (P S • Lead time • Contact personnel • Design and construction requirements • Coordination during design and construction Fort Worth -1100 Macon Street- Fort Worth, Texas 76102- 817.336.5773 Dallas- 17304 Preston Road, Suite 1340- Dallas, Texas 75252-214.461.9867 Denton - 1517 Centre Place Drive, Suite 320- Denton, Texas 76205-940.383.4177 Sherman- 200 North Travis Street, Suite 500 - Sherman, Texas 75090-903.870.1089