CRDC 14-01 CS140822INTERSECTION IMPROVEMENTS
(DENTON TAP ROAD AND SANDY LAKE ROAD)
CITY OF COPPELL
TNP PROJECT NO: CPL14141
MEETING AGENDA
(August 22, 2014)
• Introduction
Independent School District
stn
^ p
teague nail & perktns
www.tnpinccom
601 p�C'j
• Existing conditions `�
KC t,_
��Ps
• Lead time
• Contact personnel
• Design and construction requirements
• Coordination during design and construction
engineers
surveyors
landscape architects
Verizon communications _ n
e Sk C- G S Cia �wv
• Existing conditions Mt pro 5 � Co CVL__,, VG 4S E
• Lead time l� 11
• Contact personnel
• Design and construction requirements
• Coordination during design and construction
Time Warner Cable
r.. t • h:.eFu ,�r o. e� (cds" c.� o,.,, r (LO4__� 2
• Existing conditions � (P S
• Lead time
• Contact personnel
• Design and construction requirements
• Coordination during design and construction
Fort Worth -1100 Macon Street- Fort Worth, Texas 76102- 817.336.5773 Dallas- 17304 Preston Road, Suite 1340- Dallas, Texas 75252-214.461.9867
Denton - 1517 Centre Place Drive, Suite 320- Denton, Texas 76205-940.383.4177 Sherman- 200 North Travis Street, Suite 500 - Sherman, Texas 75090-903.870.1089