Loading...
Coppell Ind 2- LR150828 2424 STUTZ DR.  SUITE 400  DALLAS, TX 75235  TEL [214] 350 5600  FAX [214] 350 0019 CONCRETE CYLINDER TEST REPORT Tradepoint Business Park Building 1B Expansion 980 W. Bethel Road Coppell, Texas REPORTED TO: Hillwood Investment Properties 3090 Olive Street, Suite 300 Dallas, Texas 75219 ATTN: Mr. Mike Jones REPORT NO. 99 REG PROJECT NO. 20346 SAMPLE DATE: 08-28-15 TECHNICIAN: S. Adams PAGE: 1 of 2 CONTRACTOR: Hillwood Construction Services Location of Sample Set Number Location Quantity Represented (c.y.) 1 Paving: 200’N, 90’E from SE building corner 10/390 2 Paving: 145’N, 75’E from SE building corner 110/390 3 Paving: 70’N, 70’E from SE building corner 220/390 4 Paving: 15’N, 55’E from SE building corner 300/390 Design Information Source of Concrete Mix Identification Specified Strength (psi) Argos 1685 3600 Test Results Set No. Cylinder ID Date Tested Age @ Test Total Load (lbs.) Compressive Strength (psi) Average Strength (psi) 1 9100 09-04-15 7 62500 4970 9100 09-25-15 28 9100 09-25-15 28 9100 09-25-15 28 9100 Hold H 2 9101 09-04-15 7 61690 4910 9101 09-25-15 28 9101 09-25-15 28 9101 09-25-15 28 9101 Hold H 3 9102 09-04-15 7 59360 4720 9102 09-25-15 28 9102 09-25-15 28 9102 09-25-15 28 9102 Hold H REPORT NO. 99 REG PROJECT NO. 20346 SAMPLE DATE: 08-28-15 PAGE: 2 of 2 Test Results Set No. Cylinder ID Date Tested Age @ Test Total Load (lbs.) Compressive Strength (psi) Average Strength (psi) 4 9103 09-04-15 7 54430 4330 9103 09-25-15 28 9103 09-25-15 28 9103 09-25-15 28 9103 Hold H Cylinder Data Set No. Cylinder ID Slump (inches) Time of Sample Air Temp. (°F) Concrete Temp. (°F) Air Entrainment (%) Unit Weight (lbs/ft3) Ticket Number 1 9100 4.0 2:00 AM 81 89 5.1 146.4 1677284 2 9101 4.75 3:30 AM 81 89 3.8 147.1 1677341 3 9102 5.0 5:15 AM 81 87 4.1 146.3 1677392 4 9103 5.25 6:30 AM 81 89 5.2 143.8 1677400 Note: (1) Concrete was sampled in accordance with ASTM C-31 (2) Concrete cylinders were tested in accordance with ASTM C-39 E-Mail Distribution: (1) Hillwood Investment Properties/ Mr. Mike Jones (1) Hillwood Investment Properties/ Ms. Sandy Carroll (1) Hillwood Construction Services/ Mr. David Grayson (1) Hillwood Construction Services/ Mr. Tom McConnell (1) City of Coppell/Mr. O’Dell Submitted by: REED ENGINEERING GROUP, LTD. Registration Number F-3114 Bill Woolwine Sr. Manager, CMT CT/cn