Loading...
Fairfield- 151002 (2)DEVELOPMENT FEE TABLE Project: Fairfield Inn and Suites Date: 101212015 TOTAL AMOUNT DUE FEES DUE PRIOR TO FILING PLAT Water Impact Fee $21,150.00 (100% due at Issuance of Building Permit) Water Tap Inspection Fee $150.00 100% due at Issuance of Water Meter) Water Meter Fee (Domestic) $2,417.56 (100% due at Issuance of Water Meter) Water Meter Fee (Irrigation/Fireline) $0.00 (100% due at Issuance of Water Meter) Water Meter Deposit (Domestic) $30.00 (100% due at Issuance of Water Meter) Iriigation/Fireline Meter Deposit $60.00 (100% due at Issuance of Water Meter) Wastewater Impact Fee $18,900.00 (100% due at Issuance of Building Permit) Wastewater Tap Inspection Fee $50.00 (100% due at Issuance of Building Permit) Utility Final Inspection Fee $50.00 (100% due at Issuance of Building Permit) Park Fee $0.00 $0.00 (100% due prior to Filing Plat) Roadway Impact Fee $26,932.50 $26,932.50 (100% due prior to Filing Plat) Street Light Fee Information not Available (100% due prior to Acceptance of Project) 11 Street Sign Fee Information not Available (100% due prior to Acceptance of Project) 11 Construction Inspection Fee Information not Available (100% due prior to Start of Construction) L TOTAL il $69,740.06 $26,932.50 TOTAL AMOUNT DUE PRIOR TO FILING FINAL PLAT ROADWAY IMPACT FEE CALCULATIONS PROJECT: Fuirfreld Lrn and Suites DATE: 10/2/2015 ROADWAY IMPACT FEE: Service Area * 1 Category ** Retail/Commercial Land Use ** Hotel No. Rooms 95 Development Units ** 95.00 Vehicle Miles per Development Unit ** 1.89 Fee per Vehicle Mile *** $150 Roadway Impact Fee due = (Development Units) x Vehicle Miles per Development Unit x (Fee per Vehicle Mile)= $26,932.50 * (Figure 4.1 - Roadway Impact Fee Study) ** (Table 4.10 - Roadway Impact Fee Study) *** (Schedule 2, Page 3 - The Master Fee Schedule)