ST0301C- LR151211G1 • GEOTECHNICAL ENGINEERING C I • ENVIRONMENTAL CONSULTING E I • CONSTRUCTION MATERIALS TESTING GEE Consultants, Inc. 10046 Monroe Drive • Dallas, Texas 75229 • (214) 352-5433 • Fax (214) 352-6972 Report Date: December 11, 2015 Date Concrete Placed: November 13, 2015 Standard 6"x12" Cylinders Client: City Of Coppell Cylinder Cross-sectional Area: 28.27 Square Inches Project: Bethel & Coppell Road Concrete Report No.: 36 Contractor: Iowa Bridge & Culvert Lc. Project No.: 215-140 Concrete Supplier and Plant: LMC 956 Location of Placement: E. Side Rail Pilaster MATERIALS Source / SSD Batch Wts. OBSERVATION DATA Description (Lbs/CuYd) Mix Number: 1701 Time Sample Batched: 8:29 AM Date Tested Time Sampled: 9:16 AM Cement: Sample Location: N. End of E. Rail Fly Ash: Truck / Ticket No: 3035/63096749 Coarse Aggregate: Temperature: BCR 167 Ambient Range: 55 OF Intermediate Aggregate: Concrete Range: 69 OF Fine Aggregate: Slump Range (inches): 4.25 Admixtures: Weather Conditions: Partly Cloudy 1 Time Started: 7:30 AM U Time Completed: 10:45 AM 2 Sample Air Content (%): 1.75 Added Water: 5 Gallons Total Cubic Yards Placed: 6.0 (Unless Noted Otherwise) Re wired Strength Lbs./s .in.): 3,600 Specimen Number Measured Slump (in.) Age (Days) Date Tested Total Load (Lbs.) Compressive Strength (Lbs./Sq.In.) Remarks BCR 166 7 11/20/15 139,940 4,950 BCR 167 28 12/11/15 165,940+ 5,870+ BCR 168 4.25 28 12/11/15 167,000+ 5,910+ BCR 169 U H Test Methods Utilized Fracture Regular Cylinders Made By: RB ASTM C-31, C-39, C-143 (Unless Noted Otherwise) Remarks and/or Distribution: cc: Mr. Rick Odell - City of Coppell via E-mail: Roden cr coppelltx.gov Mr. Michelle Matunas - City of Coppell via Email: mmatunasacoppelltx.gov Mr. George Marshall - City of Coppell via Email:arshall(a,)copgE1L1 .gov Mr. Robert Caudill - Tiseo Paving via Email: rcaudill tiseopaving.cnm GEE Consultants, Inc. TBPE Firm: F-3212 Reviewed by: All letters and reports are for the exclusive use of the client to whom they are addressed and shall not be reproduced without the full approval of GEE Consultants, Inc. The use of our name must receive our prior written approval. Our letters and reports apply only to the sample tested and/or observed and are not necessarily indicative of the quantities of apparently identical or similar products. G1 • GEOTECHNICAL ENGINEERING E I • ENVIRONMENTAL CONSULTING E I • CONSTRUCTION MATERIALS TESTING GEE Consultants, Inc. 10046 Monroe Drive * Dallas, Texas 75229 • (214) 352-5433 • Fax (214) 352-6972 Report Date: December 11, 2015 Date Concrete Placed: November 13, 2015 Standard 6"x12" Cylinders Ci of Coppell Client: City ppe Cylinder Cross-sectional Area: 28.27 Square Inches Concrete Report No.: 37 Project: Bethel & Coppell Road Project No.: 215-140 Contractor: Iron Concrete Construc. Concrete Supplier and Plant: Argos 110 Inlets, E. Side of S. Coppell Rd. Location of Placement: Source / SSD Batch Wts. OBSERVATION DATA MATERIALS Description (Lbs/CuYd) Mix Number: D10001083PPJ Time Sample Batched: Not Provided on Ticket 3:20 PM Time Sampled: Cement: Sample Location: Inlet in Front of Robortson Fly Ash: Truck / Ticket No: 0/01727087 Coarse Aggregate: Temperature: Ambient Range: 66 OF Intermediate Aggregate: Concrete Range: 75 OF Fine Aggregate: Slump Range (inches): 4.5 Admixtures: Weather Conditions: Cloudy Time Started: 1:30 PM 1 Time Completed: 4:45 PM 2 Sample Air Content CIO: 3.25 Added Water: 0 Gallons Total Cubic Yards Placed: 10 Re utred Stren h Lbs./s .in.: 4,200 Date Specimen Measuredf(Da Total Load Compressive Strength Remarks Number Slump (in.) Tested (Lbs.) (Lbs./Sq.In.) BCR 170 11/20/15 141,000 4,990 BCR 171 12/11/15 170,060+ 6,020+ 4.5 12/11/15 BCR 172 170,640+ 6,040+ BCR 173 H Test Methods Utilized Fracture Regular Cylinders Made By: RB ASTM C-31, C-39, C-143 (Unless Noted Otherwise) Remarks and/or Distribution: * Time sample batched is not provided on ticket cc: Mr. Rick Odell - City of Coppell via E-mail: Rodel1&oRMlltx.e0v Mr. Michelle Matunas - City of Coppell via Email: mmatunasna coppelltx cov Mr. George Marshall - City of Coppell via Email: g_marshaIJ copnelltx.cov Mr. Robert Caudill - Tiseo Paving via Email: rcaudili(&�,tiseopaving.eom GEE Consultants, Inc. TBPE Firm: - 321L at of GEE All letters and orreports writt naafi ooval e Ourllettersuse and eportsclient apply only o the sample tested and/or observed andreproduced are not necessarily the ind indicativefull of the quantities of apparently aidentical or similar products. receive