ST0301C- LR151221EG • GEOTECHNICAL ENGINEERING
E
• ENVIRONMENTAL CONSULTING GEE Consultants, Inc.
E • CONSTRUCTION MATERIALS TESTING
10046 Monroe Drive N Dallas, Texas 75229 • (214) 352-5433 • Fax (214) 352-6972
REINFORCING STEEL PLACEMENT
Report Date: December 21, 2015 Test Date: December 17, 2015
Client: City of, Coppell General. Report No.: 26
Project Bethel and Coppell Rd. Project No.: 215-0140
Identification Reinforcing Steel Observation
Method of Test Visual Observation
Page 1 of 1
Results
On December 17, 2015 reinforcing steel was observed at the following locations:
1) S. Coppell Rd., N. Bound Leave Outs, at Heath Lane
There were not discrepancies.
Technician: RB
CC: Mr. Rick Odell - City of Coppell via E-mail: Rodell(a),coppelltx.gov
Mr. Michelle Matunas -', City of Coppell via Email: mmatunasncoppelltx.gov
Mr. George Marshall - City of Coppell via Email; gmarshaIK coppelltx.gov
Mr. Robert Caudill - Tiseo Paving via Email: rcaudill�tiseopaving.com
GEE Consultants, Inc. TBPE Firm: F-3212 Reviewed b
All letters and reports are for the exclusive use of the client to whom they are addressed and shall not be reproduced without the full approval of GEE Consultants, Inc. The use of
our name must receive our prior written approval. Our letters and reports apply only to the sample tested and/or observed and are not necessarily indicative of the quantities of apparently
identical or similar products.
GI - GEOTECHNICAL ENGINEERING
E I - ENVIRONMENTAL CONSULTING
CONSTRUCTION MATERIALS TESTING
GEE Consultants, Inc.
10046 Monroe Drive 0 Dallas, Texas 75229 0 (214) 352-5433 0 Fax (214) 352-6972
REINFORCING STEEL PLACEMENT
Report Date: December 21, 2015 Test Date: December 16, 2015
Client: City of Coppell General Report No.: 27
Project Bethel'and Coppell Rd. Project No.: 215-0140
Identification Reinforcing Steel Observation
Method of Test Visual Observation
Page I of I
Results
On December 16, 2015 reinforcing steel was observed at the following locations:
1) Inlets at 50'S. of S. End of Box Culvert, S. Coppell Rd., N. Bound Lane
The following discrepancies were noted and called to the attention of Jesus, a representative of Tiseo Paving.
1) Missing rebars
2) Tie rebars properly
3) Clean out the trash
The above discrepancies were corrected as noted.
Technician: RB/JP
ce: Mr. Rick Odell - City of Coppell via E-mail: Rodell(&,,coppelltx.gov Michelle Matunas - City of Coppell via Email: mmatunasAco22eIItx.goy
Mr. George Marshall - City of Coppell via Email: gmarshallAoppelltx.go
Mr. Robert Caudill - Tiseo Paving via Email: rcaudill((Ttiseol2aving.co
GEE Consultants, Inc. TBPE Firm: F-3212 Reviewed by:e—
All letters and reports are for the exclusive use of the client to whom they are addressed and Shalt not be reproduced without the full approval of Uht Consultants, Inc. The use ot
our name must receive our prior wrmen approval. Our letters and reports apply only to the sample tested and/or observed and are not necessarily indicative of the quantities ofapparently
identical or similar products.
INICAL ENGINEERING
VIRONMENTAL CONSULTING
* CONSTRUCTION MATERIALS TESTING
GEE Consultants, Inc.
10046 Monroe Drive 0 Dallas, Texas 75229 0 (214) 352-5433 0 Fax (214) 352-6972
REINFORCING STEEL PLACEMENT
Report Date: December 21, 2015 Test Date: December 16, 2015
Client: City of Coppell General Report No.: 28
Project Bethel and Coppell Rd. Project No.: 215-0140
Identification Reinforcing Steel Observation
Method of Test Visual Observation
Page I of I
Results
On December 16, 2015 reinforcing steel was observed at the following locations:
1) S. Coppell Rd., N. Bound Lane, on Top of Box Culvert, Paving (Starnped/Colored Concrete)
There were no discrepancies.
* More than half of the concrete was already poured on arrival of technician.
Technician: RB
Cc: Mr. Rick Odell - City of Coppell via E-mail: Rodell6koppelltx.gov
Mr. Michelle Matunas - City of Coppell via Email: mmatunas(a),copvelltx.gov
Mr. George Marshall - City of Coppell via Email: gmarshalKitcopJ)elltx.gov
Mr. Robert Caudill -Tiseo Paving via Email: rcaudill(o),tiseopaving.com
GEE Consultants, Inc. TBPE Firm: F-3212 Reviewed by — C-1 ��. ..--_-
All letters and reports are for the exclusive use of the client to whom they are addressed and shall not be reproduced without the full approval of 6EE Consultants, Inc. The use, of
our name must receive our prior written approval. Our letters and reports apply only to the sample tested and/or observed and are not necessarily indicative ofthe quantities of apparently
identical or similar products.