Loading...
ST0301C- LR151223G( • GEOTECHNICAL ENGINEERING E • ENVIRONMENTAL CONSULTING GEE Consultants, Inc. E • CONSTRUCTION MATERIALS TESTING 10046 Monroe Drive Dallas, Texas 75229 0 (214) 352-5433 • Fax (214) 352-6972 e m Report Date: December 23, 2015 Date Concrete Placed: December 16, 2015 Standard 6"x12" Cylinders Client: City of Coppell Cylinder Cross-sectional Area: 28.27 Square Inches Project: Bethel & Coppell Road Concrete Report No.: 47 Contractor: Axis Project No.: 215-140 Concrete Supplier and Plant: TX1 Operations, LP 141 Location of Placement: E. Side Box Culvert Colored Paving MATERIALS Source /', SSD Batch Wts. OBSERVATION DATA Description (Lbs/CuYd) Mix Number: Cement: Fly Ash: Coarse Aggregate: Intermediate Aggregate: Fine Aggregate: Admixtures: 2 Added Water: 8274 6 Sack 0 Gallons Specimen Number Measured Slump (in.) Age (Days) Date Tested 13CR 218 5,030 5 12/21/15 BCR 219 7 12/23/15 BCR 220 1.4 28 1/13/16 BCR 221 28 1/13/16 BCR 222 H 11 Test Methods Utilized I Fracture Regular ASTM C-31, C-39, C-143 (Unless Noted Otherwise Remarks and/or Distribution: Truck dumber is not available Time Sample Batched Time Sampled: Sample Location: Truck / Ticket No: Temperature: Ambient Range: Concrete Range: Slump Range (inches): Weather Conditions: Time Started: Time Completed: Sample Air Content (%): Total Cubic Yards Placed: Rarniiri-d Ctrenoth (Lbs./so.in.): Total Load Compressive Strength (Lbs.) (Lbs./Sq.1n.) 142,240 5,030 156,300 5,530 cc: Mr. Rick Odell - City of Coppell via E-mail: Rodell(a�,coppelltx.> ov Mr. Michelle Matunas - City of Coppell via Email: mmatunas(aeoppelltx.gov Mr. George Marshall - City of Coppell via Email: g_ marshali(gcoppelltx.> ov Mr. Robert Caudill - Tiseo Paving via Email: rcaudiil(a),tiseopaving.com F-3212 Rev 10:14 AM 11:05 AM 40'N. of S. End of Box Culvert Station 4+30 */3109241 48 OF 68 OF 1.4 Cloudy 8:30 AM 5:00 PM 2.25 23 Cylinders Made By: RB/JP Remarks All letters and reports are for the exclusive use of the client to whom they are addressed and shall not be reproduced without the full approval of GEE Consultants, Inc. The use of our name must receive our prior written approval. Our letters and reports apply only to the sample tested and/or observed and are not necessarily indicative of the quantities of apparently identical or similar products. G I -GEOTECHNICAL ENGINEERING E -ENVIRONMENTAL CONSULTING GEE JL_s Consultant, Inc. Description (Lbs/CuYd) BCR 224 E I - CONSTRUCTION MATERIALS TESTING 8274 Time Sample Batched: 3:12 PM 10046 Monroe Drive Dallas, Texas 75229 0 (214) 352-5433 0 Fax (214) 352-6972 REPORT OF CONCRETE MIX OBSERVATION Report Date: December 23, 2015 Date Concrete Placed: December 16, 2015 Standard 6"xl2" Cylinders Client: City of Coppell Cylinder Cross-sectional Area: 28.27 Square Inches Project: Bethel & Coppell Road Concrete Report No.: 48 Contractor: Tiseo PaVring Project No.: 215-140 Concrete Supplier and Plant: Tiseo Paving Location of Placement: Inlets at L,. Side MATERIALS Source / SSD Batch Wts. OBSERVATION DATA (Days) Tested BCR 223 Description (Lbs/CuYd) BCR 224 28 1/13/16 Mix Number: 8274 Time Sample Batched: 3:12 PM Cement: 6 Sack Time Sampled: Sample Location: 3:00 PM Inlet at 50' S. of S. End of Box Fly Ash: *Truck number is not available. Culvert Coarse Aggregate: Truck / Ticket No: */3586 Intermediate Aggregate: Temperature: Ambient Range: 55 OF Fine Aggregate: Concrete Range: 72 OF Admixtures: Slump Range (inches): 2.25 Weather Conditions: Sunny Time Started: 8:30 AM 2 Time Completed: 5:00 PM Added Water: 0 Gallons Sample Air Content 3.5 Total Cubic Yards Placed: 9 Specimen Measured Age Date Number Slump (in.) (Days) Tested BCR 223 7 12/23/15 BCR 224 28 1/13/16 2.25 BCR 225 28 1/13/16 BCR 226 1 K H I H —i Methods Utilized est Methods Utilized fest =C.t3 Fracture Regular M C 1, 9 _ 143 -39, C-143 ASTM C-3 1, , C (Unless Noted Otherw' Remarks and/or Distribution: *Truck number is not available. ** Ticket was printed out later Total Load Compressive Strength (Lbs.) (Lbs./Sq.1n.) 148,600 5,260 cc: Mr. Rick Odell - City Of COPPCII via E-mail: RodellAcoppelltx.aov Mr. Michelle Matunas - City of Coppell via Email: mmatunas(&_col)PeIItx-gOv Mr. George Marshall - City of Coppell via Email: Marshalij�co �elltx- gov Mr. Robert Caudill - Tiseo Paving via Email: rcaudill(a-Riseopaving.com Inc Firm: F-3212 Cylinders Made By: RB/JP Remarks are addressed and shall not be reproduced without the full approval of GEE Consultants, Inc. "rhe use of our name must receive All tenors and reports are for the exclusive use of the client to whom they r our prior written approval. Our letters and reports apply only to the Sample tested and/or observed and are not necessarily indicative of the quantities of apparently identical or similar products