Loading...
ST0301C- LR151223 (2)G1o GEOTECHNICAL ENGINEERING E • ENVIRONMENTAL CONSULTING GEE Consultants1 Inc. E] * CONSTRUCTION MATERIALS TESTING 10046 Monroe Drive Dallas, Texas 75229 0 (214) 352-5433 Fax (214) 352-6972 REPORT OF IN-PLACE DENSITY AND MOISTURE OF SOIL Density Report No. 20 (215-140) Method: ASTM D6938 D698 Page I of I Client: City of Coppell Project: Bethel & Coppell Rd. Test Date: December 4, 2015 Report Date: December 23, 2015 Required Density (%): Min. 95% Required Moisture (%): General Fill - Opt. Moisture Content -2% to +4% Material Description Maximum Optimum Dry Density Moisture Percent (Lbs./cu.ft.) Content (Percent) 1, Light Brown Clayey Sand 106.3 13.8 W/ Gravel 2. Dark Brown Clayey Sand W/ Organics 104.8 15.2 3. Brown and Yellowish Brown Clayey Sand 108.1 16.1 W/ OCC. LS Frags and Sand Pkts. 4. Brown and Reddish Brown Clayey Sand 115.3 11.8 W/ LS gravel & Sandy Shale Frags 16" Water Line, 50'W. of Park Rd., 2' 5. Brown Sandy Clay (Lime Treated) (North 96.7 22.4 Side) 6. Brown Sandy Clay (Lime Treated) (South 103.0 19.0 Side) 7.Reddish Brown Clayey Sand and Reddish 112.2 14.0 Brown, Yellow Brown and Light Gray Sandy Shaley Clay "Material' Probe Location I Elevation (and/or) Lift in -Place In -Place Percent Depth Dry Density Moisture Compaction (inches) (Lhs/Cu.Ft.) Content 240 7 6 16" Water Line, 50'W. of Park Rd., 2' 121.1 13.8 107.9 Below Final Grade cc: Mr. Rick Odell - City of Coppell via E-mail: Rodell(&col2l2elltx. ov Mr. Michelle Matunas - City of Coppell via Email: mmatunas@col)pelltx.gov Mr. George Marshall - City of Coppell via Email: gmarshaIIAcol)DeIItx.gov Mr. Robert Caudill - Tiseo Paving via Email: rcaudill@tiseopaving.com GEE Consultants, Inc . .... ... . . . . _ TBPE Firm: F-3212 — Rev 1Q1C_1­ All letters and reports are for the exclusive use of the client to whom they are addressed and shall not be reproduced without the full approval of GEE Consultants, Inc, The use of our name must receive our prior written approval, Our letters and reports apply only to the sample tested and/or observed and are not necessarily indicative of the quantities of apparently identical or similar products G1 - GEOTECHNICAL ENGINEERING E - ENVIRONMENTAL CONSULTING GEE Consultants, Inc. Moisture E -CONSTRUCTION MATERIALS TESTING (Percent) 10046 Monroe Drive - Dallas, Texas 75229 - (214) 352-5433 - Fax (214) 352-6972 REPORT OF IN-PLACE DENSITY AND MOISTURE OF SOIL Density Report No. 21 (215-140) Method: ASTM D6938 D698 Page I of 1 Client: City of Coppell Project: Bethel & Coppell Rd. Test Date: December 17, 2015 Report Date: December 23, 2015 Required Density (%): Min. 95% Required Moisture (%): General Fill - Opt. Moisture Content -2% to +4% cc: Material Description Maximum Optimum Dry Density Moisture (Lbs./cu.ft.) Content (Percent) 1. Light Brown Clayey Sand 106.3 13.8 W/ Gravel 2. Dark Brown Clayey Sand W/ Organics 104.8 15.2 3. Brown and Yellowish Brown Clayey Sand 108.1 16.1 W/ OCC. LS Frags and Sand Pkts. 4. Brown and Reddish Brown Clayey Sand 115.3 11.8 W/ LS gravel & Sandy Shale Frags 5. Brown Sandy Clay (Lime Treated) (North 96.7 22.4 Side) 6. Brown Sandy Clay (Lime Treated) (South 103.0 19.0 Side) 7.Reddish Brown Clayey Sand and Reddish 112.2 14.0 Brown, Yellow Brown and Light Gray Sandy Shaley Clay 241 6 6 Coppell Rd., N. Bound, 120'N. of N. End 101.7 19.8 98.7 of Box Culvert, 8'W. of E. Curb, Subgrade (Leave Out) 243 6 6 I Coppell Rd. N Bound (Leave Out), 150'S.105.7 105.7 I 18.1 ( 102.6 of Cooper Ln. 8'W. of E Curb, Subgrade Mr. Rick Odell - City of Coppell via E-mail: Rodell(&coppelltx.g-ov Mr. Michelle Matunas - City of Coppell via Email: mmatunas@coppelltx.gov Mr. George Marshall'- City of Coppell via Email: g_marshall(a)coppelltx.uov Mr. Robert Caudill - Tiseo Paving via Email: rcaudill ,tiseopaving.com GEE Consultants, Inc. TBPE Firm: F-3212 Reviewed by: " Q " K ) �'- All letters and reports are for the exclusive use of the client to whom they are addressed and shall not be reproduced without the full approval of GEE Consultants, Inc. The use of our name must receive our prior written approval. Our letters and reports apply only to the sample tested and/or observed and are not necessarily indicative of the quantities of apparently identical or similar products M - GEOTECHNICAL ENGINEERING 10046 Monroe Drive 6 Dallas, Texas 75229 0 (214) 352-5433 Fax (214) 352-6972 REPORT OF IN-PLACE DENSITY AND MOISTURE OF SOIL Density Report No. 21(215-140) Client: City of Coppell Project: Bethel & Coppell Rd. Test Date: December 17, 2015 Report Date: December 23, 2015 Required Density (%): Min. 95% Required Moisture (%): General Fill - Opt. Moisture Content -2% to +4% Method: ASTM D6938 D698 Page I of I Material Description E - ENVIRONMENTAL CONSULTING GEE Consultants, inc. (Lbs./cu.ft.) El # CONSTRUCTION MATERIALS TESTING (Percent) 1. Light Brown Clayey Sand 10046 Monroe Drive 6 Dallas, Texas 75229 0 (214) 352-5433 Fax (214) 352-6972 REPORT OF IN-PLACE DENSITY AND MOISTURE OF SOIL Density Report No. 21(215-140) Client: City of Coppell Project: Bethel & Coppell Rd. Test Date: December 17, 2015 Report Date: December 23, 2015 Required Density (%): Min. 95% Required Moisture (%): General Fill - Opt. Moisture Content -2% to +4% Method: ASTM D6938 D698 Page I of I Material Description Maximum Optimum Dry Density Moisture (Lbs./cu.ft.) Content (Percent) 1. Light Brown Clayey Sand 106.3 13.8 W/ Gravel 2. Dark Brown Clayey Sand W/ Organics 104.8 15.2 3. Brown and Yellowish Brown Clayey Sand 108.1 16.1 W/ OCC. LS Frags and Sand Pkts. 4. Brown and Reddish Brown Clayey Sand 115.3 11.8 W/ LS gravel & Sandy Shale Frags 5. Brown Sandy Clay (Lime Treated) (North 96.7 22.4 Side) 6. Brown Sandy Clay (Lime Treated) (South 103.0 19.0 Side) 7.Reddish Brown Clayey Sand and Reddish 112.2 14.0 Brown, Yellow Brown and Light Gray Sandy Shaley Clay 244 1 6 Driveway, In Front of 556, S. Coppell Rd. 102.0 16.1 96.0 N. Bound, WE, of E. Curb and 10' S. of N. End of Driveway cc: Mr. Rick Odell - City of Coppell via E-mail: Rodellacoppelltx.go Mr. Michelle Matunas - City of Coppell via Email: mmatunas(&,coppelltx.gov Mr. George Marshall - City of Coppell via Email: gmarshallAcoppelltx.go Mr. Robert Caudill - Tiseo Paving via Email: rcaudill@tiseopaving.com GEE Consultants, Inc. TBPE Firm: F-3212 Reviewed by: All letters and reports are for the exclusive use of the client to whom they are addressed and shall not be reproduced without the full approval of GEE Consultants, Inc. The use of our name must receive our prior written approval. Our letters and reports apply only to the sample tested and/or observed and are not necessarily indicative of the quantities of apparently identical or similar products