Loading...
ST0301C- LR150611 (4)G I -GEOTECHNICAL ENGINEERING E - ENVIRONMENTAL CONSULTING GEE Consultants, Inc. E • CONSTRUCTION MATERIALS TESTING 10046 Monroe Drive - Dallas, Texas 75229 - (214) 352-5433 - Fax (214) 352-6972 MOISTURE DENSITY RELATIONSHIP REPORT Test Report Date: June 11, 2015 Project No: 215-0140 Client: City of CoppelI Sample Date: December 7, 2015 Moisture Report No. 7 Project: Bethel and Coppell Rd. Paving & Utility Impr. Coppell, TX Identification: Moisture Density Relationship , Test Procedure: ASTM D698, D4318, D1140 Test Results: Method.......................................... A Optimum Moisture Content ........................ 14.0 percent Maximum Density ............................... 112.2 pounds per cubic foot Rammer Type ................................... Manual Material Description .............................. R. Brown Clayey Sand and Y. Brown and Light Gray Sandy Shaley Clay Material Origin .................................. Bethel Rd. Water Line Backfill at 50'W. of Park Road Moisture Preparation Procedure ..................... Air Dry Liquid Limit .................................... 28 Plastic Limit .................................... 16 Plasticity Index .................................. 12 Percent Passing No. 200 U.S. Sieve ................. 37 cc: Mr. George Marshall - via: GMarshall@coppelltx.gov Mr. Rick Odell - via: Rodell@coppelltx.gov GEE Consultants, Inc. TBPE Firm: F-3212 Reviewed b��� Our letters and reports are for the exclusive use of the client to whom they are addressed. The use of our name must receive our prior written approval. Our letters and reports apply only to the sample tested and/or observed, and are not necessarily indicative of the quantities of apparently identical or similar products.