ST0301C- LR160113. GEOTECHNICAL ENCINEERING . ENVIRONMENTAL CONSULTINC GEE Consultants, Inc. . CONSTRUCTION MATERIALS TESTINC 10046 Monroe Drive ' Dallas, Texas 75229 . (214) 3s2-s433 . Fax (214) 3s2_6g72 REPORT OF CONCRETE MIX OBSERVATION Report Date: Client: Project: Contractor: Concrete Supplier and Planl Location of Placement: January 13,2016 Date Concrete Placed City of Coppell Bethel & Coppell Road Axis TXI Operations, LP 141 Paving Driveway December 16,2015 Standard 6"x12" Cylinders Cylinder Cross-sectional Area: 28.27 Square lnches Concrete Report No.: 46 Project No.: 215-140 MATERIALS Source / Description SSD Batch Wts (Lbs/CuYd)OBSERVATION DATA Mix Number: Cement: Fl1'Ash: Coarse Aggregate: Intermediate Aggregate: Fine Aggregate: Admixtures: I 2 Added Water: Time Sample Batched: Time Sampled: Sample Location: Truck / Ticket No: Temperature: Ambient Range: Concrete Range: Slump Range (inches): Weather Conditions: Time Started: Time Completed: Sample Air Content (%): Total Cubic Yards Placed: 9:35 AM l0:30 AM Drivervay at I 10' N. of Bethel Rd *i3109134 ,18'F 66'F 5.75 Cloudy 8:30 AM 5:00 PM 3.0 22 8274 6 Sack 0 Gallons 3.600 cc: Mr. Rick Odell - City of Coppell via E-mail: Rodellr?coppellt\.eov Mr. Michelle Matunas - City of Coppell via Email: mmatunas@coppelltx.sov Mr. George Marshall - City of Coppell via Email: smarshall@coppelltx.sov Mr. Robert Caudill - Tiseo Pavins via Email: rcaudill@tiseooavins.com ,,.:1-) ,t / GEE Consultants. Inc. TBPE Firm: F-3212 Reviewed bv: i ^L{J"+' bsredL ln. Specimen Number Measured Slump (in.) Age (Days) Date Tested Total Load (Lbs.) Compressive Strength (Lbs./Sq.ln.)Remarks BCR 213 BCR 214 BCR 215 BCR 216 BCR 2I7 5.7 5 5 7 28 28 H 12t21n5 12t23t15 ln3t16 v13n6 H 32,160 3 r,660 6 r .980 ,18.780 4,670 4,660 5,73 0 s )60 Test Methods Utilized ASTM C-31, C-39, C-143 Fracture Regular (Unless Noted Otheru'ise)Cylinders Made By: RB/JP Remarks and/or Distribution: Truck number is not available . CEOTECHNICAL ENGINEERINC . ENVIRONMENTAL CONSULTINC . CONSTRUCTION MATERIALS TESTINC 10046 Monroe Drive .Dallas, Texas 75229 , (2t 4) 352-5433 . Fax (214) 352-6972 GEE Consultants/ lnc. REPORT OF CONCRETE MIX OBSERVATION Report Date: Client: Project: Contractor: Concrete Supplier and Plant Location of Placement: January 13,2016 Date Concrete Placed City of Coppell Bethel & Coppell Road Axis TXI Operations, LP 141 E. Side Box Culvert Colored Paving Cylinder Cross-sectional Area: 28.27 Square lnches Concrete RePort No.: 47 Project No.: 215-140 December 16,2015 Standard 6"x12" CYlinders MATERIALS Source / Description SSD Batch Wts. (Lbs/CuYd)OBSERVATION DATA Mix Number: Cement: Fly Ash: Coarse Aggegate: Intermediate Aggregate: Fine Aggregate: Admixtures: I 2 Added Water: Time Sample Batched: Time Sampled: Sample Location: Truck / Ticket No: Temperature: Ambient Range: Concrete Range Slump Range (inches): Weather Conditions: Time Started: Time Completed: Sample Air Content (%): Total Cubic Yards Placed: 10:14 AM I 1:05 AM 40' N. of S. End ol'Box Culvert Station 4+30 * 13109241 48'F 68 "F 1.4 Cloudy 8:30 AM 5:00 PM 2.25 L) 8274 6 Sack 0 Gallons p ired Strength (Lbs./sq.in Specimen Number Measured Slump (in.) Age (Days) Date Tested Total Load (Lbs.) Compressive Strenglh (Lbs./Sq.ln.) Remarks BCR 218 BCR 219 BCR 220 BCR 221 BCR222 1.4 7 28 28 H 1212v15 12123115 l/t3i16 v13ll6 H tJ) )40 I 56.300 169.940 l9 I .780+ 5,030 ). )JU 6,0r0 6,780 + Test Methods Utilized ASTM C-31, C-39, C-143 Fracture Regular (Unless Noted Othenvise) C1 linders Made By: RB/JP Remarks and/or Distribution: Truck number is not available cc: Mr. Rick Odell - City of Coppell via E-mail: Rodell@coppelltx qov Mr. Michelle Matunas - city of coppell via Email: mmatunas@coDpelltx.sov Mr. George Marshall - city of coppell via Email: smarshall@coppelltx eov Mr. Robert caudill - Tiseo Paving via Email: rcaudill .tiseopaving.com GEE Consultants, Inc. TBPE Firm: F-3212 Reviewed bv: . CEOTECHNICAL ENCINEERING . ENVIRONMENTAL CONSULTINC GEE Consultants, Inc. . CONSTRUCTION MATERIALS TESTTNC REPORT OF CONCRETE MIX OBSERVATION Report Date: Client: Project: Contractor: Concrete Supplier and Plant: Location of Placement: January 13,2016 Date Concrete Placed City of Coppell Bethel & Coppell Road Tiseo Paving Tiseo Paving Inlets at E. Side Standard 6"112" Cylinders Cylinder Cross-sectional Area: 28.27 Square lnches Concrete Repon No.: 48 Project No.: 215-140 December 16,2015 MATERIALS Source / Description SSD Batch Wts. (Lbs/CuYd)OBSERVATION DATA Mix Number: Cement: Fly Ash: Coarse Aggregate: Intermediate Aggregate: Fine Aggregate: Admixtures: I 2 Added Water: 8274 6 Sack 0 Gallons Time Sample Batched: Time Sampled: Sample Location: Truck / Ticket No: Temperature: Ambient Range: Concrete Range: Slump Range (inches): Weather Conditions: Time Started: Time Completed: Sample Air Content (%): Total Cubic Yards Placed: 3:12 PM *x 3:00 PM Inlet at 50' S. of S. End of Bor Culvert */3 586 55 "F 72'F 2.25 Sunny 8:30 AM 5:00 PM 3.5 o lred Strength(Lbs./sq.in.): 3,600 Specimen Number Measured Slump (in.) Age (Days) Date Tested Total Load (Lbs.) Compressive Strength (Lbs./Sq.ln.)Remarks BCR 223 BCR224 BCR 225 BCR226 2.25 7 28 28 H 12123n5 Ut3t16 1113t16 H 148,600 1 90,400+ I 90.860 5.260 6,740 + 6,750 Test Methods Utilized ASTM C-31, C-39, C-143 Fracture Regular (Unless Noted Othenvise)C1'linders Made By: RB/JP Remarks and/or Distribution: xTruck number is not available. ** Ticket rvas printed out later cc: Mr. Rick Odell - City of Coppell via E-mail: Rodell coppelln.eov Mr. Michelle Matunas - City of Coppell via Email: mmatunas@coppelltx.eov Mr. George Marshall - City of Coppell via Email: smarshall{lcoppelhx.sor Mr. Robert Caudill - Tiseo Paving via Email: rcaudill@tiseopaving.com GEE Consultants, Inc. TBPE Firm: F-3212 Reviewed by: . CEOTECHNICAL ENCINEERING . ENVIRONMENTAL CONSULTINC CEE Consultants, lnc. o CONSTRUCTION MATERIALS TESTTNC l g'r \! REPORT OF CONCRETE MIX OBSERVATION Report Date: Client: Project: Contractor: Concrete Supplier and Plant: Location of Placement: January 13,2016 Date Concrete Placed City of Coppell Bethel & Coppell Road Axis Contracting, Inc. TXI Operation, LP 141 Standard 6"x12" Cylinders Cylinder Cross-sectional Area: 28.27 Square Inches Concrete Report No.: 58 Project No.: 215-1,10 January 6,2016 S. Coppell Rd., E. Side Sidewalk, 40' S. from Heath Ln. MATERIALS Source / Description SSD Batch Wts. (Lbs/CuYd)OBSERVATION DATA Mix Number: Cement: Fly Ash: Coarse Aggregate: Intermediate Aggregate: Fine Aggregate: Admixtures: I I Added Water: 8272 5 Sack Time Sample Batched: Time Sampled: Sample Location: Truck / Ticket No: Temperature: Ambient Range: Concrete Range: Slump Range (inches): Weather Conditions: Time Started: Time Completed: Sample Air Content (%): Total Cubic Yards Placed: Reviewed bv: 9:32 AM 10:20 AM S. Coppell Rd.. 40' S. lrom llealth Ln. Right Sidewalk 0v3t29781 45 0F 55 'F 5.5 Cloudy 9:00 AM l:30 PM 3.0 10.0 cc: Mr. Rick Odell - City of Coppell via E-mail: Rodell?coppelln.eov Mr. Michelle Matunas - City of Coppell via Email: mmatunasAcoppelltx.sov Mr. George Marshall - City of Coppell via Email: smarshall@coppelltx.sor Mr. Robert Caudill - Tiseo Paving via Email: rcaudill,?tiseopavins.com GEE Consultants, Inc. TBPE Firm: F-3212 lred StrengthiLbs./sq.in..y: 4,000 Specimen Number Measured Slump (in.) Age (Days) Date Tested Total Load (Lbs.) Compressive Strength (Lbs.i Sq.ln,)Remarks BCR 266 BCR 267 BCR 268 BCR 269 5.5 7 28 28 F{ v13t16 213il6 2t3il6 H I 00.400 Test Methods Utilized ASTM C-3t, C-39, C-143 Fracture Regular (Unless Noted Otheru,ise)C1'linders Made By: YS Remarks and/or Distribution: