Loading...
Copperstone-LR 960410 GBO- CONSULTING ENGINEERS IN: TB~r~u*~e qvironmenta[ Assessments ~, - - Soils & Foundations Construction Materiels Testing "Excet[ence by Experience" Commercia[ & lndustria[ Inspection PO Box 92548 · South[ake, Texas 76092 · (817) 329-0281 CONCRETE CYLINDER TEST RESULTS PROJECT: Copper Stone LOCATION: Coppell JOB #: 95-1522 DATE OF BREAK: 04-10-96 DAY: Wednesday CLIENT: Copper Stone Ltd CONTRACTOR: Glenn Thurman, Inc c/o Briscoe Clark Comp CYL. SLUMP DATE OF DAYS I.D. LOCATION (IN.) SAMPLE AGED POUNDS PSI Sidewalk: 49A @ south side* 04-03-96 7 110,000 3891 Copperstone Crt: 35C @ cul-de-sac 3.0" 03-13-96 28 117,500 4156 35D @ cul-de-sac 3.0" 03-13-96 28 119,000 4209 Alley C: 36C @ Station 3+50 3.5" 03-13-96 28 118,000 4174 36D @ Station 3+50 3.5" 03-13-96 28 115,500 4086 * made by contractor SPECIFICATIONS: 3000 psi @ 28 days SUPPLIER: Glenn Thurman, Inc Chris Quentin Technician