Loading...
ST0301C- LR160114 (2)• GEOTECHNICAL ENGINEERING E I • ENVIRONMENTAL CONSULTING E I • CONSTRUCTION MATERIALS TESTING GEE Consultants, Inc. 10046 Monroe Drive • Dallas, Texas 75229 • (214) 352-5433 • Fax (214) 352-6972 REINFORCING STEEL PLACEMENT Report Date: January 14, 2016 Client: City of Coppell Project Bethel and Coppell Rd. Identification Reinforcing Steel Observation Test Date: December 30, 2015 General Report No.: 31 Project No.: 215-0140 Method of Test Visual Observation Page. l of 1 Results on December 30, 2015 reinforcing steel was observed at the following locations: 1) S. Coppell Rd., N. Bound Lane Driveway The following discrepancies were noted and called to the attention of Lopez, a representative of Axis Contracting, Inc. 1) Missing rebars 2) Clean out trash The above discrepancies were corrected as noted. Technician: RB cc: Mr. Rick Odell -City of Coppell via E-mail: Rodel�conpelltx.gov Mr. Michelle Matunas - City of Coppell via Email: mmatunas(ikoppelltx.gov Mr. George Marshall - City of Coppell via Email: gmarshal1 a7coMe_1hx.gov Mr. Robert Caudill - Tiseo Paving via Email: rcaudill a tiseopaving.com GEE Consultants, Inc TBPE Firm: F-3212 Reviewed by: All letters and reports are for the exclusive use of the client to whom they are addressed and shall not be reproduced without the full approval of GEE Consultants Inc The use of our name must receive our prior written approval. Our letters and reports apply only to the sample tested and/or observed and are not necessarily indicative of the quantities of apparently identical or similar products. G1 * GEOTECHNICAL ENGINEERING E I - ENVIRONMENTAL CONSULTING CONSTRUCTION MATERIALS TESTING GEE Consultants, Inc. 10046 Monroe Drive • Dallas avnc 7r -)-)Q I T • (2 14) 352-5433 REINFORCING STEEL PLACEMENT Report Date: January 14, 2016 Client: City of Coppell Project Bethel and Coppell Rd. Identification Reinfbrcing Steel Observation Method of Test Visual Observation Results On January 4, 2016 reinforcing steel was observed at the following locations: 1) S. Coppell Rd., Driveway 528 There were no discrepancies. Technician: YS CC: Mr. Rick Odell - City of Coppell via E-mail: Rodell(@covyelltx.gov Mr. Michelle Matunas - City of Coppell via Email: mmatunas(a-),coi)pelltx.gov Mr. George Marshall - City of Coppell via Email: gmarshall coppelltx.gov Mr. Robert Caudill - Tiseo Paving via Email: rcaudill(@tiseopavin�.com Fax (214) 352-6972 Test Date: January 4, 2016 General Report No.: 32 Project No.: 215-0140 Page I of I GEE Consultants, Inc. TBPE Firm: F-3212 Reviewed by: All letters and reports are for the exclusive use of the client to whom they are addressed and shall not be reproduced without the full approval of GEE Consultants, Inc. The use of our nam t receiveourpnwritten Our letters and reports apply only to the sample tested and/or observed and are not necessarily indicative of the quantities ofapparently e ran' identical or similar products, GI- GEOTECHNICAL ENGINEERING ENVIRONMENTAL CONSULTING CONSTRUCTION MATERIALS TESTING GEE Consultants, Inc. 10046 Monroe Drive 0 Dallas, Texas 75229 • (214) 352-5433 0 Fax (214) 352-6972 REINFORCING STEEL PLACEMENT Report Date: January 14, 2016 Client: City of Coppell Project Bethel and Coppell Rd. Identification Rein:forcing Steel Observation Test Date: January 6, 2016 General Report No.: 33 Project No.: 215-0140 Method of Test Visual Observation Page I of I Results On January 6, 2016 reinforcing steel was observed at the following locations: 1) S. Coppell Rd., Right Sidewalk The following discrepancies were noted and called to the attention of Lopez, a representative of Axis Contracting, Inc. 1) Parallel rebar, add chairs The above discrepancies were corrected as noted. Technician: YS cc: Mr. Rick Odell - City of Coppell via E-mail: Roden ,coypelltx.gov Mr. Michelle Matunas - City of Coppell via Email: mrnatunas(a-),coppeIItx.R_ov Mr. George Marshall - City of Coppell via Email: gMarshall(i4coppelltx.gov Mr. Robert Caudill - Tiseo Paving via Email: rcaudillAtiseopaving.co GEE Consultants, Inc. TBPE Firm: F-3212 Reviewed by: _ ?_' All letters and reports are for the exclusive use of the client to whom they are addressed and shall not be reproduced without the full approval of GEE Consultants, ine. The use of our name must receive our prior written approval. Our letters and reports apply only to the sample tested and/or observed and are not necessarily indicative ofthe quantities of apparently identical or similar products.