Loading...
Copperstone-LR 960409 (2) G~O- CONqULTING ENGINEERS IN: T~'I~'~ ~nvironmenta[ Assessments ~, Soits & Foundations Construction Materials Testino ,'Exce[[ence byExperience" Commercial & Industria[ inspection PO Box 92548 · South[ake, Texas 76092 · (817) 329-0281 CONCRETE CYLINDER TEST RESULTB PROJECT: Copper Stone LOCATION: Coppell JOB #: 95-1522 DATE OF BREAK: 04-09-96 DAY: Tuesday CLIENT: Copper Stone Ltd CONTRACTOR: Clack Construction c/o Briscoe Clark Comp SUB-CONTRACTOR: Beck Foundations CYL. SLUMP DATE OF DAYS I.D. LOCATION (IN.) SAMPLE AGED POUNDS PSI East End Rip-Rap: 49A @ north section* 04-02-96 7 121,000 4280 72' drilled pier E: 31C @ east abutment 6.5" 03-12-96 28 145,500 5147 31D @ east abutment 6.5" 03-12-96 28 121,000 5164 SPECIFICATIONS: 3600 psi @ 28 days SUPPLIER: Jeff Holden Technician