WA9302A-CN 960723 ' "' "~Z~ m AGENDA REQUEST FORM
~With I Future
CITY COUNCIL MEETING: July 23, 1996 ITIm # ~
Consider approv~ or Change Order #2 to the Village Parkway ~mp Station Addition ~oject ~ WA
93-02 in the mount or $152,739.00 rot a new Supervisory Control ~d Data Acquisition (SCADA)
System and author~e the Ma~or to sign.
A P, qq 0 /ED
BY
~'ZiYY COUNCIL
TITLE: ACM/CiIy Engineer INITIALS __~
STAFF COI~IENTS:
See attached memo.
STAFF RECOMMENDATION Approval X Denial
EXPLANATION:
Staff willbe availableto answer any questionsatthe Council meeting.
BUDGET AMT. $ AMT. EST. $ +/- BUD: $
FINANCIAL COMMENTS:
Funds are available in the Water/Sewer CIP Accounts.
FINANCIAL REVIEW~ CITY MANAGER REVIEW
Agenda Request Form - Revised 1194 Document Name 5.eng
MEMORANDUM
To: Mayor and City Council
From: Kenneth M. Griffin, P.E., ACM/City Engineer ~
lIE: Consider approval of Change Order #2 to the Village Parkway Pump Station
Addition Project # WA 93-02 in the amount of $152,739.00 for a new
Supervisory Control and Data Acquisition (SCADA) System and authorize the
Mayor to sign.
Date: July 15, 1996
During the construction at the Village Parkway Pump Station to add additional pumping
capabilities to the system, the City has been evaluating its existing SCADA System. Because
there have been some problems with the current SCADA System when there are glitches with
the telephone lines, the City is requesting approval of a Change Order to install a new SCADA
System that would operate on a radio frequency, with a telephone backup, that would operate
on a new graphical software package to better tract water usage and water availability. The
proposal includes the acquisition of the additional computer hardware, software and
programming to install the system. This proposed system is specifically designed for water
system analysis and allows the flexibility to have status updates via pagers and to access the
system from various remote locations.
Staff recommends approval of Change Order #2 to install a new SCADA System and will be
available to answer any questions at the Council meeting.
CITY OF COPPELL, TEXAS
VILLAGE PARKWAY PUMP STATION ADDITION
PROJECT NO. WA-9302
BID NO. Ql195-02
CHANGE ORDER NO. 2
A. INTENT OF CHANGE ORDER
The intent of this change order is to modify the provisions of the contract entered into by the City of Coppell,
Texas and North Texas Municipal Construction, Inc., 5614 Dyer Street, Dallas, Texas 75206, for construction of
the Village Parkway Pump Station Addition, dated January 9, 1996.
B. DESCRIPTION OF CHANGE
1. This change order modifies the scope of work on this project by eliminating the Supervisory Control and
Data Acquisition (SCADA) system modifications as originally planed and providing for a completely new
SCADA system utilizing the Motorola Moscad remote terminal units with communication via split
frequency UHF 2 watt radios. The scada system shall operate on a new server computer furnished and
installed at the Village Parkway Pump Station using the Wonderware graphical software package and the
WIN 911/411 alarm software product. The attached letter proposal from Team Controls, Inc., dated July
11,1996, more specifically outlines the scope of work included in the new SCADA System.
2. Both parties hereby agree that the retainage for the scope of work included in the original construction
contract shall be reduced to no more than 1/2% or eliminated altogether once all original work items are
complete in accordance with the plans and specifications. The retainage for the additional SCADA work
identified by this Change Order No. 2 shall remain at 5% until the work is complete and the system in full
operation.
C. EFFECT OF CHANGE ON CONTRACT AMOUNT
This change will have the following affect on the final contract amount:
Original Revised Change Revised
Item Contract Contract Order Unit Contract
No. Description Units Quantity Quantity Price Amount
9 For Furnishing and Installing New SCADA L.S. 0 1 $194,208.00 $194,208.00
system, as outlined in the Letter Proposal from
Team Controls, Inc. and including overhead,
profit, insurance and bonds, complete in place
10 Additional electrical work at the Village L.S. 0 1 3,998.00 3,998.00
Parkway Pump Station required to complete
installation of new SCADA system, including
overhead, profit, insurance and bonds,
complete in place
11 Credit for elimination of SCADA components L.S. 0 1 (45,467.00) (45,467.00)
in original scope of work which is no longer
required, including overhead, profit, insurance
and bonds.
Total Amount of Change $152,739.00
Original Contract Amount $933,000.00
Amount, Change Order No. 1 (5,000.00)
Amount, Change Order No. 2 152,739.00
Revised Contract Amount $1,080,739.00
Pa~e 1 of 2 ,,
,. i -
D. EFFECT OF CHANGE ON CONTRACT TIME
The changes identified above has will add 60 calendar days to the original contract time.
Original Contract Time: 300 Calendar Days
Calendar Days, Change Order No. 1: 0 Calendar Days
Calendar Days, Change Order No. 2: 60 Calendar Days
Revised Contract Time: 360 Calendar Days
E. AGREEMENT
By the signatures below of duly authorized agents, the City of Coppell, Texas and North Texas Municipal
Construction Company, Inc., do hereby agree to append this Change Order No. 2 to the original contract
between themselves, dated January 9, 1996.
City of Coppell, Texas North Texas Municipal Construction Company, Inc.,
Owner Contractor
Date: ~~/~~75i% Date:
Aaest: ~ A~est:
Page 2 of 2
13' 17 21a2412895 TE~M CONTROLS, INC. PAGE
11359 Kline Dr. · Dallas, TX 75229 · 214-241-6051 ° FAX 214-241-2895
Jxlly 11, 1996
/
SltlNIEK, JACOBS & FINKLEA
8333 DOUGLAS AVE, SUITE #820
gALLAS, TEXAS 75225
A~t~tion: Mr. John Birkhoff
R~'ference: City of Coppell
Scada Upgrade Project
TEAM CONYROLS Letter #00711GDM l
]~ear John,
~e are pleased to submit this revised proposal to furnish products and services to upgrade
t~e City of CoppeWs scada system as described hereat~er.
SYSTEM DESCRIPTION
Pjroposed system shall utilize MOTOROLA MOSCAD remote terminal units and shall
c6mmunicate via split frequency UffF 2 watt radios. Remote terminal units shall be sized
a~d installed per the attached RTU I/O RECAP, Exhibit 'B'.
A: scada server computer shall be furnished and installed at the Village Parkway pump
sialion- This computer shall serve as the system primary host computer and shall be
famished with a run/development WONDERWARE graphical software package and the
WIN 911/411 alarm software product. One (1) portable laptop computer shall be
fijrnished for remote view and operation of the system. Ihe remote laptop computer shall
communicate to the primary scada server located at Village Parkway pump station via City.
p,i'ovided dial-up or dedicated phone lines. Proposed computer station products are
d~tailed on attached PROPOSED COMPUTER PRODUCTS. Exhibit "C" .
pROPOSED SERVICES
P.i'oposal if for a turn-key system including system design, license application assistance.
e~uipment installation, programming, start-up, training and warranty services. All services
shall be performed by factory trained TCI personnel. Furnishing and installation of the
chemical feed valve control panel is included in this proposal. Required modifications to
tl~e existing main instrument panel for pump control at Village Parkway pump station is
also included.
13:17 2142412885 TEAM CONTROLS, INC. PAGE 83
T~aining shall include a total of twenty-four (24) instructor manhours and will be
strumred to meet the City's particular needs and desires.
Warranty shall be for a period of one (1) year from system acceptance and include costs
f6r repair/replacement of equipment which is found to be defective due to a manufacturing
defect or improper workmanship. Damages as a result of acts of God (lightning, etc.) are
not covered by this warranty.
P~R. QPOSED SCHEDULE
Proposed schedule shall be as follows'.
· ! Complete submittals and FCC license application 3 weeks after receipt
of order
· Stage and execute FAT at TCI facility 6 weeks after receipt
of license
· : Complete installation, start-up and training 9 weeks al'ter receipt
of license
PROPOSAL PRICING AND TERMS
Pi'icing for the proposed system and services is $170,000.00. Invoicing shall be
progressive based on agreed to milestone events.
CLARIFICATIONS
Pi'oposal is based on the following clarifications:
· ': RTU sizing is based on the input/output requirements per attached Exhibit "B".
· '. RTU enclosures shall be factory standard 4 painted steel enclosures for outside
locations and nema 12 for indoor applications.
· ~ Pricing is based on utilizing 2 watt UHF radios and it is assumed that an FCC license
~ can be obtained for same.
· ' All sensors external of the proposed remote terminal units are assumed to be existing
and operational at the time of our installation. Costs for repair, replacement and/or
furnishing of any new sensors (if'any) are not included in this proposal and shall be in
addition to swne.
· Costs associated with obtaining and maintaining phone lines for the remote computer
shall be the City' s responsibility.
· Furnished reports shall bc limited to TCI standard daily, weekly and monthly reports,
Additional reports can be provided for additional costs.
· Bonding costs and/or sales t$xes are not included and shall be extra costs if required.
82'/89/1994 13:17 2142412895 TEAM CONTROLS, INC. PAGE
We are available to r~,iew this proposal at your convenience and trust that you shall not
h~sitate to call if there are any questions.
This proposal shall be valid for sixty (60) days from this date.
S~cerely,
2CONTROLS, INC.
~ D. McNiel
dDM/eaw
13:17 2142~12885 TEAM CONTROLS, INC. PAGE
CITY OF COIHmELL
SCADA SYSTEM
~ R~P
~Hl~
VILLAGE PARKVVAY (1} POWER FAIL 15) PUMP CONTROL I1] CALLA..S iNFLUENT (2) EST LEVEL 1> RTU TO INCLUDE
P~JMP STATION (1) INTRUSION (2) AIR SCRUBBER FLOW (2) SPARE DR~VER TO COM-
(BCADA SERVER LOCATION) (1) ENTRY SM/ITCH CONTROL (1)DtSCNPRESSLIRE MUNICATEWITM
(6) PUMP STATUS (8) SPARE (1) OlSCH FLOW WEST~. ~'~-1000
(6) PUMP HOA (;Z) GSR LEVEL dEVICES
(E.) PUMP FAIL (I) CL2 FEE(~ RATE
(2) AIR SCRUBBER (1] NH3 FEED RATE 2> NEW DISCHARGE
STATUS (1) AMMONIA SCALE PIT WiLL BE
(1) AMMONIA LEAK (1) CL2 SCALE ;:'R~.ViDED
(I) CL2 LEAK (I) CL2 ANALY'ZER
(4) SAMPLE VALVE (6) SPARE
I.,31 SPARE
(32) TOTAL (IS} TOTAL (16) TOTAL (4) TOTAL
EXISTING EST (I) POWER FAIL (1) VALVE OPEN (1) EST LEvE!.. FUTURE
('1) INTRUSION (1) VALVE CLOSE (1) CL2 ANALYZER
(I) ENTRY S'VVlTCH (2) SPA~E
(1} VALVE STATUS
{4.} SPARE
(e,} SPARE (4} TOTAL (2) TO'TA. FUTURE
N~,At EIT (1) POWER FAI',. (1) VALVE OPEN (1) EST LEVEL ;:UTUI~E
(1) INTRUSION (1) VALVE CLO~E (1) CL2 ANALYZER
(I) ENTRY S',NITCH (.2) SPARE
(1;. VALVE STATUS
(.4} SPARE
(8) SPARE (4] TOTAL (2) TOTAL ;UTURE
SANDY LAKE ('t) POWER FAIL {3] PUMP CONTROL (1) W/V'/LEVE~ FUTURE 1> NE'V~ ULTRA-
LIFT STATION {1) INTRUSION {~.} SPARE ('~} SPARE SONIC LtT WILL
(I) ENTRY SVVITCH BE PROVIDED
STATUS
(3'~ PUMP .STATUS
(1) DAN H~ L~"V~L
(1) WAN HI LI~'VEL
~SPARE
[8) TOTAL (.4) TOTAL (2) TOTAL FUTURE
DE FOREST (1) POWER FAIL ('3) PUMP CONTROL (1) W/W LEVEL fUTURE 1> Ni~A/ULTRA-.
LIFT STATION ( 1 ) INTRUSION ( 1 ) SPARE ( 1 ) SPARE 5ONIC LIT WILL
{1} ENTRY SWITCH BE PROVIDED
STATUS
(3) PUMI~ STATUS
(1) DAN HI LEVEL
(1) WAN HI LEVEL
(,I1 .SPARE
(8) TOTAL (4) TOTAL (2] TOTAL FUTURE
COI~EL2.XL5 PaRe ~ 7/1
· ~}27~]9/1994 13:17 21424128~5 TEAM CONTROLS, INC. PAGE
~1~ O~ OOPP~LL
PROPO~D
PRODUCTS
EXHIBIT "C"
LOCATED AT VILLAGE PARKWAY PUMP STATION
I SCADA SERVER OPERATOR WORKSTATION CONSISTING Of FOLLOWING:
(,1) GATEWAY P5-120 MHZ COMPUTER WITH 16ME RAM, 256K CACHE, (1) 1.2G8
HARD DRIVE, (1) 3.S" 1.44ME DISK DRIVE, 6X CD-ROM DRIVE, MOUSE AND
VIVITRON 17" MONITOR ( 15.7" VIEWABLE )
(1)ETHERNET & MODEM PRODUCTS
(1)MS OFFICE PRO FOR WINDOWS 95
(1)WIN-911/411 ALARM AND PAGING SOFTWARE
(1)WONDERWARE RUN TIME/DEVELOPMENT SCADA SERVER SOFTWARE
(1)BEST 750VA UPS
(1)HP LASER PRINTER MODEL $L
SERVICE WORKSTATION ( PORTABLE )
I PORTABLE VIEW NODE WORKSTATION CONSISTING OF THE FOLLOWING:
(1) GATEWAY P5-120 NOTEBOOK COMPUTER WITH 16MB RAM. 256K CACHE. (1)
1.2GB HARD DRIVE, (1) 3.5" 1.44MB DISK DRIVE, MOUSE AND MONITOR.
(1) ETHERNET & MODEM PRODUCTS
(1) MS OFFICE PRO FOR WINDOWS 95
(1) WONDERWARE RUN TIME ONLY SCADA SOFTWARE
COPPEL,q .XLS Page 1 7/11196
SHIMEK, JACOBS & FINKI,EA
CONSULTING ENGINEERS
8333 Douglas Avenue, #820 Dallas, Texas 75225 (214) 361-7900
ROSS L. JACOBS, P.E.
RONALD V. CONWAY, P.E.
JOHN W. BIRKHOFF, P.E.
JOE R. CARTER, P.E.
GARY C. HENDRICKS. P.E.
July 12, 1996
C. L. SHIMEK, P.E.
1. C. FINKLEA, P.E.
JAMES E. LAUGHLIN, P.E.
Mr. Kenneth M. Griffin, P.E.
Assistant City Manager/City Engineer
City of Coppell
Post Office Box 478
Coppell, Texas 75019
Re: Village Parkway Pump Station Additions
Change Order No. 2
Dear Mr. Griffin:
We are enclosing five copies of Change Order No. 2 to your contract with North Texas Municipal
Construction Co., for the construction of the Village Parkway Pump Station Additions, dated January 9, 1996.
These copies have been signed and dated by the contractor.
Change Order No. 2 eliminates the SCADA system modifications as originally planned for in the construction
contract, and provides for a completely new SCADA system, including radio communication. If Change
Order No. 2 is acceptable, please have all five copies executed by the City and return three to our office. We
will forward two copies to the contractor and retain one for our files.
We are available to discuss this project further at your convenience. S~ncere
'?'
Enclosure
cc: Mr. Matt Cast
SHIMEK, JACOBS & FINKLEA
CONSULTING ENGINEERS /7
FILE t/
FROM ~;, r~, ,/~ /D~- z~ DATE
* 1'35,
5c,',o,--'~ 6,,1 $~,,v~ ~L,s'r'o-~ ~ ''100
87/11/lc3_q6 '14:32 214361eL,~, SHIMEK,JACOBS? ,IKLE PAGE
vd F q?} 02
SHIMEK, JACOBS & FINKLEA
CONSULTING ENGINEERS
8333 DOUGLAS AVENUE, #820
DALLAS, TEXAS 75225
Fax Number: (214) 361-0204 Phone Number: (214)361-7900
Date: July 1 I, 1996 Receiving Fax Number'.
Number of Pages Transmit'ted (including this one)
Ken Griffin
Re; SCADA System Change Order
Message: Ken:
Team Controls agreed to reduce their price by $2,000 and North Texas Municipal Constrnction
agreed to an overhead and profit reduction to 12%, resulting in an overall change order reduction
of $6,437 from the numbers I gave you yesterday morning.
We are faxing you a change order description, effect of change on contract amount and contract
time for your use in preparing the change order. Since we have already prepared the first change
order, we went ahead and put it on our form~ You aze welcome to use this form if you like.
Please note that the pay items listed include the 12% overhead & profit and the 2% bonds for the
contractor. The bottom line number is $152,739.
From:
Gary C. Hendricks
If the number of pages called for are not received or are not clear please call (214) 361-7900.
CITY OF COPPELL, TEXAS
VILLAGE PARKWAY PUMP STATION ADDITION
PROJECT NO. WA-9302
BID NO. Ql195-02
CHANGE. ORDER No. 2
A. [gJY.,~T OF C,,HANGE ORDER
The intent of this change order is to modify the provisions of the contract entered into by the City of Coppell,
Texas and North Texas Municipal Construction, Inc., 5614 Dyer Street, Dallas, Texas 75206,for construction of
the Village Parkway Pump Station Addition, dated January 9, 1996.
B- DES_GRIPTLQN OF CHANGE
1. This change order modifies the scope of work on this project by eliminating the Supervisory Control and
Data Acquisition (SCADA) system modifications as originally planed and providing for a completely new'
SCADA system utilizing the Motorola Moscad remote terminal units ~vith communication via split
frequency UItF 2 watt radios. The seada system shall operate on a new server computer furnished and
installed at the Village Parkway Pump Station using the Wonderware graphieal software package and the
WTN 911/411 alarm software product. The attached letter proposal from Team Controls, inc., dated July
I 1,1996, more specifically outlines the scope of work included in the new SCADA System.
2. Both parties hereby agree that the retainage for the scope of work included in the original construction
contract shall be reduced to no more than 1/2% or eliminated altogether once all original work items are
complete in accordance with the plans and specifications. The retainage for the additional SCADA work
identified by this Change Order No. 2 shall remain at 5% until the work is complete and the system in full
operation.
C. EFFECT OF CHANGE ON CONTRACI_AMOUN~[
This change will have the following affect on the final contract amount:
" Origih'~] ..... 'Revised Change Revised
Item Contract Contract Order Unit Contract
No, Description Units Quantity Quantity Price Amoun~
9 For Furnishing and Installing New SCADA L.S. 0 1 $194,208..00 $194,208.00
system, as outlined in the Letter Proposal from
'ream Conl~ols, Inc. and including overhead,
_ pro~t~ insurance and bonds, comple~_'m place
10 Additional electrical work at the Village L.S. 0 1 [ 3,998.00 3,998.00
Parkway Pump Station required to complete
installation of new SCADA system, including
overhead, profit, insurance and bonds,
____ co_!.O.g~e, ke. i.n plnge
11 Credit for elimination of SCADA components L.S. 0 1 (45,467.00) (45,4~57.00)
in original scope of work which is no longer
required, including overhead, profit, insurance
and bonds.
.__ Total Amount of Change t $152~739.0__0
Original Contract Amount $933,000.00
Amount, Change Order No. 1 (5,000.00)
Amount, Change Order No. 2 ____L~.152739.00
Page 1 of 2
Revised Contract Amount $1,080,739.00
D. F. XFECT OF CHANGE ON CONTRAC.T TIME
The changes identified above has will add 60 calendar days to the original contract time.
Original Contract Time: 300 Calendar Days
Calendar Days, Change Order No. 1: 0 Calendar Days
Calendar Days, Change Order No. 2: 60 Calendar Day~
Revised Contract Time: 360 Calendar Days
By the signatures below of duly authorized agents, the City of Coppelt, Texas and North Texas Municipal
Construction Company, Ine., do hereby agree to append this Change Order No. 2 to the original contract
bet~veen ~lemselves, dated January 9, 1996.
City of Coppeil, Texas North Texas Municipal Construction Company, Inc.,
Owner Contractor
By: By:
D ate: Date:
Attest: Attest:
Pa~e 2 of 2
8~/11/1996 14:32 2143618284 SHIHEK,JACOBS&FINKLE PAGE 84/89
82/~9/199d 13:17 ~i424:L35 TEAM CONI'~UL5 '4U. M~ oi
F~,,x TR,&N~IMrrTAL
Office Number, 214-.241-6051
Fax Number, 214-241-2895
Ciate:_ 7-" !-,~. ~' Time:
Company:
Total # of pages
A~entlen: ~R.,~-.~ ,~.~,.~.~r~,~..../~_~__~ ~:r~,~.~,~.~ being sent ~--~ ,- _
/ ¢nclud~ng Cove'~ Sheet)
Fax Nu~en
tf you do not re<:eive all ~e pages, prease contact aender ASAP!
e~/11/199G 14:32 2143Gle284 SHIMEK,J~COBS&FINKLE PAGE
02/~g/lS~ 13:17 2142d~Lt5 TE~M ~UNTROLS
t 1359 Kline Dr, · Dalli~s, TX 75229 · 21 4-241 -~051 · FAX 214-241 -~595
11. 1996
SitlMEK, JACOBS & FINKJ.,EA
8.t33 DOUGLAS AVE, SUITE #820
E ALLAS, TEXAS ~5225
Attention: Mr John Birlchoff
g florence: City of Coppell
Scada Upgrade Project
TEAM CONTROLS Letter #00711GDMI
I:~ar ~ohn,
Vire are pleased to ~ubmit this revised proposal to furnish products and services to upgrade
tl~c City ofCoppe!l's scada system as described hereafter,
SYSTEM; DE~CltlPTION
P~oposed system shall utilize MOTOROLA MOSCAD remote terminal units and shall
cbmmunicate via split frequency LrHY 2 watt radios Remote terminal units shall be si~ed
ed~d installed per the attached RTU I/O RECAP, Exhibit 'B '.
A scada sewer computer shall be furnished and installed at the village Parkway pump
sl~tion This computer shall serve as the system primary host computer and shall be
~mished with a run/development WONDERWARE graphice~l software package and the
WIN 911/411 alarm software product, One (1) portable laptop computer shall be
filmshed for remote view and operation of the system. The remote laptop computer shall
cbmmurdcate to the primary ~cada server located at Village Parkway pump station via City
p!'ovided dial-up or dedicated phone lines- Proposed computer station products are
d~ailed on attached PROPOSED COMPUTER PRODUCTS, Exhibit
pROPOSED SERVICES
P~oposal if fbr a turn-key system including system design, license application assistance.
e~uipment installation, programming, start-up, training and warranty services. AjI services
slhll be perfx>rmed by factory trained TCI personnel. Furnishing ~nd installation of the
chemical feed valve control panel is included in this proposal Required modifications to
tPhe existing main instrument panel for pump control at Village Parkway pump station is
~ included.
;
8'7/11/1996 14:32 2143818284 SHZMEK,JACOBS&FZNKLE PAGE 88/89
82/09/1994 13:17 21~d'LL..~5 TE~M CUNINUL~ N~j. ~ ~
Ti'aining shall include a total of twenty-four (24) instructor manhours and will be
structured to meet the City's particular needs and desires.
Warntory shall be for a period of one (1) year from system acceptance and include costs
for repair/replacement of equipment whSch is found to be defective due to a manufacturing
defect or improper workmanship. Damages as a resuIt of acts of God (lightning, c~c.) are
net covered by this warranty.
PROPOSED SCHEDULE
Proposed schedule shall be as follows'.
*! Complete submittals and FCC license application 3 weeks after receipt
of order
~ Stage and execute FAT at TCI facility 6 weeks after receipt
of license
e Complete installatiot% start*up and training 9 weeks after receipt
or license
PROPOSAL PKICING AND TEKMS
Phcing for the proposed system and services is $170,000.00 Invoicing shall be
progrog:five based on agreed to milestone events.
CLARIFICATIONS
Proposal is based on the following clarifications:
~. RTU sizing is based on the input/output requirements per attached Ex. hibi: "B".
, RTU enclosures shall be factory standard 4 painted steel enclosures for outside
locations and nema 12 for indoor applications
,,' Pricing is based on utilizing 2 watt UHI: radios and it is assumed that an FCC license
: can be obtained for same.
All sensors external of the proposed remote terminal units are assumed to be ~xisting
and operational at the time of our installation. Costs for repair, replacement and/or
furnishing of any new sensors (if any) are not included in this proposal and shall be in
addition 1o saJ'ne
, Costs associated with obtaining anti maintaining phone lines for the remote computer
shall be the City's responsibility.
, Furnished reports shall be limited to TCI standard daily, weekly and monthly reports.
Additional reports can be provided for additional costs.
* Bonding costs and/or sales taxes are not included and shall be extra costs if required
~2/~9/I~9~ 18:~7 21~2~L~ TEAM CONTROLS NC. PAGE
We are av~ilable to r~,iew tl~is proposal at your convenience and trust that you shall not
h4ssitate to call if there are any questions,
This proposal shall be valid for sixty (60) days from this date,
S.[ncerely,
C!ary D, McNiel
~DM/~aw
D2/'FJg/Igcj4 13:17 21,42a',,L,'cj5 TE~M CONTROLS NC. PAGE
CITY OF OOiH~LL
Exhibit "B"
VILLAGE PARK"vtv'AY (I} PC)WER FAIL (e) PUMI~ CONTROL CI
P~MP GTATION (l) ~NTRU$1ON (2) AIR SCRUBBE~ FL~ {;) SPARE DR~VER TO COM-
(6) PUMP STAT~$ (8) SPARE {~) DISCH FLOW WEST~ IC-lO0O
(6) PUMP ~AiL (1) CLZ FEEO RAIE
(~) ~sR SCRUB~R (1] N~3 FEED RATE ~> N~ DLEC~RGE
STATUS (1~ AMMONIA 5CAL~ Pl~ WILL BE
(1) AMMONIA L~ (1) GLZ $CALE ~RDVIOEO
(I) CL2 L~K (1) CL2 ANAL~E~
(11 ~MPLE VALVE (e)
(3~) TOTAL { 16} TOTAL ( q G) ] OT~L (~ > TO~AL
~ISTING E$~ (~) P~ER FAIL (1) V~LVE OPEN (1> EST LEVEL ~UTURE
(I) ENTRY ~ITCH (2) SPARE
(~) VAL~ STAT~$
~a} 3P~RE
(8) SPARE ~4~ '~L (2) T~TAL FUTURE
N~ E~T (1) ~WER ~1~ (1) VALVE OPEN
(1) INTRUSION (1) VALVE CLOSE (~) eL2 AN~LY~ER
(I) ENTRY ~ITCH (2) SPARE
~I) V~L~ 5TATU3
(4~ SPARE
(e) ~pAff~ (4] TOTAL (~) TOTA~ =UYU~E
~N'DY L~KE (~) POWER ~AIL (3) p~Mp CONTROL (~) W~ L~E~ FUTURE 1> N~ ULTRA-
LlFl STATION (1) INTRUSION (1} ~PA~ (I~ ~pA~E 5;N~G ~LT WILL
(~) ENTRY ~ITCH BE F,ROV~EO
~TATU$
(3) PUMP ~ATUS
(1) W~ HI
~SPARE
(8) TOTAL ;4) TOTAL (2) TOTAL FUTURE
~ F~T [~] POWER FAIL ~3) PUMP CONTROL (I) W~ L~EL ~UT~RE ~} N~ ULTRA~
LIFT ~TATICN (t) INTRL~ION (1) 5~RE (l~ SPI~E SONIC LII WILL
{11 ENTRY SWITCH ~ ~IDED
5TITU~
(3) PUMP STATUS
(~) D~ Hi L~L
(I) W~ HI L~L
{6) TOTAL .... (4) TOTAL .........
82/~9/199~ 13; 17 2142,~ J..,'~95 TE,~f4 CONTROLE NC. P~GE
CITY OF COPPELt.
PROPOSED COMPUTER
PRODUCTS
EXHIBIT "C"
LOCATED AT VILLAGE PARKWAY PUMP STATION
I SCADA .~ERVER OPERATOR WORKSTATION CONSISTING OF FOLLOWING;
(I) GATEWAY P5-120 MHZ COMPUTER WITH 15MR RAM. 256K CACHE, (1) 1.2GB
HARD DRIVE, (1) 3.5" 1.44MR DISK DRIVE, 6X CD-ROM DRIVE, MOUSE AND
VIVITRON 17' MONITOR ( 15.7" VIEWABLE )
(1) ETHERNET & MODEM PRODUCTS
(1) MS OFFICE PRO FOR WINDOWS 9S
(1) WIN-911/411 ALARM AND PAGING SOFTWARE
(1) WONDERWARE RUN TIME/DEVELOPMENT SCADA SERVER SOFTWARE
(1) BEST 750VA UPS
(1) HP LASER PRINTER MODEL 5L
SERVICE WORKSTATION ( PORTABLE )
I PORTABLE VIEW NODE WORKSTATION CONSISTING OF THE FOLLOWING-
(1) GATEWAY P5-1;0 NOTEBOOK COMPUTER WITH 16MR RAM. 2S6K CACHE. (1)
1.2GB HARD DRIVE, (1) 3.5" 1.44MR DISK DRIVE, MOUSE AND MONITOR.
(1) ETHERNET & MODEM PRODUCTS
(1) MS OFFICE PRO FOR WINDOWS 95
(1) WONDERWARE RUN TIME ONLY SCADA SOFTWARF
COPPEL~ ,XLS Page 1 711 1/95