WA9302A-CN 960723 ' "' "~Z~ m AGENDA REQUEST FORM ~With I Future CITY COUNCIL MEETING: July 23, 1996 ITIm # ~ Consider approv~ or Change Order #2 to the Village Parkway ~mp Station Addition ~oject ~ WA 93-02 in the mount or $152,739.00 rot a new Supervisory Control ~d Data Acquisition (SCADA) System and author~e the Ma~or to sign. A P, qq 0 /ED BY ~'ZiYY COUNCIL TITLE: ACM/CiIy Engineer INITIALS __~ STAFF COI~IENTS: See attached memo. STAFF RECOMMENDATION Approval X Denial EXPLANATION: Staff willbe availableto answer any questionsatthe Council meeting. BUDGET AMT. $ AMT. EST. $ +/- BUD: $ FINANCIAL COMMENTS: Funds are available in the Water/Sewer CIP Accounts. FINANCIAL REVIEW~ CITY MANAGER REVIEW Agenda Request Form - Revised 1194 Document Name 5.eng MEMORANDUM To: Mayor and City Council From: Kenneth M. Griffin, P.E., ACM/City Engineer ~ lIE: Consider approval of Change Order #2 to the Village Parkway Pump Station Addition Project # WA 93-02 in the amount of $152,739.00 for a new Supervisory Control and Data Acquisition (SCADA) System and authorize the Mayor to sign. Date: July 15, 1996 During the construction at the Village Parkway Pump Station to add additional pumping capabilities to the system, the City has been evaluating its existing SCADA System. Because there have been some problems with the current SCADA System when there are glitches with the telephone lines, the City is requesting approval of a Change Order to install a new SCADA System that would operate on a radio frequency, with a telephone backup, that would operate on a new graphical software package to better tract water usage and water availability. The proposal includes the acquisition of the additional computer hardware, software and programming to install the system. This proposed system is specifically designed for water system analysis and allows the flexibility to have status updates via pagers and to access the system from various remote locations. Staff recommends approval of Change Order #2 to install a new SCADA System and will be available to answer any questions at the Council meeting. CITY OF COPPELL, TEXAS VILLAGE PARKWAY PUMP STATION ADDITION PROJECT NO. WA-9302 BID NO. Ql195-02 CHANGE ORDER NO. 2 A. INTENT OF CHANGE ORDER The intent of this change order is to modify the provisions of the contract entered into by the City of Coppell, Texas and North Texas Municipal Construction, Inc., 5614 Dyer Street, Dallas, Texas 75206, for construction of the Village Parkway Pump Station Addition, dated January 9, 1996. B. DESCRIPTION OF CHANGE 1. This change order modifies the scope of work on this project by eliminating the Supervisory Control and Data Acquisition (SCADA) system modifications as originally planed and providing for a completely new SCADA system utilizing the Motorola Moscad remote terminal units with communication via split frequency UHF 2 watt radios. The scada system shall operate on a new server computer furnished and installed at the Village Parkway Pump Station using the Wonderware graphical software package and the WIN 911/411 alarm software product. The attached letter proposal from Team Controls, Inc., dated July 11,1996, more specifically outlines the scope of work included in the new SCADA System. 2. Both parties hereby agree that the retainage for the scope of work included in the original construction contract shall be reduced to no more than 1/2% or eliminated altogether once all original work items are complete in accordance with the plans and specifications. The retainage for the additional SCADA work identified by this Change Order No. 2 shall remain at 5% until the work is complete and the system in full operation. C. EFFECT OF CHANGE ON CONTRACT AMOUNT This change will have the following affect on the final contract amount: Original Revised Change Revised Item Contract Contract Order Unit Contract No. Description Units Quantity Quantity Price Amount 9 For Furnishing and Installing New SCADA L.S. 0 1 $194,208.00 $194,208.00 system, as outlined in the Letter Proposal from Team Controls, Inc. and including overhead, profit, insurance and bonds, complete in place 10 Additional electrical work at the Village L.S. 0 1 3,998.00 3,998.00 Parkway Pump Station required to complete installation of new SCADA system, including overhead, profit, insurance and bonds, complete in place 11 Credit for elimination of SCADA components L.S. 0 1 (45,467.00) (45,467.00) in original scope of work which is no longer required, including overhead, profit, insurance and bonds. Total Amount of Change $152,739.00 Original Contract Amount $933,000.00 Amount, Change Order No. 1 (5,000.00) Amount, Change Order No. 2 152,739.00 Revised Contract Amount $1,080,739.00 Pa~e 1 of 2 ,, ,. i - D. EFFECT OF CHANGE ON CONTRACT TIME The changes identified above has will add 60 calendar days to the original contract time. Original Contract Time: 300 Calendar Days Calendar Days, Change Order No. 1: 0 Calendar Days Calendar Days, Change Order No. 2: 60 Calendar Days Revised Contract Time: 360 Calendar Days E. AGREEMENT By the signatures below of duly authorized agents, the City of Coppell, Texas and North Texas Municipal Construction Company, Inc., do hereby agree to append this Change Order No. 2 to the original contract between themselves, dated January 9, 1996. City of Coppell, Texas North Texas Municipal Construction Company, Inc., Owner Contractor Date: ~~/~~75i% Date: Aaest: ~ A~est: Page 2 of 2 13' 17 21a2412895 TE~M CONTROLS, INC. PAGE 11359 Kline Dr. · Dallas, TX 75229 · 214-241-6051 ° FAX 214-241-2895 Jxlly 11, 1996 / SltlNIEK, JACOBS & FINKLEA 8333 DOUGLAS AVE, SUITE #820 gALLAS, TEXAS 75225 A~t~tion: Mr. John Birkhoff R~'ference: City of Coppell Scada Upgrade Project TEAM CONYROLS Letter #00711GDM l ]~ear John, ~e are pleased to submit this revised proposal to furnish products and services to upgrade t~e City of CoppeWs scada system as described hereat~er. SYSTEM DESCRIPTION Pjroposed system shall utilize MOTOROLA MOSCAD remote terminal units and shall c6mmunicate via split frequency UffF 2 watt radios. Remote terminal units shall be sized a~d installed per the attached RTU I/O RECAP, Exhibit 'B'. A: scada server computer shall be furnished and installed at the Village Parkway pump sialion- This computer shall serve as the system primary host computer and shall be famished with a run/development WONDERWARE graphical software package and the WIN 911/411 alarm software product. One (1) portable laptop computer shall be fijrnished for remote view and operation of the system. Ihe remote laptop computer shall communicate to the primary scada server located at Village Parkway pump station via City. p,i'ovided dial-up or dedicated phone lines. Proposed computer station products are d~tailed on attached PROPOSED COMPUTER PRODUCTS. Exhibit "C" . pROPOSED SERVICES P.i'oposal if for a turn-key system including system design, license application assistance. e~uipment installation, programming, start-up, training and warranty services. All services shall be performed by factory trained TCI personnel. Furnishing and installation of the chemical feed valve control panel is included in this proposal. Required modifications to tl~e existing main instrument panel for pump control at Village Parkway pump station is also included. 13:17 2142412885 TEAM CONTROLS, INC. PAGE 83 T~aining shall include a total of twenty-four (24) instructor manhours and will be strumred to meet the City's particular needs and desires. Warranty shall be for a period of one (1) year from system acceptance and include costs f6r repair/replacement of equipment which is found to be defective due to a manufacturing defect or improper workmanship. Damages as a result of acts of God (lightning, etc.) are not covered by this warranty. P~R. QPOSED SCHEDULE Proposed schedule shall be as follows'. · ! Complete submittals and FCC license application 3 weeks after receipt of order · Stage and execute FAT at TCI facility 6 weeks after receipt of license · : Complete installation, start-up and training 9 weeks al'ter receipt of license PROPOSAL PRICING AND TERMS Pi'icing for the proposed system and services is $170,000.00. Invoicing shall be progressive based on agreed to milestone events. CLARIFICATIONS Pi'oposal is based on the following clarifications: · ': RTU sizing is based on the input/output requirements per attached Exhibit "B". · '. RTU enclosures shall be factory standard 4 painted steel enclosures for outside locations and nema 12 for indoor applications. · ~ Pricing is based on utilizing 2 watt UHF radios and it is assumed that an FCC license ~ can be obtained for same. · ' All sensors external of the proposed remote terminal units are assumed to be existing and operational at the time of our installation. Costs for repair, replacement and/or furnishing of any new sensors (if'any) are not included in this proposal and shall be in addition to swne. · Costs associated with obtaining and maintaining phone lines for the remote computer shall be the City' s responsibility. · Furnished reports shall bc limited to TCI standard daily, weekly and monthly reports, Additional reports can be provided for additional costs. · Bonding costs and/or sales t$xes are not included and shall be extra costs if required. 82'/89/1994 13:17 2142412895 TEAM CONTROLS, INC. PAGE We are available to r~,iew this proposal at your convenience and trust that you shall not h~sitate to call if there are any questions. This proposal shall be valid for sixty (60) days from this date. S~cerely, 2CONTROLS, INC. ~ D. McNiel dDM/eaw 13:17 2142~12885 TEAM CONTROLS, INC. PAGE CITY OF COIHmELL SCADA SYSTEM ~ R~P ~Hl~ VILLAGE PARKVVAY (1} POWER FAIL 15) PUMP CONTROL I1] CALLA..S iNFLUENT (2) EST LEVEL 1> RTU TO INCLUDE P~JMP STATION (1) INTRUSION (2) AIR SCRUBBER FLOW (2) SPARE DR~VER TO COM- (BCADA SERVER LOCATION) (1) ENTRY SM/ITCH CONTROL (1)DtSCNPRESSLIRE MUNICATEWITM (6) PUMP STATUS (8) SPARE (1) OlSCH FLOW WEST~. ~'~-1000 (6) PUMP HOA (;Z) GSR LEVEL dEVICES (E.) PUMP FAIL (I) CL2 FEE(~ RATE (2) AIR SCRUBBER (1] NH3 FEED RATE 2> NEW DISCHARGE STATUS (1) AMMONIA SCALE PIT WiLL BE (1) AMMONIA LEAK (1) CL2 SCALE ;:'R~.ViDED (I) CL2 LEAK (I) CL2 ANALY'ZER (4) SAMPLE VALVE (6) SPARE I.,31 SPARE (32) TOTAL (IS} TOTAL (16) TOTAL (4) TOTAL EXISTING EST (I) POWER FAIL (1) VALVE OPEN (1) EST LEvE!.. FUTURE ('1) INTRUSION (1) VALVE CLOSE (1) CL2 ANALYZER (I) ENTRY S'VVlTCH (2) SPA~E (1} VALVE STATUS {4.} SPARE (e,} SPARE (4} TOTAL (2) TO'TA. FUTURE N~,At EIT (1) POWER FAI',. (1) VALVE OPEN (1) EST LEVEL ;:UTUI~E (1) INTRUSION (1) VALVE CLO~E (1) CL2 ANALYZER (I) ENTRY S',NITCH (.2) SPARE (1;. VALVE STATUS (.4} SPARE (8) SPARE (4] TOTAL (2) TOTAL ;UTURE SANDY LAKE ('t) POWER FAIL {3] PUMP CONTROL (1) W/V'/LEVE~ FUTURE 1> NE'V~ ULTRA- LIFT STATION {1) INTRUSION {~.} SPARE ('~} SPARE SONIC LtT WILL (I) ENTRY SVVITCH BE PROVIDED STATUS (3'~ PUMP .STATUS (1) DAN H~ L~"V~L (1) WAN HI LI~'VEL ~SPARE [8) TOTAL (.4) TOTAL (2) TOTAL FUTURE DE FOREST (1) POWER FAIL ('3) PUMP CONTROL (1) W/W LEVEL fUTURE 1> Ni~A/ULTRA-. LIFT STATION ( 1 ) INTRUSION ( 1 ) SPARE ( 1 ) SPARE 5ONIC LIT WILL {1} ENTRY SWITCH BE PROVIDED STATUS (3) PUMI~ STATUS (1) DAN HI LEVEL (1) WAN HI LEVEL (,I1 .SPARE (8) TOTAL (4) TOTAL (2] TOTAL FUTURE COI~EL2.XL5 PaRe ~ 7/1 · ~}27~]9/1994 13:17 21424128~5 TEAM CONTROLS, INC. PAGE ~1~ O~ OOPP~LL PROPO~D PRODUCTS EXHIBIT "C" LOCATED AT VILLAGE PARKWAY PUMP STATION I SCADA SERVER OPERATOR WORKSTATION CONSISTING Of FOLLOWING: (,1) GATEWAY P5-120 MHZ COMPUTER WITH 16ME RAM, 256K CACHE, (1) 1.2G8 HARD DRIVE, (1) 3.S" 1.44ME DISK DRIVE, 6X CD-ROM DRIVE, MOUSE AND VIVITRON 17" MONITOR ( 15.7" VIEWABLE ) (1)ETHERNET & MODEM PRODUCTS (1)MS OFFICE PRO FOR WINDOWS 95 (1)WIN-911/411 ALARM AND PAGING SOFTWARE (1)WONDERWARE RUN TIME/DEVELOPMENT SCADA SERVER SOFTWARE (1)BEST 750VA UPS (1)HP LASER PRINTER MODEL $L SERVICE WORKSTATION ( PORTABLE ) I PORTABLE VIEW NODE WORKSTATION CONSISTING OF THE FOLLOWING: (1) GATEWAY P5-120 NOTEBOOK COMPUTER WITH 16MB RAM. 256K CACHE. (1) 1.2GB HARD DRIVE, (1) 3.5" 1.44MB DISK DRIVE, MOUSE AND MONITOR. (1) ETHERNET & MODEM PRODUCTS (1) MS OFFICE PRO FOR WINDOWS 95 (1) WONDERWARE RUN TIME ONLY SCADA SOFTWARE COPPEL,q .XLS Page 1 7/11196 SHIMEK, JACOBS & FINKI,EA CONSULTING ENGINEERS 8333 Douglas Avenue, #820 Dallas, Texas 75225 (214) 361-7900 ROSS L. JACOBS, P.E. RONALD V. CONWAY, P.E. JOHN W. BIRKHOFF, P.E. JOE R. CARTER, P.E. GARY C. HENDRICKS. P.E. July 12, 1996 C. L. SHIMEK, P.E. 1. C. FINKLEA, P.E. JAMES E. LAUGHLIN, P.E. Mr. Kenneth M. Griffin, P.E. Assistant City Manager/City Engineer City of Coppell Post Office Box 478 Coppell, Texas 75019 Re: Village Parkway Pump Station Additions Change Order No. 2 Dear Mr. Griffin: We are enclosing five copies of Change Order No. 2 to your contract with North Texas Municipal Construction Co., for the construction of the Village Parkway Pump Station Additions, dated January 9, 1996. These copies have been signed and dated by the contractor. Change Order No. 2 eliminates the SCADA system modifications as originally planned for in the construction contract, and provides for a completely new SCADA system, including radio communication. If Change Order No. 2 is acceptable, please have all five copies executed by the City and return three to our office. We will forward two copies to the contractor and retain one for our files. We are available to discuss this project further at your convenience. S~ncere '?' Enclosure cc: Mr. Matt Cast SHIMEK, JACOBS & FINKLEA CONSULTING ENGINEERS /7 FILE t/ FROM ~;, r~, ,/~ /D~- z~ DATE * 1'35, 5c,',o,--'~ 6,,1 $~,,v~ ~L,s'r'o-~ ~ ''100 87/11/lc3_q6 '14:32 214361eL,~, SHIMEK,JACOBS? ,IKLE PAGE vd F q?} 02 SHIMEK, JACOBS & FINKLEA CONSULTING ENGINEERS 8333 DOUGLAS AVENUE, #820 DALLAS, TEXAS 75225 Fax Number: (214) 361-0204 Phone Number: (214)361-7900 Date: July 1 I, 1996 Receiving Fax Number'. Number of Pages Transmit'ted (including this one) Ken Griffin Re; SCADA System Change Order Message: Ken: Team Controls agreed to reduce their price by $2,000 and North Texas Municipal Constrnction agreed to an overhead and profit reduction to 12%, resulting in an overall change order reduction of $6,437 from the numbers I gave you yesterday morning. We are faxing you a change order description, effect of change on contract amount and contract time for your use in preparing the change order. Since we have already prepared the first change order, we went ahead and put it on our form~ You aze welcome to use this form if you like. Please note that the pay items listed include the 12% overhead & profit and the 2% bonds for the contractor. The bottom line number is $152,739. From: Gary C. Hendricks If the number of pages called for are not received or are not clear please call (214) 361-7900. CITY OF COPPELL, TEXAS VILLAGE PARKWAY PUMP STATION ADDITION PROJECT NO. WA-9302 BID NO. Ql195-02 CHANGE. ORDER No. 2 A. [gJY.,~T OF C,,HANGE ORDER The intent of this change order is to modify the provisions of the contract entered into by the City of Coppell, Texas and North Texas Municipal Construction, Inc., 5614 Dyer Street, Dallas, Texas 75206,for construction of the Village Parkway Pump Station Addition, dated January 9, 1996. B- DES_GRIPTLQN OF CHANGE 1. This change order modifies the scope of work on this project by eliminating the Supervisory Control and Data Acquisition (SCADA) system modifications as originally planed and providing for a completely new' SCADA system utilizing the Motorola Moscad remote terminal units ~vith communication via split frequency UItF 2 watt radios. The seada system shall operate on a new server computer furnished and installed at the Village Parkway Pump Station using the Wonderware graphieal software package and the WTN 911/411 alarm software product. The attached letter proposal from Team Controls, inc., dated July I 1,1996, more specifically outlines the scope of work included in the new SCADA System. 2. Both parties hereby agree that the retainage for the scope of work included in the original construction contract shall be reduced to no more than 1/2% or eliminated altogether once all original work items are complete in accordance with the plans and specifications. The retainage for the additional SCADA work identified by this Change Order No. 2 shall remain at 5% until the work is complete and the system in full operation. C. EFFECT OF CHANGE ON CONTRACI_AMOUN~[ This change will have the following affect on the final contract amount: " Origih'~] ..... 'Revised Change Revised Item Contract Contract Order Unit Contract No, Description Units Quantity Quantity Price Amoun~ 9 For Furnishing and Installing New SCADA L.S. 0 1 $194,208..00 $194,208.00 system, as outlined in the Letter Proposal from 'ream Conl~ols, Inc. and including overhead, _ pro~t~ insurance and bonds, comple~_'m place 10 Additional electrical work at the Village L.S. 0 1 [ 3,998.00 3,998.00 Parkway Pump Station required to complete installation of new SCADA system, including overhead, profit, insurance and bonds, ____ co_!.O.g~e, ke. i.n plnge 11 Credit for elimination of SCADA components L.S. 0 1 (45,467.00) (45,4~57.00) in original scope of work which is no longer required, including overhead, profit, insurance and bonds. .__ Total Amount of Change t $152~739.0__0 Original Contract Amount $933,000.00 Amount, Change Order No. 1 (5,000.00) Amount, Change Order No. 2 ____L~.152739.00 Page 1 of 2 Revised Contract Amount $1,080,739.00 D. F. XFECT OF CHANGE ON CONTRAC.T TIME The changes identified above has will add 60 calendar days to the original contract time. Original Contract Time: 300 Calendar Days Calendar Days, Change Order No. 1: 0 Calendar Days Calendar Days, Change Order No. 2: 60 Calendar Day~ Revised Contract Time: 360 Calendar Days By the signatures below of duly authorized agents, the City of Coppelt, Texas and North Texas Municipal Construction Company, Ine., do hereby agree to append this Change Order No. 2 to the original contract bet~veen ~lemselves, dated January 9, 1996. City of Coppeil, Texas North Texas Municipal Construction Company, Inc., Owner Contractor By: By: D ate: Date: Attest: Attest: Pa~e 2 of 2 8~/11/1996 14:32 2143618284 SHIHEK,JACOBS&FINKLE PAGE 84/89 82/~9/199d 13:17 ~i424:L35 TEAM CONI'~UL5 '4U. M~ oi  F~,,x TR,&N~IMrrTAL Office Number, 214-.241-6051 Fax Number, 214-241-2895 Ciate:_ 7-" !-,~. ~' Time: Company: Total # of pages A~entlen: ~R.,~-.~ ,~.~,.~.~r~,~..../~_~__~ ~:r~,~.~,~.~ being sent ~--~ ,- _ / ¢nclud~ng Cove'~ Sheet) Fax Nu~en tf you do not re<:eive all ~e pages, prease contact aender ASAP! e~/11/199G 14:32 2143Gle284 SHIMEK,J~COBS&FINKLE PAGE 02/~g/lS~ 13:17 2142d~Lt5 TE~M ~UNTROLS t 1359 Kline Dr, · Dalli~s, TX 75229 · 21 4-241 -~051 · FAX 214-241 -~595 11. 1996 SitlMEK, JACOBS & FINKJ.,EA 8.t33 DOUGLAS AVE, SUITE #820 E ALLAS, TEXAS ~5225 Attention: Mr John Birlchoff g florence: City of Coppell Scada Upgrade Project TEAM CONTROLS Letter #00711GDMI I:~ar ~ohn, Vire are pleased to ~ubmit this revised proposal to furnish products and services to upgrade tl~c City ofCoppe!l's scada system as described hereafter, SYSTEM; DE~CltlPTION P~oposed system shall utilize MOTOROLA MOSCAD remote terminal units and shall cbmmunicate via split frequency LrHY 2 watt radios Remote terminal units shall be si~ed ed~d installed per the attached RTU I/O RECAP, Exhibit 'B '. A scada sewer computer shall be furnished and installed at the village Parkway pump sl~tion This computer shall serve as the system primary host computer and shall be ~mished with a run/development WONDERWARE graphice~l software package and the WIN 911/411 alarm software product, One (1) portable laptop computer shall be filmshed for remote view and operation of the system. The remote laptop computer shall cbmmurdcate to the primary ~cada server located at Village Parkway pump station via City p!'ovided dial-up or dedicated phone lines- Proposed computer station products are d~ailed on attached PROPOSED COMPUTER PRODUCTS, Exhibit pROPOSED SERVICES P~oposal if fbr a turn-key system including system design, license application assistance. e~uipment installation, programming, start-up, training and warranty services. AjI services slhll be perfx>rmed by factory trained TCI personnel. Furnishing ~nd installation of the chemical feed valve control panel is included in this proposal Required modifications to tPhe existing main instrument panel for pump control at Village Parkway pump station is ~ included. ; 8'7/11/1996 14:32 2143818284 SHZMEK,JACOBS&FZNKLE PAGE 88/89 82/09/1994 13:17 21~d'LL..~5 TE~M CUNINUL~ N~j. ~ ~ Ti'aining shall include a total of twenty-four (24) instructor manhours and will be structured to meet the City's particular needs and desires. Warntory shall be for a period of one (1) year from system acceptance and include costs for repair/replacement of equipment whSch is found to be defective due to a manufacturing defect or improper workmanship. Damages as a resuIt of acts of God (lightning, c~c.) are net covered by this warranty. PROPOSED SCHEDULE Proposed schedule shall be as follows'. *! Complete submittals and FCC license application 3 weeks after receipt of order ~ Stage and execute FAT at TCI facility 6 weeks after receipt of license e Complete installatiot% start*up and training 9 weeks after receipt or license PROPOSAL PKICING AND TEKMS Phcing for the proposed system and services is $170,000.00 Invoicing shall be progrog:five based on agreed to milestone events. CLARIFICATIONS Proposal is based on the following clarifications: ~. RTU sizing is based on the input/output requirements per attached Ex. hibi: "B". , RTU enclosures shall be factory standard 4 painted steel enclosures for outside locations and nema 12 for indoor applications ,,' Pricing is based on utilizing 2 watt UHI: radios and it is assumed that an FCC license : can be obtained for same. All sensors external of the proposed remote terminal units are assumed to be ~xisting and operational at the time of our installation. Costs for repair, replacement and/or furnishing of any new sensors (if any) are not included in this proposal and shall be in addition 1o saJ'ne , Costs associated with obtaining anti maintaining phone lines for the remote computer shall be the City's responsibility. , Furnished reports shall be limited to TCI standard daily, weekly and monthly reports. Additional reports can be provided for additional costs. * Bonding costs and/or sales taxes are not included and shall be extra costs if required ~2/~9/I~9~ 18:~7 21~2~L~ TEAM CONTROLS NC. PAGE We are av~ilable to r~,iew tl~is proposal at your convenience and trust that you shall not h4ssitate to call if there are any questions, This proposal shall be valid for sixty (60) days from this date, S.[ncerely, C!ary D, McNiel ~DM/~aw D2/'FJg/Igcj4 13:17 21,42a',,L,'cj5 TE~M CONTROLS NC. PAGE CITY OF OOiH~LL Exhibit "B" VILLAGE PARK"vtv'AY (I} PC)WER FAIL (e) PUMI~ CONTROL CI P~MP GTATION (l) ~NTRU$1ON (2) AIR SCRUBBE~ FL~ {;) SPARE DR~VER TO COM- (6) PUMP STAT~$ (8) SPARE {~) DISCH FLOW WEST~ IC-lO0O (6) PUMP ~AiL (1) CLZ FEEO RAIE (~) ~sR SCRUB~R (1] N~3 FEED RATE ~> N~ DLEC~RGE STATUS (1~ AMMONIA 5CAL~ Pl~ WILL BE (1) AMMONIA L~ (1) GLZ $CALE ~RDVIOEO (I) CL2 L~K (1) CL2 ANAL~E~ (11 ~MPLE VALVE (e) (3~) TOTAL { 16} TOTAL ( q G) ] OT~L (~ > TO~AL ~ISTING E$~ (~) P~ER FAIL (1) V~LVE OPEN (1> EST LEVEL ~UTURE (I) ENTRY ~ITCH (2) SPARE (~) VAL~ STAT~$ ~a} 3P~RE (8) SPARE ~4~ '~L (2) T~TAL FUTURE N~ E~T (1) ~WER ~1~ (1) VALVE OPEN (1) INTRUSION (1) VALVE CLOSE (~) eL2 AN~LY~ER (I) ENTRY ~ITCH (2) SPARE ~I) V~L~ 5TATU3 (4~ SPARE (e) ~pAff~ (4] TOTAL (~) TOTA~ =UYU~E ~N'DY L~KE (~) POWER ~AIL (3) p~Mp CONTROL (~) W~ L~E~ FUTURE 1> N~ ULTRA- LlFl STATION (1) INTRUSION (1} ~PA~ (I~ ~pA~E 5;N~G ~LT WILL (~) ENTRY ~ITCH BE F,ROV~EO ~TATU$ (3) PUMP ~ATUS (1) W~ HI ~SPARE (8) TOTAL ;4) TOTAL (2) TOTAL FUTURE ~ F~T [~] POWER FAIL ~3) PUMP CONTROL (I) W~ L~EL ~UT~RE ~} N~ ULTRA~ LIFT ~TATICN (t) INTRL~ION (1) 5~RE (l~ SPI~E SONIC LII WILL {11 ENTRY SWITCH ~ ~IDED 5TITU~ (3) PUMP STATUS (~) D~ Hi L~L (I) W~ HI L~L {6) TOTAL .... (4) TOTAL ......... 82/~9/199~ 13; 17 2142,~ J..,'~95 TE,~f4 CONTROLE NC. P~GE CITY OF COPPELt. PROPOSED COMPUTER PRODUCTS EXHIBIT "C" LOCATED AT VILLAGE PARKWAY PUMP STATION I SCADA .~ERVER OPERATOR WORKSTATION CONSISTING OF FOLLOWING; (I) GATEWAY P5-120 MHZ COMPUTER WITH 15MR RAM. 256K CACHE, (1) 1.2GB HARD DRIVE, (1) 3.5" 1.44MR DISK DRIVE, 6X CD-ROM DRIVE, MOUSE AND VIVITRON 17' MONITOR ( 15.7" VIEWABLE ) (1) ETHERNET & MODEM PRODUCTS (1) MS OFFICE PRO FOR WINDOWS 9S (1) WIN-911/411 ALARM AND PAGING SOFTWARE (1) WONDERWARE RUN TIME/DEVELOPMENT SCADA SERVER SOFTWARE (1) BEST 750VA UPS (1) HP LASER PRINTER MODEL 5L SERVICE WORKSTATION ( PORTABLE ) I PORTABLE VIEW NODE WORKSTATION CONSISTING OF THE FOLLOWING- (1) GATEWAY P5-1;0 NOTEBOOK COMPUTER WITH 16MR RAM. 2S6K CACHE. (1) 1.2GB HARD DRIVE, (1) 3.5" 1.44MR DISK DRIVE, MOUSE AND MONITOR. (1) ETHERNET & MODEM PRODUCTS (1) MS OFFICE PRO FOR WINDOWS 95 (1) WONDERWARE RUN TIME ONLY SCADA SOFTWARF COPPEL~ ,XLS Page 1 711 1/95