Loading...
Copperstone-LR 960408 G~O-- CO*'qULTING ENGINEERS IN: TB(]~HZ~UBe Environmental Assessments Z~, Soils & Four~dations Construction Hateria[s Testing "Excellence by Experience" Commercial & Industrial Inspection PO 8ox 92548 · Southtake, Texas 76092 · (817) 329-0281 CONCRETE CYLINDER TEST RESULTS PROJECT: Copperstone LOCATION: Coppell JOB #: 95-1522 DATE OF BREAK: 04-08-96 DAY: Monday CLIENT: Copperstone Ltd CONTRACTOR: Clack Construction c/o Briscoe Clark Comp SUB-CONTRACTOR: Beck Foundations CYL. SLUMP DATE OF DAYS I.D. LOCATION (IN.) SAMPLE AGED POUNDS PSI East End Rip-Rap: 48A @ south section* 04-01-96 7 96,000 3396 48B @ south section* 04-01-96 7 97,500 3449 29C @ center bent #2 6.5" 03-11-96 28 115,500 4086 29D @ center bent #2 6.5" 03-11-96 28 118,000 4174 72' drilled pier C: 30C @ east abutment 6.5" 03-11-96 28 141,000 4988 30D @ east abutment 6.5" 03-11-96 28 141,500 5005 SPECIFICATIONS: 3600 psi @ 28 days SUPPLIER: Pioneer Glenn Hutchinson Technician