ST0502B- LR160120Hl_LIfY'ICE
G GEOTEChM'1FCAL
GROUP
Consulting Engineering * Geotechnical Engineering * Construction Materials
3228 Halifax Street, Suite A, Dallas, Texas 75247
Phone: (972) 444-8889 Fax: (972) 444-8893
Acct ID: 1770 File No: C15-0812
Report Date: 01/20/2016
Project: Freeport Parkway North
Location: Paving
Date Sampled: 01/15/2016
Sampled By: Reyes, Jason
By Order Of: Walter
Order Number: 1770
Client: City of Coppell
REPORT: REPORT OF CONCRETE COMPRESSIVE STRENGTH TEST LAB NO: 201195
Test Method: See Below
TEST RESULTS Report No: 201195
Page 1 of 18
Set: 1 of 18
Location: Station 29+50
Spec
Age Tested
Diameter
Nbr
(date : days)
(in)
A
01/18/16:3
6.00
B
01/22/16:7
6.00
C
02/12/16:28
6.00
D
01/17/16:2
6.00
E
09/04/40:8,999
6.00
Material: Concrete
Maximum
Area Load
(int) (Ibs)
28.27 105,910
28.27
28.27
28.27
28.27
Type 1
Specification
Strength: 3,600 psi @ 28 days
Slump: 1-3
Air Content: 3-6
Compressive
Cure Strength
Break Type Loc (PSI)
Type 3 Lab 3,750
Lab
Lab
Lab
Lab
Number of Specimens: 5
Average
Strength Tested
(PSI) By Comments
3,750 JR
RN N PFI 17
Type 2 Type 3 Type 4 Type 5 Type 6
Slump: 1.5 Inches Transported By: Tiseo
Air Content: 7.0% Source/Sampled At: Truck / Center
Mix Code: 2605M Plant: On -Site
Date Received: 01/16/2016 Truck/Ticket No: N/A/ 24279
Curing Method: Standard
Time Sampled: 7:20 am
Time Batched: 7:02 am
Temp.: Ambient: 46*F Mix: 59*F
Unit Weight: 140.6 #/cu ft
Quantity Represented: 10 cu. yds. at 20 cu. yds. placed of a 780 cu. yd. total placement
Remarks:
Test Method (As Applicable): Unless noted in remarks, concrete was sampled and tested in accordance with ASTM C31, C172, C143,
C1064 and C138. Compressive strength test per ASTM C39. Air Content was per ASTM C231 and
cylinders were not capped per ASTM C617.
Orig: City of Coppell (Coppell, TX) Attn: Mr. Rick O'Dell (1 -cc copy)
Respectfully Submitted,
Alliance Geotechnical Group
Perry C. Kakara, ET, CME Department Manager
THIS REPORT APPLIES ONLY TO THE STANDARDS OR PROCEDURES INDICATED AND TO THE SAMPLE(S) TESTED AND/OR OBSERVED AND ARE NOT NECESSARILY INDICATIVE OF
THE QUALITIES OF APPARENTLY IDENTICAL OR SIMILAR PRODUCTS OR PROCEDURES, NOR DO THEY REPRESENT AN ONGOING QUALITY ASSURANCE PROGRAM UNLESS SO
NOTED. THESE REPORTS ARE FOR THE EXCLUSIVE USE OF THE ADDRESSED CLIENT AND ARE NOT TO BE REPRODUCED WITHOUT WRITTEN PERMISSION.
RLLIf11'ICE
GEQTKHYICRL
_QiWP
Consulting Engineering * Geotechnical Engineering * Construction Materials
3228 Halifax Street, Suite A, Dallas, Texas 75247
Phone: (972) 444-8889 Fax: (972) 444-8893
Acct ID: 1770 File No: C15-0812 Date Sampled: 01/15/2016
Report Date: 01/20/2016 Sampled By: Reyes, Jason
Project: Freeport Parkway North By Order Of: Walter
Location: Paving Order Number: 1770
Client: City of Coppell
REPORT. REPORT OF CONCRETE COMPRESSIVE STRENGTH TEST LAB NO: 201195
Test Method: See Below
TEST RESULTS Report No: 201195
Page 2 of 18
Set: 2 of 18 Material: Concrete Number of Specimens: 5
Location: Station 28+50
Maximum Compressive
Average
Spec Age Tested Diameter Area Load Cure Strength
Strength Tested
Nbr (date : days) (in) (int) (lbs) Break Type Loc (PSI)
(PSI) By Comments
A 01/18/16: 3 6.00 28.27 107,765 Type 3 Lab 3,810
3,810 JR
B 01/22/16:7 6.00 28.27 Lab
C 02/12/16:28 6.00 28.27 Lab
D 02/12/16:28 6.00 28.27 Lab
E
HOLD (see remarks) -
R071
fel
Type 1 Type 2 Type 3 Type 4 Type 5
Type 6
Specification
Strength: 3,600 psi @ 28 days
Slump: 1-3 Slump: 2.0 Inches
Transported By: Tiseo
Air Content: 3-6 Air Content: 4.6% Source/Sampled
At: Truck / Center
Mix Code: 2605M
Plant: On -Site
Date Received: 01/16/2016
Truck/Ticket No: N/A/ 24291
Curing Method: Standard
Time Sampled: 8:05 am
Time Batched: 7:44 am
Temp.: Ambient: 46°F Mix: 62°F
Unit Weight: 145.7 #/cu ft
Quantity Represented: 6 cu. yds. at 132 cu. yds. placed of a 780 cu. yd. total placement
Remarks:
Test Method (As Applicable): Unless noted in remarks, concrete was sampled and tested in accordance with ASTM C31, C172, C143,
C1064 and C138. Compressive strength test per ASTM C39. Air Content was per ASTM C231 and
cylinders were not capped per ASTM C617.
Orig: City of Coppell (Coppell, TX) Attn: Mr. Rick O'Dell (1 -cc copy)
Respectfully Submitted,
Alliance Geotechnical Group
Perry C_ Kak,-#a, SET, CME Department Manager
THIS REPORT APPLIES ONLY TO THE STANDARDS OR PROCEDURES INDICATED AND TO THE SAMPLE(S) TESTED AND/OR OBSERVED AND ARE NOT NECESSARILY INDICATIVE OF
THE QUALITIES OF APPARENTLY IDENTICAL OR SIMILAR PRODUCTS OR PROCEDURES, NOR DO THEY REPRESENT AN ONGOING QUALITY ASSURANCE PROGRAM UNLESS SO
NOTED. THESE REPORTS ARE FOR THE EXCLUSIVE USE OF THE ADDRESSED CLIENT AND ARE NOT TO BE REPRODUCED WITHOUT WRITTEN PERMISSION.
1 ILLnit.L
GEOTECt'IYICAL
i` GROUP
Consulting Engineering * Geotechnical Engineering * Construction Materials
3228 Halifax Street, Suite A, Dallas, Texas 75247
Phone: (972) 444-8889 Fax: (972) 444-8893
Acct ID: 1770 File No: C15-0812 Date Sampled: 01/15/2016
Report Date: 01/20/2016 Sampled By: Reyes, Jason
Project: Freeport Parkway North By Order Of: Walter
Location: Paving Order Number: 1770
Client: City of Coppell
REPORT. REPORT OF CONCRETE COMPRESSIVE STRENGTH TEST LAB NO: 201195
Test Method: See Below
TEST RESULTS Report No: 201195
Page 3 of 18
Set: 3 of 18 Material: Concrete Number of Specimens: 5
Location: Station 27+78.29
Maximum Compressive Average
Spec Age Tested Diameter Area Load Cure Strength Strength Tested
Nbr (date : days) (in) (int) (lbs) Break Type Loc (PSI) (PSI) By Comments
A 01/18/16: 3 6.00 28.27 114,050 Type 3 Lab 4,030 4,030 JR
B 01/22/16:7 6.00 28.27 Lab
C 02/12/16:28 6.00 28.27 Lab
D 02/12/16:28 6.00 28.27 Lab
E HOLD (see remarks) -
FIS ® fes! 1: 11 f
Type 1 Type 2 Type 3 Type 4 Type 5 Type 6
Specification
Strength: 3,600 psi @ 28 days
Slump: 1-3 Slump: 1.5 Inches Transported By: Tiseo
Air Content: 3-6 Air Content: 5.0% Source/Sampled At: Truck / Center
Mix Code: 2605M Plant: On -Site
Date Received: 01/16/2016 Truck/Ticket No: N/A / 24301
Curing Method: Standard
Time Sampled: 8:30 am
Time Batched: 8:11 am
Temp.: Ambient: 47°F Mix: 61°F
Unit Weight: 145.2 #/cu ft
Quantity Represented: 10 cu. yds. at 230 cu. yds. placed of a 780 cu. yd. total placement
Remarks:
Test Method (As Applicable): Unless noted in remarks, concrete was sampled and tested in accordance with ASTM C31, C172, C143,
C1064 and C138. Compressive strength test per ASTM C39. Air Content was per ASTM C231 and
cylinders were not capped per ASTM C617.
Orig: City of Coppell (Coppell, TX) Attn: Mr. Rick O'Dell (1 -cc copy)
Respectfully Submitted,
Alliance Geotechnical Group
Perry C, Kakara, SET, CME Department Manager
THIS REPORT APPLIES ONLY TO THE STANDARDS OR PROCEDURES INDICATED AND TO THE SAMPLE(S) TESTED AND/OR OBSERVED AND ARE NOT NECESSARILY INDICATIVE OF
THE QUALITIES OF APPARENTLY IDENTICAL OR SIMILAR PRODUCTS OR PROCEDURES, NOR DO THEY REPRESENT AN ONGOING QUALITY ASSURANCE PROGRAM UNLESS SO
NOTED. THESE REPORTS ARE FOR THE EXCLUSIVE USE OF THE ADDRESSED CLIENT AND ARE NOT TO BE REPRODUCED WITHOUT WRITTEN PERMISSION
flLLIHIYCE
G GEOTMMICRL
GROUP
Consulting Engineering * Geotechnical Engineering * Construction Materials
3228 Halifax Street, Suite A, Dallas, Texas 75247
Phone: (972) 444-8889 Fax: (972) 444-8893
Acct ID: 1770 File No: C15-0812
Report Date: 01/20/2016
Project: Freeport Parkway North
Location: Paving
Date Sampled: 01/15/2016
Sampled By: Reyes, Jason
By Order Of: Walter
Order Number: 1770
Client: City of Coppell
REPORT: REPORT OF CONCRETE COMPRESSIVE STRENGTH TEST LAB NO: 201195
Test Method: See Below
TEST RESULTS
Set: 4 of 18
Material: Concrete
Location:
Station 26+89
Maximum Compressive
Spec
Age Tested
Diameter
Area Load Cure
Strength
Nbr
(date : days)
(in)
(int) (Ibs) Break Type Loc
(PSI)
A
01/18/16: 3
6.00
28.27 122,400 Type 3 Lab
4,330
B
01/22/16:7
6.00
28.27 Lab
C
02/12/16:28
6.00
28.27 Lab
D
02/12/16:28
6.00
28.27 Lab
E
RI rP � 91 R_ M z 9
F I
Type 1 Type 2 Type 3 Type 4
Type 5
Specification
Strength: 3,600
psi @ 28 days
Slump: 1-3
Slump: 1.5 Inches
Air Content: 3-6
Air Content: 5.1 %
Mix Code: 2605M
Report No: 201195
Page 4 of 18
Number of Specimens: 5
Average
Strength Tested
(PSI) By Comments
4,330 JR
HOLD (see remarks) -
I.r.
Type 6
Transported By: Tiseo
Source/Sampled At: Truck / Center
Plant: On -Site
Date Received: 01/16/2016 Truck/Ticket No: N/A / 24311
Curing Method: Standard
Time Sampled: 8:55 am
Time Batched: 8:36 am
Temp.: Ambient: 49°F Mix: 61°F
Unit Weight: 145.6 #/cu ft
Quantity Represented: 10 cu. yds. at 330 cu. yds. placed of a 780 cu. yd. total placement
Remarks:
Test Method (As Applicable): Unless noted in remarks, concrete was sampled and tested in accordance with ASTM C31, C172, C143,
C1064 and C138. Compressive strength test per ASTM C39. Air Content was per ASTM C231 and
cylinders were not capped per ASTM C617.
Orig: City of Coppell (Coppell, TX) Attn: Mr. Rick O'Dell (1 -cc copy)
Respectfully Submitted,
Alliance Geotechnical Group
it
Perry C, Kakara, SET, CME Department Manager
THIS REPORT APPLIES ONLY TO THE STANDARDS OR PROCEDURES INDICATED AND TO THE SAMPLE(S) TESTED AND/OR OBSERVED AND ARE NOT NECESSARILY INDICATIVE OF
THE QUALITIES OF APPARENTLY IDENTICAL OR SIMILAR PRODUCTS OR PROCEDURES, NOR DO THEY REPRESENT AN ONGOING QUALITY ASSURANCE PROGRAM UNLESS SO
NOTED. THESE REPORTS ARE FOR THE EXCLUSIVE USE OF THE ADDRESSED CLIENT AND ARE NOT TO BE REPRODUCED WITHOUT WRITTEN PERMISSION.
RLLIRI'ICE
G GEOTECM[CfL
GROUP
Consulting Engineering * Geotechnical Engineering * Construction Materials
3228 Halifax Street, Suite A, Dallas, Texas 75247
Phone: (972) 444-8889 Fax: (972) 444-8893
Acct ID: 1770
File No: C15-0812
Date Sampled: 01/15/2016
Report Date: 01/20/2016
Sampled By: Reyes, Jason
Project: Freeport Parkway North
By Order Of: Walter
Location: Paving
Order Number: 1770
Client: City of Coppell
REPORT. REPORT OF CONCRETE COMPRESSIVE STRENGTH TEST
LAB NO: 201195
Test Method: See Below
TEST RESULTS
Report No: 201195
Page 5 of 18
Set: 5 of 18
Material: Concrete
Number of Specimens: 5
Location: Station 26+00
Maximum Compressive
Average
Spec Age Tested Diameter
Area Load Cure Strength
Strength Tested
Nbr (date : days) (in)
(int) (lbs) Break Type Loc (PSI)
(PSI) By Comments
A 01/18/16: 3 6.00
28.27 127,150 Type 3 Lab 4,500
4,500 JR
B 01/22/16:7 6.00
28.27 Lab
C 02/12/16:28 6.00
28.27 Lab
D 02/12/16:28 6.00
28.27 Lab
E
HOLD (see remarks) -
RF9 R P1 ® 1` 1
[ -11
11
Ir_
Type 1 Type 2 Type 3 Type 4 Type 5
Type 6
Specification
Strength: 3,600 psi @ 28 days
Slump: 1-3
Slump: 1.5 Inches
Transported By: Tiseo
Air Content: 3-6
Air Content: 4.8% Source/Sampled At: Truck / Center
Mix Code: 2605M
Plant: On -Site
Date Received: 01/16/2016 Truck/Ticket No: N/A / 24322
Curing Method: Standard
Time Sampled: 9:35 am
Time Batched: 9:07 am
Temp.: Ambient: 49°F Mix: 62°F
Unit Weight: 145.8 #/cu ft
Quantity Represented: 10 cu. yds. at 440 cu. yds. placed of a 780 cu. yd. total placement
Remarks:
Test Method (As Applicable): Unless noted in remarks, concrete was sampled and tested in accordance with ASTM C31, C172, C143,
C1064 and C138. Compressive strength test per ASTM C39. Air Content was per ASTM C231 and
cylinders were not capped per ASTM C617.
Orig: City of Coppell (Coppell, TX) Attn: Mr. Rick O'Dell (1 -cc copy) Respectfully Submitted,
Alliance Geotechnical Group
Perry C. Kakara, SET, CME Department Manager
THIS REPORT APPLIES ONLY TO THE STANDARDS OR PROCEDURES INDICATED AND TO THE SAMPLE(S) TESTED AND/OR OBSERVED AND ARE NOT NECESSARILY INDICATIVE OF
THE QUALITIES OF APPARENTLY IDENTICAL OR SIMILAR PRODUCTS OR PROCEDURES, NOR DO THEY REPRESENT AN ONGOING QUALITY ASSURANCE PROGRAM UNLESS SO
NOTED. THESE REPORTS ARE FOR THE EXCLUSIVE USE OF THE ADDRESSED CLIENT AND ARE NOT TO BE REPRODUCED WITHOUT WRITTEN PERMISSION.
� ALLIfY'ICE
(4� GEOTE^CFNYICI9L
GROUP
Consulting Engineering * Geotechnical Engineering * Construction Materials
3228 Halifax Street, Suite A, Dallas, Texas 75247
Phone: (972) 444-8889 Fax: (972) 444-8893
Acct ID: 1770 File No: C15-0812
Report Date: 01/20/2016
Project: Freeport Parkway North
Location: Paving
Client: Citv of Coppell
Date Sampled: 01/15/2016
Sampled By: Reyes, Jason
By Order Of: Walter
Order Number: 1770
REPORT. REPORT OF CONCRETE COMPRESSIVE STRENGTH TEST LAB NO: 201195
Test Method: See Below
TEST RESULTS
Set: 6 of 18 Material: Concrete
Location: Station 25+50
Spec
Nbr
A
B
C
D
E
Maximum
Age Tested
Diameter
Area Load
(date : days)
(in)
(in Z) (lbs)
01/18/16:3
6.00
28.27 139,175
01/22/16:7
6.00
28.27
02/12/16:28
6.00
28.27
02/12/16:28
6.00
28.27
Compressive
Cure Strength
Break Type Loc (PSI)
Type 3 Lab 4,920
Lab
Lab
Lab
Report No: 201195
Page 6 of 18
Number of Specimens: 5
Average
Strength Tested
(PSI) By Comments
4,920 JR
HOLD (see remarks) -
Fll--,] 7
Type 1 Type 2 Type 3 Type 4 Type 5 Type 6
Specification
Strength: 3,600 psi @ 28 days
Slump: 1-3 Slump: 1.0 Inches Transported By: Tiseo
Air Content: 3-6 Air Content: 3.9% Source/Sampled At: Truck / Center
Mix Code: 2605M Plant: On -Site
Date Received: 01/16/2016 Truck/Ticket No: N/A/ 24329
Curing Method: Standard
Time Sampled: 9:45 am
Time Batched: 9:24 am
Temp.: Ambient: 51°F Mix: 63°F
Unit Weight: 147.9 #/cu ft
Quantity Represented: 10 cu. yds. at 510 cu. yds. placed of a 780 cu. yd. total placement
Remarks:
Test Method (As Applicable): Unless noted in remarks, concrete was sampled and tested in accordance with ASTM C31, C172, C143,
C1064 and C138. Compressive strength test per ASTM C39. Air Content was per ASTM C231 and
cylinders were not capped per ASTM C617.
Orig: City of Coppell (Coppell, TX) Attn: Mr. Rick O'Dell (1 -cc copy)
Respectfully Submitted,
Alliance Geotechnical Group
Perry C. Kakara, SET, CME Department Manager
THIS REPORT APPLIES ONLY TO THE STANDARDS OR PROCEDURES INDICATED AND TO THE SAMPLE(S) TESTED AND/OR OBSERVED AND ARE NOT NECESSARILY INDICATIVE OF
THE QUALITIES OF APPARENTLY IDENTICAL OR SIMILAR PRODUCTS OR PROCEDURES, NOR DO THEY REPRESENT AN ONGOING QUALITY ASSURANCE PROGRAM UNLESS SO
NOTED. THESE REPORTS ARE FOR THE EXCLUSIVE USE OF THE ADDRESSED CLIENT AND ARE NOT TO BE REPRODUCED WITHOUT WRITTEN PERMISSION.
f1LLIfiICE
GEOTMMICML
GRCUF
Consulting Engineering * Geotechnical Engineering * Construction Materials
3228 Halifax Street, Suite A, Dallas, Texas 75247
Phone: (972) 444-8889 Fax: (972) 444-8893
Acct ID: 1770 File No: C15-0812 Date Sampled: 01/15/2016
Report Date: 01/20/2016 Sampled By: Reyes, Jason
Project: Freeport Parkway North By Order Of: Walter
Location: Paving Order Number: 1770
Client: City of Coppell
REPORT. REPORT OF CONCRETE COMPRESSIVE STRENGTH TEST LAB NO: 201195
Test Method: See Below
TEST RESULTS Report No: 201195
Page 7 of 18
Set: 7 of 18 Material: Concrete Number of Specimens: 5
Location: Station 24+98.11
Maximum Compressive Average
Spec Age Tested Diameter Area Load Cure Strength Strength Tested
Nbr (date : days) (in) (int) (lbs) Break Type Loc (PSI) (PSI) By Comments
A 01/18/16 : 3 6.00 28.27 112,095 Type 3 Lab 3,960 3,960 JR
B 01/22/16:7 6.00 28.27 Lab
C 02/12/16:28 6.00 28.27 Lab
D 02/12/16:28 6.00 28.27 Lab
E ` HOLD (see remarks) -
F X
/11,71 F_ R___ M S1 [
Type 1 Type 2 Type 3 Type 4 Type 5 Type 6
Specification
Strength: 3,600 psi @ 28 days
Slump: 1-3 Slump: 1.0 Inches Transported By: Tiseo
Air Content: 3-6 Air Content: 4.0% Source/Sampled At: Truck / Center
Mix Code: 2605M Plant: On -Site
Date Received: 01/16/2016 Truck/Ticket No: N/A / 24340
Curing Method: Standard
Time Sampled: 10:30 am
Time Batched: 9:55 am
Temp.: Ambient: 50°F Mix: 63°F
Unit Weight: 145.6 #/cu ft
Quantity Represented: 10 cu. yds. at 620 cu. yds. placed of a 780 cu. yd. total placement
Remarks:
Test Method (As Applicable): Unless noted in remarks, concrete was sampled and tested in accordance with ASTM C31, C172, C143,
C1064 and C138. Compressive strength test per ASTM C39. Air Content was per ASTM C231 and
cylinders were not capped per ASTM C617.
Orig: City of Coppell (Coppell, TX) Attn: Mr. Rick O'Dell (1 -cc copy)
Respectfully Submitted,
Alliance Geotechnical Group
r
Perry C. Kakara, SET, CME Department Manager
THIS REPORT APPLIES ONLY TO THE STANDARDS OR PROCEDURES INDICATED AND TO THE SAMPLE(S) TESTED AND/OR OBSERVED AND ARE NOT NECESSARILY INDICATIVE OF
THE QUALITIES OF APPARENTLY IDENTICAL OR SIMILAR PRODUCTS OR PROCEDURES, NOR DO THEY REPRESENT AN ONGOING QUALITY ASSURANCE PROGRAM UNLESS SO
NOTED. THESE REPORTS ARE FOR THE EXCLUSIVE USE OF THE ADDRESSED CLIENT AND ARE NOT TO BE REPRODUCED WITHOUT WRITTEN PERMISSION.
RLLIf'Y'ICE
GEOTECFII'lICf1L
_CyiOU
Consulting Engineering * Geotechnical Engineering * Construction Materials
3228 Halifax Street, Suite A, Dallas, Texas 75247
Phone: (972) 444-8889 Fax: (972) 444-8893
Acct ID: 1770 File No: C15-0812 Date Sampled: 01/15/2016
Report Date: 01/20/2016 Sampled By: Reyes, Jason
Project: Freeport Parkway North By Order Of: Walter
Location: Paving Order Number: 1770
Client: City of Coppell
REPORT: REPORT OF CONCRETE COMPRESSIVE STRENGTH TEST LAB NO: 201195
Test Method: See Below
TEST RESULTS Report No: 201195
Page 8 of 18
Set: 8 of 18 Material: Concrete Number of Specimens: 5
Location: Station 24+00
Maximum Compressive
Average
Spec Age Tested Diameter Area Load Cure Strength
Strength Tested
Nbr (date : days) (in) (in Z) (lbs) Break Type Loc (PSI)
(PSI) By Comments
A 01/18/16: 3 6.00 28.27 135,575 Type 3 Lab 4,790
4,790 JR
B 01/22/16:7 6.00 28.27 Lab
C 02/12/16:28 6.00 28.27 Lab
D 02/12/16:28 6.00 28.27 Lab
E
HOLD (see remarks) -
f I F1F-1
F1
Type 1 Type 2 Type 3 Type 4 Type 5
Type 6
Specification
Strength: 3,600 psi @ 28 days
Slump: 1-3 Slump: 1.0 Inches
Transported By: Tiseo
Air Content: 3-6 Air Content: 3.7% Source/Sampled At: Truck / Center
Mix Code: 2605M
Plant: On -Site
Date Received: 01/16/2016
Truck/Ticket No: N/A/ 24350
Curing Method: Standard
Time Sampled: 11:20 am
Time Batched: 10:53 am
Temp.: Ambient: 52°F Mix: 66°F
Unit Weight: 148 #/cu ft
Quantity Represented: 10 cu. yds. at 720 cu. yds. placed of a 780 cu. yd. total placement
Remarks:
Test Method (As Applicable): Unless noted in remarks, concrete was sampled and tested
in accordance with ASTM C31, C172, C143,
C1064 and C138. Compressive strength test per ASTM C39. Air Content was per ASTM C231 and
cylinders were not capped per ASTM C617.
Orig: City of Coppell (Coppell, TX) Attn: Mr. Rick O'Dell (1 -cc copy)
Respectfully Submitted,
Alliance Geotechnical Group
Perry C. Kakara, SET, CME Department Manager
THIS REPORT APPLIES ONLY TO THE STANDARDS OR PROCEDURES INDICATED AND TO THE SAMPLE(S) TESTED AND/OR OBSERVED AND ARE NOT NECESSARILY INDICATIVE OF
THE QUALITIES OF APPARENTLY IDENTICAL OR SIMILAR PRODUCTS OR PROCEDURES, NOR DO THEY REPRESENT AN ONGOING QUALITY ASSURANCE PROGRAM UNLESS SO
NOTED. THESE REPORTS ARE FOR THE EXCLUSIVE USE OF THE ADDRESSED CLIENT AND ARE NOT TO BE REPRODUCED WITHOUT WRITTEN PERMISSION.
RLLlfil'ICE
GROUP
Consulting Engineering * Geotechnical Engineering * Construction Materials
3228 Halifax Street, Suite A, Dallas, Texas 75247
Phone: (972) 444-8889 Fax: (972) 444-8893
Acct ID: 1770 File No: C15-0812
Report Date: 01/20/2016
Project: Freeport Parkway North
Location: Paving
Client: City of Coppell
REPORT. REPORT OF CONCRETE COMPRESSIVE STRENGTH TEST
TEST RESULTS
Set: 9 of 18 Material: Concrete
Location: Station 23+35
Spec
Nbr
A
B
C
D
E
Compressive
Cure Strength
Break Type Loc (PSI)
Type 3 Lab 4,510
Lab
Lab
Lab
Date Sampled: 01/15/2016
Sampled By: Reyes, Jason
By Order Of: Walter
Order Number: 1770
LAB NO: 201195
Test Method: See Below
Report No: 201195
Page 9 of 18
Number of Specimens: 5
Average
Strength Tested
(PSI) By Comments
4,510 JR
HOLD (see remarks) -
Type 1 Type 2 Type 3 Type 4 Type 5 Type 6
Specification
Strength: 3,600 psi @ 28 days
Slump: 1-3 Slump: 1.5 Inches Transported By: Tiseo
Air Content: 3-6 Air Content: 3.9% Source/Sampled At: Truck / Center
Mix Code: 2605M Plant: On -Site
Date Received: 01/16/2016 Truck/Ticket No: N/A/ 24361
Curing Method: Standard
Time Sampled: 11:55 am
Time Batched: 11:44 am
Temp.: Ambient: 53°F Mix: 65°F
Unit Weight: 147.3 #/cu ft
Quantity Represented: 10 cu. yds. at 830 cu. yds. placed of a 1780 cu. yd. total placement
Remarks:
Test Method (As Applicable): Unless noted in remarks, concrete was sampled and tested in accordance with ASTM C31, C172, C143,
C1064 and C138. Compressive strength test per ASTM C39. Air Content was per ASTM C231 and
cylinders were not capped per ASTM C617.
Orig: City of Coppell (Coppell, TX) Attn: Mr. Rick O'Dell (1 -cc copy)
Respectfully Submitted,
Alliance Geotechnical Group
Perry C. Kakara, SET, CME Department Manager
THIS REPORT APPLIES ONLY TO THE STANDARDS OR PROCEDURES INDICATED AND TO THE SAMPLE(S) TESTED AND/OR OBSERVED AND ARE NOT NECESSARILY INDICATIVE OF
THE QUALITIES OF APPARENTLY IDENTICAL OR SIMILAR PRODUCTS OR PROCEDURES, NOR DO THEY REPRESENT AN ONGOING QUALITY ASSURANCE PROGRAM UNLESS SO
NOTED. THESE REPORTS ARE FOR THE EXCLUSIVE USE OF THE ADDRESSED CLIENT AND ARE NOT TO BE REPRODUCED WITHOUT WRITTEN PERMISSION.
Maximum
Age Tested
Diameter
Area
Load
(date : days)
(in)
(in Z)
(Ibs)
01/18/16:3
6.00
28.27
127,585
01/22/16: 7
6.00
28.27
02/12/16:28
6.00
28.27
02/12/16:28
6.00
28.27
Compressive
Cure Strength
Break Type Loc (PSI)
Type 3 Lab 4,510
Lab
Lab
Lab
Date Sampled: 01/15/2016
Sampled By: Reyes, Jason
By Order Of: Walter
Order Number: 1770
LAB NO: 201195
Test Method: See Below
Report No: 201195
Page 9 of 18
Number of Specimens: 5
Average
Strength Tested
(PSI) By Comments
4,510 JR
HOLD (see remarks) -
Type 1 Type 2 Type 3 Type 4 Type 5 Type 6
Specification
Strength: 3,600 psi @ 28 days
Slump: 1-3 Slump: 1.5 Inches Transported By: Tiseo
Air Content: 3-6 Air Content: 3.9% Source/Sampled At: Truck / Center
Mix Code: 2605M Plant: On -Site
Date Received: 01/16/2016 Truck/Ticket No: N/A/ 24361
Curing Method: Standard
Time Sampled: 11:55 am
Time Batched: 11:44 am
Temp.: Ambient: 53°F Mix: 65°F
Unit Weight: 147.3 #/cu ft
Quantity Represented: 10 cu. yds. at 830 cu. yds. placed of a 1780 cu. yd. total placement
Remarks:
Test Method (As Applicable): Unless noted in remarks, concrete was sampled and tested in accordance with ASTM C31, C172, C143,
C1064 and C138. Compressive strength test per ASTM C39. Air Content was per ASTM C231 and
cylinders were not capped per ASTM C617.
Orig: City of Coppell (Coppell, TX) Attn: Mr. Rick O'Dell (1 -cc copy)
Respectfully Submitted,
Alliance Geotechnical Group
Perry C. Kakara, SET, CME Department Manager
THIS REPORT APPLIES ONLY TO THE STANDARDS OR PROCEDURES INDICATED AND TO THE SAMPLE(S) TESTED AND/OR OBSERVED AND ARE NOT NECESSARILY INDICATIVE OF
THE QUALITIES OF APPARENTLY IDENTICAL OR SIMILAR PRODUCTS OR PROCEDURES, NOR DO THEY REPRESENT AN ONGOING QUALITY ASSURANCE PROGRAM UNLESS SO
NOTED. THESE REPORTS ARE FOR THE EXCLUSIVE USE OF THE ADDRESSED CLIENT AND ARE NOT TO BE REPRODUCED WITHOUT WRITTEN PERMISSION.
(040 RLLIfYYCE
� GEOTMMICRL
GIiOUP
Consulting Engineering * Geotechnical Engineering * Construction Materials
3228 Halifax Street, Suite A, Dallas, Texas 75247
Phone: (972) 444-8889 Fax: (972) 444-8893
Acct ID: 1770 File No: C15-0812
Report Date: 01/20/2016
Project: Freeport Parkway North
Location: Paving
Client: City of Coppell
REPORT. REPORT OF CONCRETE COMPRESSIVE STRENGTH TEST
Set: 10 of 18
Location: Station 22+58.39
Spec
Nbr
A
B
C
D
E
TEST RESULTS
Material: Concrete
Maximum
Age Tested
Diameter
Area Load
(date : days)
(in)
(int) (lbs)
01/18/16:3
6.00
28.27 134,315
01/22/16:7
6.00
28.27
02/12/16:28
6.00
28.27
02/12/16:28
6.00
28.27
Compressive
Cure Strength
Break Type Loc (PSI)
Type 3 Lab 4,750
Lab
Lab
Lab
Date Sampled: 01/15/2016
Sampled By: Reyes, Jason
By Order Of: Walter
Order Number: 1770
LAB NO: 201195
Test Method: See Below
Report No: 201195
Page 10 of 18
Number of Specimens: 5
Average
Strength Tested
(PSI) By Comments
4,750 JR
HOLD (see remarks) -
� RM- IU �"I r 11_' 1 7
Type 1 Type 2 Type 3 Type 4 Type 5 Type 6
Specification
Strength: 3,600 psi @ 28 days
Slump: 1-3 Slump: 1.5 Inches Transported By: Tiseo
Air Content: 3-6 Air Content: 4.5% Source/Sampled At: Truck / Center
Mix Code: 2605M Plant: On -Site
Date Received: 01/16/2016 Truck/Ticket No: N/A / 24370
Curing Method: Standard
Time Sampled: 12:25 pm
Time Batched: 12:08 pm
Temp.: Ambient: 60°F Mix: 67°F
Unit Weight: 145.9 #/cu ft
Quantity Represented: 10 cu. yds. at 920 cu. yds. placed of a 1780 cu. yd. total placement
Remarks:
Test Method (As Applicable): Unless noted in remarks, concrete was sampled and tested in accordance with ASTM C31, C172, C143,
C1064 and C138. Compressive strength test per ASTM C39. Air Content was per ASTM C231 and
cylinders were not capped per ASTM C617.
Orig: City of Coppell (Coppell, TX) Attn: Mr. Rick O'Dell (1 -cc copy)
Respectfully Submitted,
Alliance Geotechnical Group
Perry C, Kakara, SET, CME Department Manager
THIS REPORT APPLIES ONLY TO THE STANDARDS OR PROCEDURES INDICATED AND TO THE SAMPLE(S) TESTED AND/OR OBSERVED AND ARE NOT NECESSARILY INDICATIVE OF
THE QUALITIES OF APPARENTLY IDENTICAL OR SIMILAR PRODUCTS OR PROCEDURES, NOR DO THEY REPRESENT AN ONGOING QUALITY ASSURANCE PROGRAM UNLESS SO
NOTED. THESE REPORTS ARE FOR THE EXCLUSIVE USE OF THE ADDRESSED CLIENT AND ARE NOT TO BE REPRODUCED WITHOUT WRITTEN PERMISSION.
RLLIfY'ICE
GROUP
Consulting Engineering * Geotechnical Engineering * Construction Materials
3228 Halifax Street, Suite A, Dallas, Texas 75247
Phone: (972) 444-8889 Fax: (972) 444-8893
Acct ID: 1770 File No: C15-0812
Report Date: 01/20/2016
Project: Freeport Parkway North
Location: Paving
Client: City of Coppell
Date Sampled: 01/15/2016
Sampled By: Reyes, Jason
By Order Of: Walter
Order Number: 1770
REPORT. REPORT OF CONCRETE COMPRESSIVE STRENGTH TEST LAB NO: 201195
Test Method: See Below
TEST RESULTS
Set: 11 of 18 Material: Concrete
Location: Station 22+60
Spec
Nbr
A
B
C
D
E
Maximum
Age Tested
Diameter
Area
Load
(date : days)
(in)
(int)
(Ibs)
01/18/16:3
6.00
28.27
124,655
01/22/16:7
6.00
28.27
02/12/16:28
6.00
28.27
02/12/16:28
6.00
28.27
Compressive
Cure Strength
Break Type Loc (PSI)
Type 3 Lab 4,410
Lab
Lab
Lab
Report No: 201195
Page 11 of 18
Number of Specimens: 5
Average
Strength Tested
(PSI) By Comments
4,410 JR
HOLD (see remarks) -
® E F
Type 1 Type 2 Type 3 Type 4 Type 5 Type 6
Specification
Strength: 3,600 psi @ 28 days
Slump: 1-3 Slump: 1.5 Inches Transported By: Tiseo
Air Content: 3-6 Air Content: 4.2% Source/Sampled At: Truck / Center
Mix Code: 2605M Plant: On -Site
Date Received: 01/16/2016 Truck/Ticket No: N/A/ 24381
Curing Method: Standard
Time Sampled: 12:45 pm
Time Batched: 12:37 pm
Temp.: Ambient: 61 °F Mix: 66°F
Unit Weight: 145.4 #/cu ft
Quantity Represented: 10 cu. yds. at 1030 cu. yds. placed of a 1780 cu. yd. total placement
Remarks:
Test Method (As Applicable): Unless noted in remarks, concrete was sampled and tested in accordance with ASTM C31, C172, C143,
C1064 and C138. Compressive strength test per ASTM C39. Air Content was per ASTM C231 and
cylinders were not capped per ASTM C617.
Orig: City of Coppell (Coppell, TX) Aftn: Mr. Rick O'Dell (1 -cc copy)
Respectfully Submitted,
Alliance Geotechnical Group
Perry C. Kakara, SET, CME Department Manager
THIS REPORT APPLIES ONLY TO THE STANDARDS OR PROCEDURES INDICATED AND TO THE SAMPLE(S) TESTED AND/OR OBSERVED AND ARE NOT NECESSARILY INDICATIVE OF
THE QUALITIES OF APPARENTLY IDENTICAL OR SIMILAR PRODUCTS OR PROCEDURES, NOR DO THEY REPRESENT AN ONGOING QUALITY ASSURANCE PROGRAM UNLESS SO
NOTED THESE REPORTS ARE FOR THE EXCLUSIVE USE OF THE ADDRESSED CLIENT AND ARE NOT TO BE REPRODUCED WITHOUT WRITTEN PERMISSION.
f1LLIAfYCE
GEOTEChNYICPII.
GRCUP
Consulting Engineering * Geotechnical Engineering * Construction Materials
3228 Halifax Street, Suite A, Dallas, Texas 75247
Phone: (972) 444-8889 Fax: (972) 444-8893
Acct ID: 1770 File No: C15-0812 Date Sampled: 01/15/2016
Report Date: 01/20/2016 Sampled By: Reyes, Jason
Project: Freeport Parkway North By Order Of: Walter
Location: Paving Order Number: 1770
Client: City of Coppell
REPORT. REPORT OF CONCRETE COMPRESSIVE STRENGTH TEST LAB NO: 201195
Test Method: See Below
TEST RESULTS Report No: 201195
Page 12 of 18
Set: 12 of 18 Material: Concrete Number of Specimens: 5
Location: Station 21+00
Maximum Compressive Average
Spec Age Tested Diameter Area Load Cure Strength Strength Tested
Nbr (date : days) (in) (int) (Ibs) Break Type Loc (PSI) (PSI) By Comments
A 01/18/16: 3 6.00 28.27 132,260 Type 3 Lab 4,680 4,680 JR
B 01/22/16:7 6.00 28.27 Lab
C 02/12/16:28 6.00 28.27 Lab
D 02/12/16:28 6.00 28.27 Lab
E HOLD (see remarks) P11 F 9— '91 17
Type 1 Type 2 Type 3 Type 4 Type 5 Type 6
Specification
Strength: 3,600 psi @ 28 days
Slump: 1-3 Slump: 1.0 Inches Transported By: Tiseo
Air Content: 3-6 Air Content: 4.0% Source/Sampled At: Truck / Center
Mix Code: 2605M Plant: On -Site
Date Received: 01/16/2016 Truck/Ticket No: N/A / 24391
Curing Method: Standard
Time Sampled: 1:15 pm
Time Batched: 1:02 pm
Temp.: Ambient: 61°F Mix: 67*F
Unit Weight: 145.2 #/cu ft
Quantity Represented: 10 cu. yds. at 1130 cu. yds. placed of a 1780 cu. yd. total placement
Remarks:
Test Method (As Applicable): Unless noted in remarks, concrete was sampled and tested in accordance with ASTM C31, C172, C143,
C1064 and C138. Compressive strength test per ASTM C39. Air Content was per ASTM C231 and
cylinders were not capped per ASTM C617.
Orig: City of Coppell (Coppell, TX) Attn: Mr. Rick O'Dell (1 -cc copy)
Respectfully Submitted,
Alliance Geotechnical Group
Perry C. Kakara, SET, CME Department Manager
THIS REPORT APPLIES ONLY TO THE STANDARDS OR PROCEDURES INDICATED AND TO THE SAMPLE(S) TESTED AND/OR OBSERVED AND ARE NOT NECESSARILY INDICATIVE OF
THE QUALITIES OF APPARENTLY IDENTICAL OR SIMILAR PRODUCTS OR PROCEDURES, NOR DO THEY REPRESENT AN ONGOING QUALITY ASSURANCE PROGRAM UNLESS SO
NOTED. THESE REPORTS ARE FOR THE EXCLUSIVE USE OF THE ADDRESSED CLIENT AND ARE NOT TO BE REPRODUCED WITHOUT WRITTEN PERMISSION.
RLLIflPICE
GEOTE{M1Cf'MM..
QiWP
Acct ID: 1770
Report Date: 01/20/2016
Project: Freeport Parkway North
Location: Paving
Client: City of Coppell
Consulting Engineering * Geotechnical Engineering * Construction Materials
3228 Halifax Street, Suite A, Dallas, Texas 75247
Phone: (972) 444-8889 Fax: (972) 444-8893
File No: C15-0812
Date Sampled: 01/15/2016
Sampled By: Reyes, Jason
By Order Of: Walter
Order Number: 1770
REPORT. REPORT OF CONCRETE COMPRESSIVE STRENGTH TEST LAB NO: 201195
Test Method: See Below
TEST RESULTS
Set: 13 of 18 Material: Concrete
Location: Station 20+50
Spec
Nbr
A
B
C
D
E
Maximum
Age Tested
Diameter
Area Load
(date : days)
(in)
(int) (lbs)
01/18/16:3
6.00
28.27 134,405
01/22/16:7
6.00
28.27
02/12/16:28
6.00
28.27
02/12/16:28
6.00
28.27
Compressive
Cure Strength
Break Type Loc (PSI)
Type 3 Lab 4,750
Lab
Lab
Lab
Report No: 201195
Page 13 of 18
Number of Specimens: 5
Average
Strength Tested
(PSI) By Comments
4,750 JR
HOLD (see remarks) -
lE
Type 1 Type 2 Type 3 Type 4 Type 5 Type 6
Specification
Strength: 3,600 psi @ 28 days
Slump: 1-3 Slump: 1.5 Inches Transported By: Tiseo
Air Content: 3-6 Air Content: 4.2% Source/Sampled At: Truck / Center
Mix Code: 2605M Plant: On -Site
Date Received: 01/16/2016 Truck/Ticket No: N/A / 24400
Curing Method: Standard
Time Sampled: 1:40 pm
Time Batched: 1:28 pm
Temp.: Ambient: 61°F Mix: 67°F
Unit Weight: 146.8 #/cu ft
Quantity Represented: 10 cu. yds. at 1220 cu. yds. placed of a 1780 cu. yd. total placement
Remarks:
Test Method (As Applicable): Unless noted in remarks, concrete was sampled and tested in accordance with ASTM C31, C172, C143,
C1064 and C138. Compressive strength test per ASTM C39. Air Content was per ASTM C231 and
cylinders were not capped per ASTM C617.
Orig: City of Coppell (Coppell, TX) Attn: Mr. Rick O'Dell (1 -cc copy) Respectfully Submitted,
Alliance Geotechnical Group
Perry C. Kakara, SET, CME Department Manager
THIS REPORT APPLIES ONLY TO THE STANDARDS OR PROCEDURES INDICATED AND TO THE SAMPLE(S) TESTED AND/OR OBSERVED AND ARE NOT NECESSARILY INDICATIVE OF
THE QUALITIES OF APPARENTLY IDENTICAL OR SIMILAR PRODUCTS OR PROCEDURES, NOR DO THEY REPRESENT AN ONGOING QUALITY ASSURANCE PROGRAM UNLESS SO
NOTED. THESE REPORTS ARE FOR THE EXCLUSIVE USE OF THE ADDRESSED CLIENT AND ARE NOT TO BE REPRODUCED WITHOUT WRITTEN PERMISSION.
RLLIfU'ICE
�4 �J GEOTECMYICAL
GROUP
Consulting Engineering * Geotechnical Engineering * Construction Materials
3228 Halifax Street, Suite A, Dallas, Texas 75247
Phone: (972) 444-8889 Fax: (972) 444-8893
Acct ID: 1770 File No: C15-0812
Report Date: 01/20/2016
Project: Freeport Parkway North
Location: Paving
Client: City of Coppell
REPORT. REPORT OF CONCRETE COMPRESSIVE STRENGTH TEST LAB NO: 201195
Test Method: See Below
TEST RESULTS
Set: 14 of 18 Material: Concrete
Location: Station 19+50
Spec
Nbr
A
B
C
D
E
Age Tested
(date : days)
01/18/16: 3
01/22/16: 7
02/12/16: 28
02/12/16: 28
Maximum
Load
(lbs)
132,750
THIS REPORT APPLIES ONLY TO THE STANDARDS OR PROCEDURES INDICATED AND TO THE SAMPLE(S) TESTED AND/OR OBSERVED AND ARE NOT NECESSARILY INDICATIVE OF
THE QUALITIES OF APPARENTLY IDENTICAL OR SIMILAR PRODUCTS OR PROCEDURES, NOR DO THEY REPRESENT AN ONGOING QUALITY ASSURANCE PROGRAM UNLESS SO
NOTED. THESE REPORTS ARE FOR THE EXCLUSIVE USE OF THE ADDRESSED CLIENT AND
Diameter
Area
Cure
(in)
(int)
Loc
6.00
28.27
Lab
6.00
28.27
Lab
6.00
28.27
Lab
6.00
28.27
Lab
Break Type
Type 3
Compressive
Strength
(PSI)
4,700
Date Sampled: 01/15/2016
Sampled By: Reyes, Jason
By Order Of: Walter
Order Number: 1770
Report No: 201195
Page 14 of 18
Number of Specimens: 5
Average
Strength Tested
(PSI) By Comments
4,700 JR
HOLD (see remarks) -
F-71 RM IU F] I" I., I I
Type 1 Type 2 Type 3 Type 4 Type 5 Type 6
Specification
Strength: 3,600 psi @ 28 days
Slump: 1-3 Slump: 7.5 Inches Transported By: Tiseo
Air Content: 3-6 Air Content: 4.4% Source/Sampled At: Truck /Center
Mix Code: 2605M Plant: On -Site
Date Received: 01/16/2016 Truck/Ticket No: N/A/ 24412
Curing Method: Standard
Time Sampled: 2:15 pm
Time Batched: 2:05 pm
Temp.: Ambient: 62°F Mix: 68°F
Unit Weight: 146.2 #/cu ft
Quantity Represented: 10 cu. yds. at 1340 cu. yds. placed of a 1780 cu. yd. total placement
Remarks:
Test Method (As Applicable): Unless noted in remarks, concrete was sampled and tested in accordance with ASTM C31, C172, C143,
C1064 and C138. Compressive strength test per ASTM C39. Air Content was per ASTM C231 and
cylinders were not capped per ASTM C617.
Orig: City of Coppell (Coppell, TX) Att
n: Mr. Rick O'Dell (1 -cc copy)
Respectfully Submitted,
Alliance Geotechnical Group
Perry
C. Kakara, SET, CME Department Manager
ARE NOT TO BE REPRODUCED WITHOUT WRITTEN PERMISSION.
ALLlfil'ICE
G UEOTECMICRL
GROUP
Acct ID: 1770
Report Date: 01/20/2016
Project: Freeport Parkway North
Location: Paving
Client: City of Coppell
Consulting Engineering * Geotechnical Engineering * Construction Materials
3228 Halifax Street, Suite A, Dallas, Texas 75247
Phone: (972) 444-8889 Fax: (972) 444-8893
File No: C15-0812
Date Sampled: 01/15/2016
Sampled By: Reyes, Jason
By Order Of: Walter
Order Number: 1770
REPORT. REPORT OF CONCRETE COMPRESSIVE STRENGTH TEST LAB NO: 201195
Test Method: See Below
TEST RESULTS Report No: 201195
Page 15 of 18
Set: 15 of 18
Material: Concrete
Location:
Station 18+95
Maximum
Compressive
Spec
Age Tested
Diameter
Area Load
Cure
Strength
Nbr
(date : days)
(in)
(int) (lbs) Break Type
Loc
(PSI)
A
01/18/16: 3
6.00
28.27 130,360 Type 3
Lab
4,610
B
01/22/16:7
6.00
28.27
Lab
C
02/12/16:28
6.00
28.27
Lab
D
02/12/16:28
6.00
28.27
Lab
E
1f l F1 f,Il
I
f
f
Type 1 Type 2 Type 3
Type 4
Type 5
Specification
Strength: 3,600
psi @ 28 days
Number of Specimens: 5
Average
Strength Tested
(PSI) By Comments
4,610 JR
I—]
Type 6
HOLD (see remarks) -
Slump: 1-3 Slump: 1.0 Inches Transported By: Tiseo
Air Content: 3-6 Air Content: 4.2% Source/Sampled At: Truck / Center
Mix Code: 2605M Plant: On -Site
Date Received: 01/16/2016 Truck/Ticket No: N/A / 24421
Curing Method: Standard
Time Sampled: 2:40 pm
Time Batched: 2:27 pm
Temp.: Ambient: 63°F Mix: 68°F
Unit Weight: 146.1 #/cu ft
Quantity Represented: 10 cu. yds. at 1430 cu. yds. placed of a 1780 cu. yd. total placement
Remarks:
Test Method (As Applicable): Unless noted in remarks, concrete was sampled and tested in accordance with ASTM C31, C172, C143,
C1064 and C138. Compressive strength test per ASTM C39. Air Content was per ASTM C231 and
cylinders were not capped per ASTM C617.
Orig: City of Coppell (Coppell, TX) Attn: Mr. Rick O'Dell (1 -cc copy)
Respectfully Submitted,
Alliance Geotechnical Group
Perry C. Kakara, SET, CME Department Manager
THIS REPORT APPLIES ONLY TO THE STANDARDS OR PROCEDURES INDICATED AND TO THE SAMPLE(S) TESTED AND/OR OBSERVED AND ARE NOT NECESSARILY INDICATIVE OF
THE QUALITIES OF APPARENTLY IDENTICAL OR SIMILAR PRODUCTS OR PROCEDURES, NOR DO THEY REPRESENT AN ONGOING QUALITY ASSURANCE PROGRAM UNLESS SO
NOTED. THESE REPORTS ARE FOR THE EXCLUSIVE USE OF THE ADDRESSED CLIENT AND ARE NOT TO BE REPRODUCED WITHOUT WRITTEN PERMISSION.
PM..LIfN'ICE
GEO'TKtif11CRL
OUP
Acct ID: 1770
Report Date: 01/20/2016
Project: Freeport Parkway North
Location: Paving
Consulting Engineering * Geotechnical Engineering * Construction Materials
3228 Halifax Street, Suite A, Dallas, Texas 75247
Phone: (972) 444-8889 Fax: (972) 444-8893
File No: C15-0812
Client: City of Coppell
REPORT. REPORT OF CONCRETE COMPRESSIVE STRENGTH TEST LAB NO: 201195
Test Method: See Below
TEST RESULTS
Set: 16 of 18 Material: Concrete
Location: Station 17+50
Spec
Nbr
A
B
C
D
E
Maximum
Load
(lbs)
119,160
Age Tested
Diameter
Area
Cure
(date : days)
(in)
(int)
Loc
01/18/16:3
6.00
28.27
Lab
01/22/16:7
6.00
28.27
Lab
02/12/16:28
6.00
28.27
Lab
02/12/16:28
6.00
28.27
Lab
Break Type
Type 3
Compressive
Strength
(PSI)
4,210
Date Sampled: 01/15/2016
Sampled By: Reyes, Jason
By Order Of: Walter
Order Number: 1770
Report No: 201195
Page 16 of 18
Number of Specimens: 5
Average
Strength Tested
(PSI) By Comments
4,210 JR
HOLD (see remarks) -
Type 1 Type 2 Type 3 Type 4 Type 5 Type 6
Specification
Strength: 3,600 psi @ 28 days
Slump: 1-3 Slump: 1.5 Inches Transported By: Tiseo
Air Content: 3-6 Air Content: 4.4% Source/Sampled At: Truck /Center
Mix Code: 2605M Plant: On -Site
Date Received: 01/16/2016 Truck/Ticket No: N/A / 24430
Curing Method: Standard
Time Sampled: 3:05 pm
Time Batched: 2:49 pm
Temp.: Ambient: 63°F Mix: 65°F
Unit Weight: 146.5 #/cu ft
Quantity Represented: 10 cu. yds. at 1520 cu. yds. placed of a 1780 cu. yd. total placement
Remarks:
Test Method (As Applicable): Unless noted in remarks, concrete was sampled and tested in accordance with ASTM C31, C172, C143,
C1064 and C138. Compressive strength test per ASTM C39. Air Content was per ASTM C231 and
cylinders were not capped per ASTM C617.
Orig: City of Coppell (Coppell, TX) Att
n: Mr. Rick O'Dell (1 -cc copy)
Respectfully Submitted,
Alliance Geotechnical Group
Perry C, KE,kara
, SET, CME Department Manager
THIS REPORT APPLIES ONLY TO THE STANDARDS OR PROCEDURES INDICATED AND TO THE SAMPLE(S) TESTED AND/OR OBSERVED AND ARE NOT NECESSARILY INDICATIVE OF
THE QUALITIES OF APPARENTLY IDENTICAL OR SIMILAR PRODUCTS OR PROCEDURES, NOR DO THEY REPRESENT AN ONGOING QUALITY ASSURANCE PROGRAM UNLESS SO
NOTED. THESE REPORTS ARE FOR THE EXCLUSIVE USE OF THE ADDRESSED CLIENT AND ARE NOT TO BE REPRODUCED WITHOUT WRITTEN
PERMISSION
ALLIHI'ICE
G GE0TEChMY1CPM_
Qi0_UP
Consulting Engineering * Geotechnical Engineering * Construction Materials
3228 Halifax Street, Suite A, Dallas, Texas 75247
Phone: (972) 444-8889 Fax: (972) 444-8893
Acct ID: 1770 File No: C15-0812 Date Sampled: 01/15/2016
Report Date: 01/20/2016 Sampled By: Reyes, Jason
Project: Freeport Parkway North By Order Of: Walter
Location: Paving Order Number: 1770
Client: City of Coppell
REPORT. REPORT OF CONCRETE COMPRESSIVE STRENGTH TEST LAB NO: 201195
TEST RESULTS
Set: 17 of 18
Material: Concrete
Location:
Station 17+00
Maximum
Compressive
Spec
Age Tested
Diameter
Area Load Cure
Strength
Nbr
(date : days)
(in)
(int) (lbs) Break Type
Loc
(PSI)
A
01/18/16 : 3
6.00
28.27 123,880 Type 3
Lab
4,380
B
01/22/16:7
6.00
28.27
Lab
C
02/12/16:28
6.00
28.27
Lab
D
02/12/16:28
6.00
28.27
Lab
E
Type 1 Type 2 Type 3
Type 4
Type 5
Specification
Strength: 3,600
psi @ 28 days
Test Method: See Below
Report No: 201195
Page 17 of 18
Number of Specimens: 5
Average
Strength Tested
(PSI) By Comments
4,380 JR
17
Type 6
HOLD (see remarks) -
Slump: 1-3 Slump: 1.5 Inches Transported By: Tiseo
Air Content: 3-6 Air Content: 4.5% Source/Sampled At: Truck / Center
Mix Code: 2605M Plant: On -Site
Date Received: 01/16/2016 Truck/Ticket No: N/A/ 24442
Curing Method: Standard
Time Sampled: 3:35 pm
Time Batched: 3:18 pm
Temp.: Ambient: 63°F Mix: 65°F
Unit Weight: 145.9 #/cu ft
Quantity Represented: 10 cu. yds. at 1640 cu. yds. placed of a 1780 cu. yd. total placement
Remarks:
Test Method (As Applicable): Unless noted in remarks, concrete was sampled and tested in accordance with ASTM C31, C172, C143,
C1064 and C138. Compressive strength test per ASTM C39. Air Content was per ASTM C231 and
cylinders were not capped per ASTM C617.
Orig: City of Coppell (Coppell, TX) Attn: Mr. Rick O'Dell (1 -cc copy)
Respectfully Submitted,
Alliance Geotechnical Group
Perry C. Kakafa, SET, CME Department Manager
THIS REPORT APPLIES ONLY TO THE STANDARDS OR PROCEDURES INDICATED AND TO THE SAMPLE(S) TESTED AND/OR OBSERVED AND ARE NOT NECESSARILY INDICATIVE OF
THE QUALITIES OF APPARENTLY IDENTICAL OR SIMILAR PRODUCTS OR PROCEDURES, NOR DO THEY REPRESENT AN ONGOING QUALITY ASSURANCE PROGRAM UNLESS SO
NOTED. THESE REPORTS ARE FOR THE EXCLUSIVE USE OF THE ADDRESSED CLIENT AND ARE NOT TO BE REPRODUCED WITHOUT WRITTEN PERMISSION
J ALLIflnCE
GROUP
Consulting Engineering * Geotechnical Engineering * Construction Materials
3228 Halifax Street, Suite A, Dallas, Texas 75247
Phone: (972) 444-8889 Fax: (972) 444-8893
Acct ID: 1770 File No: C15-0812
Report Date: 01/20/2016
Project: Freeport Parkway North
Location: Paving
Date Sampled: 01/15/2016
Sampled By: Reyes, Jason
By Order Of: Walter
Order Number: 1770
Client: City of Coppell
REPORT. REPORT OF CONCRETE COMPRESSIVE STRENGTH TEST LAB NO: 201195
Test Method: See Below
Set: 18 of 18
Location: Station 16+50
Spec Age Tested
Nbr (date : days)
TEST RESULTS
Material: Concrete
Maximum
Diameter Area Load
(in) (int) (lbs)
Compressive
Cure Strength
Break Type Loc (PSI)
Report No: 201195
Page 18 of 18
Number of Specimens: 5
Average
Strength Tested
(PSI) By Comments
A 01/18/16: 3 6.00 28.27 138,520 Type 3 Lab 4,900 4,900 JR
B 01/22/16:7 6.00 28.27
Lab
C 02/12/16:28 6.00 28.27
Lab
D 02/12/16:28 6.00 28.27
Lab
E
HOLD (see remarks) -
7 M T [_] n
Type 1
Type 2 Type 3 Type 4 Type 5 Type 6
Specification
Strength: 3,600 psi @ 28 days
Slump: 1-3
Slump: 1.5 Inches Transported By: Tiseo
Air Content: 3-6
Air Content: 4.0% Source/Sampled At: Truck / Center
Mix Code: 2605M Plant: On -Site
Date Received: 01/16/2016
Truck/Ticket No: N/A/ 24450
Curing Method: Standard
Time Sampled: 3:50 pm
Time Batched: 3:37 pm
Temp.: Ambient: 63°F Mix: 66°F
Unit Weight: 147.6 #/cu ft
Quantity Represented: 10 cu. yds. at 1720 cu. yds. placed of a 1780 cu. yd. total placement
Remarks:
Test Method (As Applicable): Unless noted in remarks,
concrete was sampled and tested in accordance with ASTM C31, C172, C143,
C1064 and C138.
Compressive strength test per ASTM C39. Air Content was per ASTM C231 and
cylinders were not
capped per ASTM C617.
Orig: City of Coppell (Coppell, TX) Attn: Mr. Rick O'Dell (1 -cc copy)
Respectfully Submitted,
Alliance Geotechnical Group
Perry C. Kakara, SET, CME Department Manager
THIS REPORT APPLIES ONLY TO THE STANDARDS OR PROCEDURES INDICATED AND TO THE SAMPLE(S) TESTED AND/OR OBSERVED AND ARE NOT NECESSARILY INDICATIVE OF
THE QUALITIES OF APPARENTLY IDENTICAL OR SIMILAR PRODUCTS OR PROCEDURES, NOR DO THEY REPRESENT AN ONGOING QUALITY ASSURANCE PROGRAM UNLESS SO
NOTED. THESE REPORTS ARE FOR THE EXCLUSIVE USE OF THE ADDRESSED CLIENT AND ARE NOT TO BE REPRODUCED WITHOUT WRITTEN PERMISSION.