Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Copperstone-LR 960402 (2)
G~O-- CO' 'ULTING ENGINEERS IN: · ~XQ~, Environmental Assessments ~. Soils & Foundations Construction Materials Testing "Excellence by Experience" Co~ercial & Industrial Inspection PO Box 92548 · Southlake, Texas 76092 · (817) 329-0281 CONCRETE CYLINDER TEST RESULTS PROJECT= Copperstone LOCATION: Coppell JOB #: 95-1522 DATE OF BREAK: 04-02-96 DAY: Tuesday CLIENT: Copperstone Ltd CONTRACTOR: Clack Construction c/o Briscoe Clark Comp SUB-CONTRACTOR: Beck Foundations CYL. SLUMP DATE OF DAYS I.D. LOCATION (IN.) SAMPLE AGED POUNDS PSI Uppermost Rip Rap: 46A @ west side 1.0" 03-26-96 7 106,000 3750 46B @ west side 1.0" 03-26-96 7 105,000 3714 SPECIFICATIONS: 4000 psi @ 28 days SUPPLIER: Lattimore Glenn Hutchinson Technician