Loading...
ST0301C- LR160203GI • GEOTECHNICAL ENGINEERING E I • ENVIRONMENTAL CONSULTING E I • CONSTRUCTION MATERIALS TESTING GEE Consultants, Inc. i t 10046 Monroe Drive A Dallas, Texas 75229 • (214) 352-5433 • Fax (214) 352-6972 Report Date: February', 3, 2016 Date Concrete Placed: January 4, 2016 Standard 6"x12" Cylinders Client: City of Coppell Cylinder Cross-sectional Area: 28.27 Square Inches Project: Bethel &', Coppell Road Concrete Report No.: 57 Contractor: Axis Contracting, Inc. Project No.: 215-140 Concrete Supplier and Plant: TXI Operation, LP 131 Location of Placement: Driveway Approach 528 Source / SSD Batch Wts. MATERIALS Description (Lbs/CuYd) OBSERVATION DATA Mix Number: 8274 Time Sample Batched: 11:37 AM Cement: 6 Sack Time Sampled: 1:00 AM Fly Ash: Coarse Aggregate: Intermediate Aggregate: Fine Aggregate: Admixtures: 2 Added Water: Sample Location: Truck / Ticket No: Temperature: Ambient Range: Concrete Range: Slump Range (inches): Weather Conditions: Time Started: Time Completed: Sample Air Content (%): Total Cubic Yards Placed: Require Stren h (Lbs./s .in.): S. Coppell Rd. Driveway 528 0000/3126500 50 of 60 OF 5.5 Clear 11:00 AM 4:30 PM Not Tested 10.0 4,000 Specimen Number Measured Slump (in.) Age (Days) Date Tested Total Load (Lbs.) Compressive Strength (Lbs./Sq.In.) Remarks BCR 262 7 1/11/16 98,680 3,490 BCR 263 28 2/1/16 135,540 4,790 BCR 264 5.5 28 2/1/16 142,340 5,040 BCR 265 H H Test Methods Utilized Fracture Regular Cylinders Made By: YS ASTM C-31, C-39, C-143 (Unless Noted Otherwise) Remarks and/or Distribution: cc: Mr. Rick Odell - City of Coppell via E-mail: Rodell(ckoppelltx.gov Mr. Michelle Matunas - City of Coppell via Email: mmatunas cr,coppelltx.gov Mr. George Marshall - City of Coppell via Email: RmarshalKkoPyelltx..g Mr. Robert Caudill - Tiseo Paving via Email: reaudill a,tiseopavin corn F-3212 All letters and reports are for the exclusive use of the client to whom they are addressed and shall not be reproduced without the full approval of GEE Consultants, Inc. 'the use of our name must receive our prior written approval. Our letters and reports apply only to the sample tested and/or observed and are not necessarily indicative of the quantities of apparently identical or similar products. G1 • GEOTECHNICAL ENGINEERING E I • ENVIRONMENTAL CONSULTING E I • CONSTRUCTION MATERIALS TESTING GEE Consultants, Inc. 10046 Monroe Drive • Dallas, Texas 75229 (214) 352-5433 • Fax (214) 352-6972 REPORT OF CONCRETE MIX OBSERVATION Report Date: February, 3, 2016 Date Concrete Placed: January 6, 2016 Standard 6"x12" Cylinders Client: City of Coppell Cylinder Cross-sectional Area: 28.27 Square Inches Project: Bethel & Coppell Road Concrete Report No.: 58 Contractor: Axis Contracting, Inc. Project No.: 215-140 Concrete Supplier and Plant: TXI Operation, LP 141 Location of Placement: S. Coppell Rd., E. Side Sidewalk, 40' S. from Heath 1.n. MATERIALS Source / SSD Batch Wts. OBSERVATION DATA Description (Lbs/CuYd) Mix Number: 8272 Cement: 5 Sack Fly Ash: Coarse Aggregate: Intermediate Aggregate: Fine Aggregate: Admixtures: 1 2 Added Water: Time Sample Batched: Time Sampled: Sample Location: Truck / Ticket No: Temperature: Ambient Range: Concrete Range: Slump Range (inches): Weather Conditions: Time Started: Time Completed: Sample Air Content (%}: Total Cubic Yards Placed: V-;-1 1 gtrnnoth 11 he /cn in 1 9:32 AM 10:20 AM S. Coppell Rd., 40' S. from Health Ln. Right Sidewalk 01/3129784 45 OF 55 OF 5.5 Cloudy 9:00 AM 1:30 PM 3.0 10.0 4 000 Specimen Number Measured Slump (in.) Age (Days) Date Tested Total Load (Lbs.) Compressive Strength (Lbs./Sq.In.) Remarks BCR 266 7 1/13/16 100,400 3,550 BCR 267 28 2/3/16 120,800 4,270 BCR 268 5.5 28 2/3/16 128,140 4,530 BCR 269 H H Test Methods Utilized Fracture Regular Cylinders Made By: YS ASTM C-31, C-39, C-143 (Unless Noted Otherwise) Remarks and/or Distribution: cc: Mr. Rick Odell - City of Coppell via E-mail: Rodellacoppelltx.aov Mr. Michelle Matunas - City of Coppell via Email: mmatunas(cbcoppelltx.gov Mr. George Marshall - City of Coppell via Email: gmarshall(cicoppelltxjgov Mr. Robert Caudill - Tiseo Paving via Email: rcaudillAtiiseopaving.com GEE Consultants, Inc TBPE Firm: F-3212 xevtewea ny; All letters and reports are for the exclusive use of the client to whom they are addressed and shall not be reproduced without the full approval of GEE Consultants, Inc. The use of our name must receive our prior written approval. Our letters and reports apply only to the sample tested and/or observed and are not necessarily indicative of the quantities of apparently identical or similar products.