Loading...
ST0301C- LR160122 (2)• GEOTECHNICAL ENGINEERING * ENVIRONMENTAL CONSULTING WEE Consultants, Inc. E • CONSTRUCTION MATERIALS TESTING 10046 Monroe Drive • Dallas, Texas 75229 • (214) 352-5433 • Fax (214) 352-6972 REPORT OF IN-PLACE DENSITY AND MOISTURE OF SOIL Density Report No. 30 (215-140) Method: ASTM D2922 D3017 D698 Page 1 of 2 Client: City of Coppell Project: Bethel & Coppell Rd. Test Date: January 22, 2016 Report Date: January 28, 2016 Required Density (%): Min. 95% Required Moisture (%): General Fill - Opt. Moisture Content -20% to +4% Material Description Maximum Optimum Dry Density Moisture (Lbs./cu.ft.) Content (Percent) 1. Light Brown Clayey Sand 106.3 13.8 W/ Gravel 2. Dark Brown Clayey Sand W/ Organics 104.8 15.2 3. Brown and Yellowish Brown Clayey Sand 108.1 16.1 W/ OCC. LS Frags and Sand Pkts. 4. Brown and Reddish Brown Clayey Sand 115.3 11.8 W/ LS gravel & Sandy Shale Frags 5. Brown Sandy Clay (Lime Treated) (North 96.7 22.4 Side) 6. Brown Sandy Clay (Lime Treated) (South 103.0 1910 Side) 7. Reddish Brown Clayey Sand and Reddish 112.2 14.0 Brown, Yellow Brown and Light Gray Sandy Shaley Clay 8. Dark Gray and Gray Sandy Clay 102.4 19.8 278 I 7 I 6 124" Storm Drain at Station 2+50.62, 3' Below Existing Grade 280 7 6 24" Storm Drain at Station 2+50.62, 1' Below Existing Grade 282 I 7 I 6 124" Storm Drain at Station 1+62.19, 2' Below Existing Grade 284 7 6 24" Storm Drain at Station 1+62.19, on Existing Grade 1.16.0 ( 13.9 1 103.4 117.5 1 12.9 1 104.7 City of Coppell January 28, 2016 cc: Mr. Rick Odell - City of Coppell via E-mail: Rodell(d,)coippelltX.gov Mr. Michelle Matunas - City of Coppell via Email: mmatunasAcoppelltx.gov Mr. George Marshall - City of Coppell via Email: gLnarshall@coi)Pelltx.gov Mr. Robert Caudill - Tiseo Paving via Email: rcaudillAtiseopaving.com GEE Consultants, Inc. TBPE Firm: F-3212 Reviewed by: All letters and reports are for the exclusive use of the client to whom they are addressed and shall not be reproduced without the full approval of GEE Consultants, Inc. The use of our name must receive our prior written approval. Our letters and reports apply only to the sample tested and/or observed and are not necessarily indicative of the quantities of apparently identical or similar products GEE Consultants, Inc. Project No. 215-140 In -Place Density Report No. 30 Page 2 of 2 INICAL ENGINEERING VIRONMENTAL CONSULTING • CONSTRUCTION MATERIALS TESTING GEE Consultants, Inc. 10046 Monroe Drive Dallas, Texas 75229 9 (214) 352-5433 0 Fax (214) 352-6972 REPORT OF IN-PLACE DENSITY AND MOISTURE OF SOIL Density Report No. 31 (215-140) Method: ASTM D2922 D3017 D698 Page 1 of 1 Client: City of Coppell Project: Bethel & Coppell Rd. Test Date: January 25, 2016 Report Date: January 28, 2016 Required Density (%): Min. 95% Required Moisture (%): General Fill - Opt. Moisture Content -2% to +4% Material Description Maximum Optimum Dry Density Moisture (Lbs./cu.ft.) Content (Percent) 1. Light Brown Clayey Sand 106.3 13.8 W/ Gravel 2. Dark Brown Clayey Sand W/ Organics 104.8 15.2 3. Brown and Yellowish Brown Clayey Sand 108.1 16.1 W/ OCC. LS Frags and Sand Pkts. 4. Brown and Reddish Brown Clayey Sand 115.3 11.8 W/ LS gravel & Sandy Shale Frogs 5. Brown Sandy Clay (Lime Treated) (North 96.7 22.4 Side) 6. Brown Sandy Clay (Lime Treated) (South 103.0 19.0 Side) 7. Reddish Brown Clayey Sand and Reddish 112.2 14.0 Brown, Yellow Brown and Light Gray Sandy Shaley Clay 8. Dark Gray and Gray Sandy Clay 102.4 19.8 285 7 6 Line C, 21" Storm Drain at Station 3+75, 4' 120.2 12.9 107.1 Below Existing Grade 287 I 7 I 6 Line C, 21" Storm Drain at Station 3+75, 2' I 121.5 I 13.4 I 108.3 Below Existing Grade 289 4 6 Line C, 21" Storm Drain at Station 3+75, on 122.1 11.5 105.9 Existing Grade cc: Mr. Rick Odell - City of Coppell via E-mail: Rodell(ai)coppelltx,g.(Ly Mr. Michelle Matunas - City of Coppell via Email: mrnatunas(a coppelltx.gov Mr. George Marshall - City of Coppell via Email: gmarshall(&coppeiltx Rov Mr. Robert Caudill - Tiseo Paving via Email. rcaudill(ctiseopavin ,.cam _ GEE Consultants, Inc. TBP'E Firm: F-3212 Reviewed by: All letters and reports are for the exclusive use of the client to whom they are addressed and shall not be reproduced without the full approval of GEE Consultants, Inc. The use of our name must receive our prior written approval. Our letters and reports apply only to the sample tested and/or observed and are not necessarily indicative of the quantities of apparently identical or similar products G1 • GEOTECHNICAL ENGINEERING E • ENVIRONMENTAL CONSULTING GEE Consultants, Inc. J1 • CONSTRUCTION MATERIALS TESTING 10046 Monroe Drive • Dallas, Texas 75229 • (214) 352-5433 • Fax (214) 352-6972 REPORT OF IN-PLACE DENSITY AND MOISTURE OF SOIL Density Report No. 33 (215-140) Method: ASTM D2922 D3017 D698 Page 1 of 2 Client: City of Coppell Project: Bethel & Coppell Rd. Test Date: January 27, 2016 Report Date: February 1, 2016 Required Density (%): Min. 95% Required Moisture (%): General Fill - Opt. Moisture Content -2% to +4% Material Description Maximum Optimum Dry Density Moisture (Lbs./cu.ft.) Content (Percent) 1. Light Brown Clayey Sand 106.3 13.8 W/ Gravel 2. Dark Brown Clayey Sand W/ Organics 104.8 15.2 3. Brown and Yellowish Brown Clayey Sand 108.1 16.1 W/ OCC. LS Frags and Sand Pkts. 4. Brown and Reddish Brown Clayey Sand 115.3 11.8 W/ LS gravel & Sandy Shale Frags 5. Brown Sandy Clay (Lime Treated) (North 96.7 22.4 Side) 6. Brown Sandy Clay (Lime Treated) (South 103.0 19.0 Side) 7. Reddish Brown Clayey Sand and Reddish 112.2 14.0 Brown, Yellow Brown and Light Gray Sandy Shaley Clay 8. Dark Gray and Gray Sandy Clay 102.4 19.8 296 8 6 Bethel Rd., Station 5+70, Line C, 21" Storm 104.7 18.7 102.2 Drain (Storm Drain at Park Rd.), 7' Below Existing Grade 298 7 6 Bethel Rd., Station 5+70, Line C, 21" Storm 110.6 13.4 98.6 Drain (Storm Drain at Park Rd.), 5' Below Existing Grade 300 7 6 Bethel Rd., Station 5+70, Line C, 21" Storm 110.8 13.7 98.8 Drain. (Storm Drain at Park Rd.), 3' Below Existing Grade City of Coppell February 1, 2016 cc: Mr. Rick Odell - City of Coppell via E-mail: RodellAcoppelltx.gov Mr. Michelle MatUrlas - City of Coppell via Email: mmatunasAC0DpelltX.gov Mr. George Marshall - City of Coppell via Email:gmarshallAcoDntfl!LM Mr. Robert Caudill - Tiseo Paving via Email: rcaudill(a)tiseopaving.com GEE Consultants, Inc. TBPE Firm: F-3212 Reviewed by: All letters and reports are for the exclusive use of the client to whom they are addressed and shall not be reproduced without the full approval of GEE Consultants, Inc. The use of our name must receive our prior written approval. Our letters and reports apply only to the sample tested and/or observed and are not necessarily indicative of the quantities of apparently identical or similar products GEE Consultants, Inc. Project No. 215-140 In -Place Density Report No. 33 Page 2 of 2 IGI • GEOTECHNICAL. ENGINEERING E • ENVIRONMENTAL CONSULTING GEE Consultanis, Inc, L-. J * CONSTRUCTION MATERIALS TESTING 10046 Monroe Drive Dallas, Texas 75229 • (214) 352-5433 0 Fax (214) 352-6972 REPORT OF IN-PLACE DENSITY AND MOISTURE OF SOIL Density Report No. 34 (215-140) Method: ASTM D2922 D3017 D698 Page I of 1 Client: City of Coppell Project: Bethel & Coppell Rd. Test Date: January 28, 2016 Report Date: February 1, 2016 Required Density (%): Min. 95% Required Moisture (%): General Fill - Opt. Moisture Content -2% to +4% Material Description 1. Light Brown Clayey Sand W/ Gravel 2. Dark Brown Clayey Sand W/ Organics 3. Brown and Yellowish Brown Clayey Sand W/ OCC. LS Frags and Sand Pkts. 4. Brown and Reddish Brown Clayey Sand W/ LS gravel & Sandy Shale Frags 5. Brown Sandy Clay (Lime Treated) (North Side) 6. Brown Sandy Clay (Lime Treated) (South Side) 7. Reddish Brown Clayey Sand and Reddish Brown, Yellow Brown and Light Gray Sandy Shaley Clay 8. Dark Gray and Gray Sandy Clay Maximum Optimum Dry Density Moisture (Lbs./cu.ft.) Content (Percent) 106.3 13.8 104.8 15.2 108.1 16.1 115.3 11.8 96.7 22.4 103.0 19.0 112.2 14.0 102.4 19.8 304 4 6 Sidewalk in Front of 572, N. Bound 114.9 12.7 99.7 77 Q 4 6 Slci walk it,& edge bf Culbert 118.6 ; 11:8 306 3 6 Sidewalk in Front of 616 N. Bound 105.1 18.1 97.2 cc: Mr. Rick Odell - City of Coppell via E-mail: Rodell(a)coppelltx.aov Mr. Michelle Matunas - City of Coppell via Email: mmatunas@,coppelitx.gov Mr. George Marshall - City of Coppell via Email: gmarshall(&,coppeell Dov Mr. Robert Caudill - Tiseo Paving via Email: rcaudillgtiseopavin .com GEE Consultants, :[n¢. TBPE Firm: F-3212 Reviewed b All letters and reports are for the exclusive use of the client to whom they are addressed and shall not be reproduced without the full approval of GEE Consultants, Inc. The use of our name must receive our prior written approval. Our letters and reports apply only to the sample tested and/or observed and are not necessarily indicative of the quantities of apparently identical or similar products