Loading...
Copperstone-LR 960329 G~O- C¢ ULTING ENGINEERS IN: T~Z~JBe Environmental Assessments ~, Soils & Foundations Construction Materials Testing "Excellence by Experience" Commercial & Industrial Inspection PO Box 92548 · South[ake, Texas 76092 · (817) 329-0281 CONCRETE CYLINDER TEST RESULTS PROJECT: Copperstone LOCATION: Coppell JOB #: 95-1522 DATE OF BREAK: 03-29-96 DAY: Friday CLIENT: Copperstone Ltd CONTRACTOR: Clack Construction c/o Briscoe Clark Comp SUB-CONTRACTOR: Beck Foundations CYL. SLUMP DATE OF DAYS I.D. LOCATION (IN.) SAMPLE AGED POUNDS PSI center bent: 17C @ Column D 4.0" 03-01-96 28 136,500 4828 17D @ Column D 4.0" 03-01-96 28 137,500 4864 72' drilled pier C: 18C @ west abutment 6.5" 03-01-96 28 126,500 4475 18D @ west abutment 6.5" 03-01-96 28 128,000 4528 SPECIFICATIONS: 3600 psi @ 28 days SUPPLIER: Pioneer Glenn Hutchinson Technician