Loading...
ST0502B- LR160216 (2)19LLIfWCE GGEOTECNnlCfiL GROUP Consulting Engineering * Geotechnical Engineering * Construction Materials 3228 Halifax Street, Suite A, Dallas, Texas 7524.7 Phone: (972) 444-8889 Fax: (972) 444-8893 Acct ID: 1770 File No: C15-0812 Date Sampled: 02/16/2016 Report Date: 02/17/2016 Sampled By: Danny Speaks Project: Freeport Parkway North By Order Of: Walter Location: Concrete - rebar Inspection Order Number: 1770 Client: City of Coppell REPORT: Reinforcing Steel Inspection LAB NO: 203601-1 TEST RESULTS Report No: 203601-1 Page 1 of 1 We visually inspected the reinforcing steel for footings. Our inspection included verifying the proper size of the reinforcing steel including diameter, length, bends and anchorage, and the grade and the location of the bars including spacing and cover. We also verified proper splicing, checked stability of tying, and checked the reinforcing steel for excessive rust deposits. Footings: Retaining wall at Station 2+64.10 to 2+99.08 Drawing Date: 1/23/2015 • Details Referenced: S-37, 12' Wall height • Remarks: Rebar in accordance with project plans and specifications. Chairs necessary in various locations - corrected. 12' Retaining wall section. Ong: City of Coppell (Coppell, TX) Attn: Mr Rick O'Dell (1 -cc copy) Respectfully Submitted, Alliance Geotechnical Group Perry C. Kakara, SET, CME Department Manager THIS PEPORTAPPLIL=S ONIY TO THE STANDARDS OR PROCEDURES INDICATED AND TO THE SAMPLE(S) TESTED AND/OR OBSERVED AND ARE NOT NECESSARILY INDICATIVE 01= I I1E QUALII IES OF APPARENTLY IDENTICAL OR SIMILAR PRODUCTS OR PROCEDURES, NOR DO THEY REPRESENT AN ONGOING QUALITY ASSURANCE PROGRAM UNLESS SO NOTED THESE REPORTS ARE FOR THE EXCLUSIVE USE OF THE ADDRESSED CLIENT AND ARE NOT TO BE REPRODUCED WITHOUT WRITTEN PERMISSION.