Loading...
Copperstone-LR 960320 (2) G~)- COWqULTING ENGINEERS IN: T~r~QU~e .~ Envirom~nta[ Assessments X~, Soils & Foundations Construction Materials Testing ,'Excellence by Experience" Co~ercia[ & Industrial Inspection PO Box 92548 · $outh[ake, Texas 76092 · (817) 329-0281 CONCRETE CYLINDER TEST RESULTS PROJECT: Copper Stone LOCATION: Coppell JOB #: 95-1522 DATE OF BREAK: 03-20-96 DAY: Wednesday CLIENT: Copper Stone Ltd CONTRACTOR: Clack Construction c/o Briscoe Clark Comp SUB-CONTRACTOR: Beck Foundations CYL. SLUMP DATE OF D&YS I.D. LOC~TION (IN.) SAMPLE ~ED POUNDS PSI 33A @ 40' pier I 6.5" 03-13-96 7 123,000 4351 33B @ 40' pier I 6.5" 03-13-96 7 124,000 4386 Backwall: 34A @ west abutment 3.0" 03-13-96 7 92,000 3254 34B @ west abutment 3.0" 03-13-96 7 91,000 3219 SPECIFIC&TIONS: 3600 psi @ 28 days SUPPLIER: Pioneer Jeff Holden Technician