Loading...
2015_1023 IRRIGATION DOMESTIC i-lRELINE X The following fonn must be completed foi- each assembly tested. A signed and dated original must be submitted to the public water supplier for recordkeepi��g pui-poses: BAC�CFLOW PRE�FENTION ASSEMSLY'�EST��v'D 1RAI�iTE'V.�NCE REPORT NAME OF PWS: CITY OF CQPPELL PWS I.D. #0�7004a (Customer) MAILII�G ADDRESS: 253 Gl�b Gircfe Dr Co��ell TX 75019 GONTACT PERSON/PHONE: ni 214- -0 3 LOCATION OFSERVICE: [�c�(�, S„„�,A „��,,,,o The backflow prevention asscmbly detailed below has been tested and maint�ined as required by commission regulations and is ccrtificd to be operating�vithin acceptable i�arainet�rs. 7'YPE OF ASSEIl��BLI' Reduced Pressure Principle Reduced Pressure Princip(e-Detector X Double Check Val��e Dozible Clieck-Detector PressureVacuumBreaker Spi1l=Resistant Pi•essure Vacuum Breaker Manufactui•er �F�,,�,�.5 i�Iodel Number �.��8 Size /�� Located At Q. Seri�►1 Nu�nher 1IolC9(o Is the assemb y installed in accordance with manufacturer reconunendations andior local codes'? eS Reduced Pressiare Princi le�4sse�nbhr Pressure Vacuum Breaker Double Check Valve Assembly Relief Val�=e Air Inlet Check Valve I st Check 2nd Check ��,�j Held at 2.Z psid Neld at 1•� psid Opencd at Orcned at Held at Initial Test C'losed T'ight✓ Closed Tight v psid psid psid Leaked Leaked Did not open Did not open Leaked Repairs/ Materials Used Held at psid Held at psid Test After � Opencd at Opened at HeJd at Repair Closed Tight ' Closed Tight psid psid psid Test�auge used: Make/Model Anollo 40-200-tk5u SN: 04142867 Date Tested for Accuracy: 5/4/2015 Remarks: The above is certified to be true at the time of testina. Firm Name Diamondback Fire Protection Firnl Address PO Box 2507, Waxahachie,TX 75168 Certificd Tester{�„-:r:tl,loe Standridae Certitied Tester(signature) Finn Phonc# (214)444-3194 Ceirt.Testcr No. BP0015823 I)ate 10/23/2015 �TEST RECORDS MUST BE KEPT FOR AT LEAST THREE 1'EARS M�USE�NLY MANUFACTURER`S REPLACEA�ENT PARTS White-City Copy �'elioiv-Customer�'opy Pink-Tester's Copy