Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Copperstone-LR 960319
G~'O- CO-~'qULTING ENGINEERS IN,' T~I~QU~e Envi ronmental Assessments ~.~(~ Soils & Foundations Construction Materials Testing -Excellence by Experience" ComaerciaL & [ndustriat [nspection PO Box 92548 * SouthLake, Texas 76092 · (817) 329-0281 CONCRETE CYLINDER TEST RESULTS PROJECT: Copper Stone LOCATION: Coppell JOB #: 95-1522 DATE OF BREAK: 03-19-96 DAY: Tuesday CLIENT: Copper Stone Ltd CONTRACTOR: Clack Construction c/o Briscoe Clark Comp SUB-CONTRACTOR: Beck Foundations CYL. SLUMP DATE OF DaYS I.D. LOCATION (IN.) SAMPLE AGED POUNDS PSI 72' drilled pier E: 31A @ east abutment 6.5" 03-12-96 7 120,000 4245 3lB @ east abutment 6.5" 03-12-96 7 121,000 4280 Westbound Bridge, Bent #1: lC @ 30" column Cl 6.0" 02-20-96 28 118,500 4192 1D @ 30" column C1 6.0" 02-20-96 28 119,000 4209 SPECIFICATIONS: 3600 psi @ 28 days SUPPLIER: Pioneer Jeff Holden Technician