Loading...
2015_1023 IRRIGATION DOMEST►C F!RELINE X The following farm must be completed for eacll assembly tested. A �igned and dated original must be submitted to the public water supplier for i•ecordkeeping ptu-poses: BACKFLOW PRE�'ENTION.�SSEMBLY TEST,�1�D M��,I�m'TE'VA!�iCE REPORT NAME OF PWS: CITY OF CQPPELL PVvS I.D. #Q�70040 (Customer) MAILING ADDRESS: �53 Club Circle Dr. CoR�ell TX 75019 CONTACT PERSOiv'/PHONE: i 214- - LOCATION OF SERVICE: I(��Iq T� ��o The backflow prevention assembly detailed belo���l�as been tested and maintained as required by commission regulations and is certified to be operating evithin accept�blc��aramet�rs. TYPE OF��SENI�L�' Reduced Pressure Principle Reduced Pressure Principle-Detector X Double Check Valve Double Check-Detector PressiucVacuumBreaker Spill=Resistant Pressure Vacuum Breaker Manufacturer��,¢_ti tYlodel Number 2F•Y.nO�P, Size 1" Located �1t ��a.n.�- Serial Ninnbec 13a12� Is the assembly installed m accordance u�ith mauufactiu-er recommendations ancUor local codes'? Reciuced Pressure Princi le Assembhr Pre�sure Vacui�i»Breaker Double Check Valve Assembly I st Check � Relief VahTe Air Inlet Check L'alve nd Check CM�g Held at 1•�psid He1c1 at 1_�psid O�en�d at__ Qprncd at Hcld at � Initial Test Closed Tight✓ Closed Tight ✓ psid p,i� ��yi�� Leaked Leaked Did not open L�id not open Leaked Repairs/ Materials Used Held at psid H�Id at ��sid Test After Opei�ed at Opened at Held at Repair Closed Tight ' Closed Tight psid }�sid �sid Test�auge used: Make/Model_�pllo 40-200-tk5u SN: 04142867 Date Tested for Accuracy: 5/4/2015 Remarks: The above is certified to be true at the time of testina. Finn Namc Diamondbadc Fire Protection Firn1 Address PO Box 2507. Waxahachie TX 75168 Certitied Tester{�,r;��t�oe Standridae Certitied Tester(signat<<re) Firm Phonc# (214)4443194 Cert.Tester No. BP0015823 [)ate 10/23/2015 '`TEST RECORDS MUST BE KEPT FOR AT LEAST THREE YEARS �'� USE ONLY MANUFACTURER'S REPLACEYIENT PARTS White-City Copy Yello�v-Customer Copy Pink-Tester's Copy