Loading...
2014_1006 ___ _ ____ C�IECK �NE: IRRIGATION DOMESTIC gIRg�g X BACIQ�'I.OW PREVENTION ASSEMBLY TEST AND MATNTENANCE REPOR? rr�OF Pws: CITY OF COPPELL PWS I.D.# LOCATION OFSERVICE: Estates of Coppell 1007 Independence The baci��]ow prevention assembly detailed beiow has beca tested aad maintaiaod as required bv TNRCC re�t�latioas and is cerdfied to be operating withia acceptable parameters. TYPE OF ASSEMBLY e Rtduced Press�e Priaciple e Pressw�e Vacu�Breaker � Double Check Valve O Amaosphere Vacuum Breaker Maaufacnaer IQVY1�,.5 Siu I r� Model lvumber o`W�J, Locaud At �6 7r�i �� s«;�x�v� �5��P REDUCED PRESSURE PRINCIPLE ASSEMBLY PRESSURE VAC[TUM BREAI�R Double Check�alve Ass�bly ' lst C3eck 2ad Cbeci: Rdiet Valve Air ldet Check Va1ve ' Inival Test DC-Closed Closod Tight Opened at Opeaed at �sid ' Tight �'�' Leaked 7,v o _nsid _nsid R.P-_psid Leal;ed o Did not Open o Lesl:ed ❑ li and� � � Mataials ' ' Uud Test After DC-Closed Closod Tight o Opeaed ac Opened at _�d ; Repait Tight o �Dsid osid ' RP sid The above is ccrtified to be true. , � F'itIIf AT�C1-AFire&Domestic mes'ti ng Ce[�ified T� ' ' F�p�PO Box 7 9 5 4 8 Cert Testa No.BP 0 015 3 8 5 Date�`� Fort Worth Tx 76179 Gauge # 06070576 Date Iast accuracy tested 12/3/13 White-Customer's Copy Yellow -City Copy Pink-Tester's Copy