Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Copperstone-LR 960313
G~- CONSULTING ENGINEERS IN: T:~I~]IIXQ~e _ .nvironmentat Assessments :3::~1(~, - SoiLs & Foundations Construction MateriaLs Testing .Exce[ience byExperJence" Comnercia[ & Industrial Inspection PO Box 92548 · South[ake, Texas 76092 · (817) 329-0281 CONCRETE CYLINDER TEST RESULTS PROJECT: Copper Stone LOCATION: Coppell JOB #: 95-1522 DATE OF BREAK: 03-13-96 DAY: Wednesday CLIENT: Copper Stone Ltd CONTRACTOR: Glenn Thurman, Inc c/o Briscoe Clark Comp CYL. SLUMP DATE OF DAYS I.D. LOCATION (IN.) SAMPLE AGED POUNDS PSI Martel Ln: 27A @ cul-de-sac 5.0" 03-06-96 7 99,000 3502 27B @ cul-de-sac 5.0" 03-06-96 7 99,500 3520 Alley A-2: 28A @ Station 1+50 1.0" 03-06-96 7 101,500 3590 28B @ Station 1+50 1.0" 03-06-96 7 100,500 3555 SPECIFICATIONS: 3000 psi @ 28 days SUPPLIER: Glenn Thurman, Inc Glenn Hutchinson Technician